by Samana Developers in Saih Shuaib 2
Samana Hills South 3 is a residential project by Samana Developers in Saih Shuaib 2, Dubai, with prices from AED 998 889, handover 31.08.2028, construction 4.6% complete per the DLD registry.
Construction progress
- Handover31.08.2028
- Status date22.06.2026
- DLD project number4074
Data from the Dubai Land Department project registry (updated 08.08.2026 10:48).
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: Samana Developers · District: Saih Shuaib 2
Recent transactions
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 04.08.2026 | 1 BR | 73.0 | 969 000 |
| 24.07.2026 | 1 BR | 73.0 | 969 000 |
| 21.07.2026 | 1 BR | 61.6 | 949 000 |
| 21.07.2026 | 2 BR | 81.8 | 1 199 000 |
| 16.07.2026 | 1 BR | 73.0 | 969 000 |
| 16.07.2026 | 1 BR | 73.0 | 1 121 548 |
| 16.07.2026 | 1 BR | 67.7 | 991 056 |
| 03.07.2026 | 2 BR | 95.0 | 1 431 787 |
| 03.07.2026 | 1 BR | 67.7 | 949 000 |
| 01.07.2026 | 1 BR | 73.0 | 912 000 |
| 25.06.2026 | 1 BR | 69.4 | 1 033 061 |
| 25.06.2026 | 1 BR | 67.7 | 926 670 |
| 24.06.2026 | 1 BR | 67.7 | 949 000 |
| 22.06.2026 | 1 BR | 67.7 | 915 505 |
| 18.06.2026 | 1 BR | 73.0 | 969 000 |
| 18.06.2026 | 1 BR | 67.7 | 949 000 |
| 17.06.2026 | 1 BR | 73.0 | 934 800 |
| 08.06.2026 | 1 BR | 61.8 | 949 000 |
| 01.06.2026 | 2 BR | 81.8 | 1 266 764 |
| 26.05.2026 | Studio | 34.1 | 485 214 |
Dubai Land Department transaction registry, updated 2026-08-07. Explore Dubai property transactions →
About the project
Samana Hills South 3 is a 147-unit development by Samana Signature Real Estate Developments in Saih Shuaib 2, within Dubai Industrial City in the Dubai South masterplan. The project comprises one G+5+R building. It is active, with construction recorded at 4.60% completion on 22 June 2026 and planned completion on 31 August 2028.
Project configuration
Samana Hills South 3 is planned as a single building with a G+5+R configuration. The project has 147 units and a total recorded area of 8,791.25. Its project number is 4074. Construction began on 1 September 2025, placing the scheme within the current development cycle of Saih Shuaib 2. The development is located in a subcommunity that forms part of Dubai Industrial City, itself within the Dubai South masterplan. This setting combines industrial, development and residential uses, including accommodation that supports workforce and operational requirements.
Construction progress and completion
The project is active. Its recorded completion ratio was 4.60% following an inspection dated 22 June 2026. The project information was updated on 26 June 2026. The scheduled completion date is 31 August 2028. Samana Hills South 3 has a project start date of 1 September 2025 and one planned building. The development therefore has a defined project timeline from commencement in September 2025 through to its scheduled completion at the end of August 2028.
Saih Shuaib 2 and Dubai South
Samana Hills South 3 is in Saih Shuaib 2, a subcommunity within Dubai Industrial City and the wider Dubai South masterplan. Saih Shuaib 2 is located at coordinates 24.872133, 55.053492. The community contains 15 projects comprising 1,558 units. Three projects are under development and five schemes have been completed. Development in the area reflects the broader Dubai Industrial City mix of industrial, logistics, supporting residential and workforce-accommodation schemes. Al Maktoum International Airport is 11.2 km from Saih Shuaib 2, while Expo City Dubai is 13.8 km away.
Nearby destinations
Last Exit Mad X is 8.8 km from Samana Hills South 3. Emaar South Golf Club is 11.2 km away. Emaar South is 11.1 km from the project location. That community includes more than 15,000 homes across villas, tiered townhomes, town houses and apartments. Within the wider Saih Shuaib 2 area, Al Maktoum International Airport is 11.2 km away and Expo City Dubai is 13.8 km away. These destinations place Samana Hills South 3 within southern Dubai, in the Dubai South masterplan and Dubai Industrial City area.
Road and transport context
From Saih Shuaib 2, Dubai Marina is 24.8 km away and JBR Beach is 24.3 km away. Palm Jumeirah is 28.1 km from the community, while Mall of the Emirates is 31.1 km away. Burj Khalifa and Downtown Dubai are 42.4 km away, and The Dubai Mall is 42.8 km away. Dubai International Airport is 52.8 km from Saih Shuaib 2. The nearest Metro station is Red Line station R42, located 12.3 km from the centre of the subcommunity. Al Maktoum International Airport is the closer of the two airports at 11.2 km.
Developer
Samana Signature Real Estate Developments is the developer of Samana Hills South 3. The company is developing the project in Saih Shuaib 2 as a 147-unit, one-building scheme. The project commenced on 1 September 2025 and has a scheduled completion date of 31 August 2028. Samana Hills South 3 was unveiled on 29 October 2025. Its active construction status and 4.60% completion ratio were recorded following the inspection of 22 June 2026.


















