Samana Hills South 2 is a residential project by Samana Developers in Saih Shuaib 2, Dubai, with prices from AED 998 889, handover 31.08.2028, construction 5.3% complete per the DLD registry.

Price fromAED 998 889
Construction5.3%

Payment plan 20/46/1

20%46%1%
  • Down payment20%
  • During construction46%
  • On handover1%

Construction progress

5.26%
  • Handover31.08.2028
  • Status date08.06.2026
  • DLD project number4025

Data from the Dubai Land Department project registry (updated 08.08.2026 10:48).

Construction progress 13
8 June 2026 5.26%
Samana Hills South 2, Saih Shuaib 2 construction progress — 8 June 2026, 5.26% complete, photo 1 of 5Samana Hills South 2, Saih Shuaib 2 construction progress — 8 June 2026, 5.26% complete, photo 2 of 5Samana Hills South 2, Saih Shuaib 2 construction progress — 8 June 2026, 5.26% complete, photo 3 of 5Samana Hills South 2, Saih Shuaib 2 construction progress — 8 June 2026, 5.26% complete, photo 4 of 5Samana Hills South 2, Saih Shuaib 2 construction progress — 8 June 2026, 5.26% complete, photo 5 of 5

Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.

Recent transactions

DateTypeSize, m²Price, AED
16.07.2026Studio41.0748 000
11.03.20261 BR53.7864 166
11.03.20261 BR73.61 131 444
06.03.20261 BR73.61 100 071
02.03.2026Studio34.0645 030
26.02.2026Studio34.5637 036
13.02.20262 BR94.91 541 955
03.02.20261 BR53.9933 000
12.01.2026Studio34.0666 000
12.01.2026Studio34.0666 000
12.01.20261 BR63.01 197 000
08.01.20261 BR54.3915 000
06.01.2026Studio34.0666 000
22.12.2025Studio34.0659 999
12.12.2025Studio39.3782 000
11.12.2025Studio46.7856 999
10.12.20251 BR54.3948 999
08.12.20251 BR65.21 071 546
08.12.20251 BR58.51 008 000
04.12.20251 BR54.2932 000

Dubai Land Department transaction registry, updated 2026-08-07. Explore Dubai property transactions →

About the project

Samana Hills South 2 is a 140-unit residential development in Saih Shuaib 2 by Samana Signature Real Estate Developments. The project comprises two G+5+R residential buildings. It is active, with a completion ratio of 5.26% recorded following an inspection on 8 June 2026.

Project configuration

Samana Hills South 2 is planned as two residential buildings in Saih Shuaib 2. Each building is configured as G+5+R, and the development has 140 units in total. The registered total area is 7,210.23. The project is identified under project number 4025. Samana Signature Real Estate Developments is the developer of Samana Hills South 2. The project start date is recorded as 1 September 2025, while its scheduled completion date is 31 August 2028. The development forms part of a location that sits within Dubai Industrial City and the wider Dubai South masterplan.

Construction status and completion date

Samana Hills South 2 has active status. Its completion ratio is 5.26%, based on an inspection dated 8 June 2026. The project information was updated on 12 June 2026. The recorded start date is 1 September 2025 and the recorded completion date is 31 August 2028. The development’s 140 units are distributed across two G+5+R residential buildings. These project details are recorded under the same project reference, 4025, for Samana Hills South 2 in Saih Shuaib 2.

Saih Shuaib 2 setting

Saih Shuaib 2 is a subcommunity within Dubai Industrial City, which is part of Dubai South. The area combines industrial, development and residential uses, including accommodation supporting workforce and operational requirements. Saih Shuaib 2 contains 15 projects with 1,558 units in total. Three projects in the subcommunity are under development and five schemes have been completed. The location is positioned at coordinates 24.872133, 55.053492. Samana Hills South 2 is one of the residential projects located within this Dubai South setting.

Nearby destinations

Last Exit Mad X is 8.8 km from Samana Hills South 2. Emaar South Golf Club is 11.2 km away, and Emaar South is also 11.2 km from the project. Al Maktoum International Airport is 11.2 km from Saih Shuaib 2, while Expo City Dubai is 13.8 km away. The location is within Dubai South, placing the project in the southern part of Dubai alongside Dubai Industrial City. These destinations provide the nearest stated leisure, golf, airport and exhibition references for the project’s location.

Metro access and airport travel

The nearest Dubai Metro station to Saih Shuaib 2 is Red Line station R42, at a distance of 12.3 km from the centre of the subcommunity. Al Maktoum International Airport is 11.2 km away, with a typical driving time of 19 minutes. Dubai International Airport is 52.8 km away, with a typical driving time of 48 minutes. Samana Hills South 2 is located in Saih Shuaib 2, within Dubai Industrial City and Dubai South. The project’s location therefore connects to both of Dubai’s airports through the southern Dubai road network.

Road distances to Dubai destinations

The Dubai Mall is 42.8 km from Saih Shuaib 2, with a typical driving time of 41 minutes. Burj Khalifa and Downtown Dubai are 42.4 km away. Palm Jumeirah is 28.1 km away, with a typical driving time of 33 minutes. Dubai Marina is 24.8 km from the subcommunity, while JBR Beach is 24.3 km away. Mall of the Emirates is 31.1 km away. Typical driving times are 38 minutes to Burj Al Arab and 34 minutes to The Walk at JBR. Travel times vary according to traffic and route choice.

FAQ

Who is the developer of Samana Hills South 2?
Samana Hills South 2 is being developed by Samana Signature Real Estate Developments.
Where is Samana Hills South 2 located?
The project is located in Saih Shuaib 2, a subcommunity within Dubai Industrial City and the Dubai South masterplan.
How many units are in Samana Hills South 2?
Samana Hills South 2 has 140 units across two residential buildings.
What is the building configuration?
The development comprises two G+5+R residential buildings.
What is the completion status of Samana Hills South 2?
The project is active, with a completion ratio of 5.26% recorded on 8 June 2026.
When is Samana Hills South 2 scheduled for completion?
The recorded project completion date is 31 August 2028.
What is near Samana Hills South 2?
Last Exit Mad X is 8.8 km away, while Emaar South Golf Club and Al Maktoum International Airport are each 11.2 km away.
How far is the nearest metro station?
Red Line station R42 is the nearest Dubai Metro station, located 12.3 km from the centre of Saih Shuaib 2.