Developer: Dugasta Properties Development · Saih Shuaib 2

Al Haseen Residence 5

Al Haseen Residence 5 is a residential project by Dugasta Properties in Saih Shuaib 2, Dubai, with handover Q2 2027, construction 4.2% complete per the DLD registry, 245 units.

HandoverQ2 2027Developer supplied
Construction4.2%DLD registry · checked 25 Jun 2026
Units245DLD registry

Every figure carries its origin: “DLD registry” is taken from the Dubai Land Department register, “Developer supplied” is stated by the developer, “Our calculation” is computed by us from the first two. Developer prices change without notice — confirm before you commit. Methodology

Handover date & construction progress

4.22%
  • HandoverQ2 2027
  • Status date25.06.2026
  • DLD project number4461

Data from the Dubai Land Department project registry (updated 23.09.2026 09:55).

Construction progress 5
25 June 2026 4.22%
Al Haseen Residence 5, Saih Shuaib 2 construction progress — 25 June 2026, 4.22% complete, photo 1 of 5Al Haseen Residence 5, Saih Shuaib 2 construction progress — 25 June 2026, 4.22% complete, photo 2 of 5Al Haseen Residence 5, Saih Shuaib 2 construction progress — 25 June 2026, 4.22% complete, photo 3 of 5Al Haseen Residence 5, Saih Shuaib 2 construction progress — 25 June 2026, 4.22% complete, photo 4 of 5Al Haseen Residence 5, Saih Shuaib 2 construction progress — 25 June 2026, 4.22% complete, photo 5 of 5

Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.

Al Haseen Residence 5

About the project

Al Haseen Residence 5 is an active residential project by Dugasta Properties Development in Saih Shuaib 2, within Dubai Industrial City and the Dubai South masterplan. The development comprises 245 units across a total area of 11,704.54. Construction started on 3 December 2025, and the project had reached 4.22% completion at its inspection on 25 June 2026.

The project at a glance

Al Haseen Residence 5 is identified under project number 4461 and is located in Saih Shuaib 2. The project has 245 units and a recorded total area of 11,704.54. Its status is active, with construction having commenced on 3 December 2025. The scheduled completion date is 3 June 2027. The latest inspection recorded a completion ratio of 4.22% on 25 June 2026. These project details position Al Haseen Residence 5 within the ongoing development activity of Dubai Industrial City, an area within the wider Dubai South masterplan.

Saih Shuaib 2 and Dubai Industrial City

Saih Shuaib 2 is a subcommunity within Dubai Industrial City, which forms part of Dubai South. The area combines industrial, development and residential uses, including accommodation supporting workforce and operational needs. Saih Shuaib 2 contains 15 projects with a combined 1,558 units. Three projects in the area are under development and five are completed. The community is located at coordinates 24.872133, 55.053492. Its setting places Al Haseen Residence 5 within an established industrial and logistics-oriented district in southern Dubai rather than in a central or coastal residential area.

Access to airports and key destinations

Al Maktoum International Airport is 11.2 km from Saih Shuaib 2, with a typical driving time of 19 minutes. Expo City Dubai is 13.8 km from the area. Dubai Marina is 24.8 km away, JBR Beach is 24.3 km away and Palm Jumeirah is 28.1 km away. Mall of the Emirates is 31.1 km from Saih Shuaib 2, while Burj Khalifa and Downtown Dubai are 42.4 km away. The Dubai Mall is 42.8 km away. Dubai International Airport is 52.8 km from the community, with a typical driving time of 48 minutes.

Metro and road travel

The nearest metro connection to Saih Shuaib 2 is Red Line station R42, located 12.3 km from the centre of the subcommunity. The station is not within walking distance. Typical driving times from Saih Shuaib 2 include 41 minutes to The Dubai Mall, 33 minutes to Palm Jumeirah, 38 minutes to Burj Al Arab and 34 minutes to The Walk at JBR. Road travel times vary according to traffic conditions and route choice. The location is linked most directly to southern Dubai’s airport, industrial, logistics and exhibition infrastructure.

Construction progress and completion

Construction for Al Haseen Residence 5 began on 3 December 2025. The project was 4.22% complete at the inspection dated 25 June 2026. Its scheduled completion date is 3 June 2027. The project is currently active. Buyers considering an off-plan purchase can use the recorded construction start date, inspection progress and scheduled completion date as the current project timeline. Al Haseen Residence 5 forms part of the development pipeline in Saih Shuaib 2, where three projects are under development.

Dugasta Properties Development

Dugasta Properties Development is the developer of Al Haseen Residence 5. The company was founded in 2016. It is responsible for a project of 245 units in Saih Shuaib 2, within Dubai Industrial City and the Dubai South masterplan. The project’s recorded completion date is 3 June 2027, following a construction start date of 3 December 2025. The latest recorded inspection for Al Haseen Residence 5 was conducted on 25 June 2026.

Frequent questions

Who is the developer of Al Haseen Residence 5?
Al Haseen Residence 5 is developed by Dugasta Properties Development. The company was founded in 2016.
Where is Al Haseen Residence 5 located?
The project is in Saih Shuaib 2, a subcommunity within Dubai Industrial City in the Dubai South masterplan.
How many units are in Al Haseen Residence 5?
Al Haseen Residence 5 comprises 245 units. Its recorded total area is 11,704.54.
When is Al Haseen Residence 5 due for completion?
The scheduled completion date is 3 June 2027. Construction began on 3 December 2025.
What is the construction status of Al Haseen Residence 5?
The project is active. It was 4.22% complete at the inspection conducted on 25 June 2026.
How far is Al Haseen Residence 5 from Al Maktoum International Airport?
Al Maktoum International Airport is 11.2 km from Saih Shuaib 2. The typical driving time is 19 minutes.
Is there a metro station near Al Haseen Residence 5?
Red Line station R42 is the nearest metro station, 12.3 km from the centre of Saih Shuaib 2. It is not within walking distance.
What is near Al Haseen Residence 5?
Expo City Dubai is 13.8 km from Saih Shuaib 2. Dubai Marina is 24.8 km away, while JBR Beach is 24.3 km away.
How can I buy an apartment in Al Haseen Residence 5?
Submit an enquiry via the form on this page or message us on WhatsApp — a Continental Club Property broker (RERA 31933) will help you choose a unit and send the brochure and payment plan.

Nearby projects

Get the presentation and prices

We will send floor plans, the payment plan and available units for this project.

By submitting the form you agree to the processing of your contact details.

Project data comes from the Dubai Land Department (DLD) registry.

For AI agents and researchers

Machine-readable mirrors of this page: Markdown · JSON. They carry the same figures as this page, each with its origin labelled.

How to cite:Al Haseen Residence 5 — Continental Club Property, from Dubai Land Department registry and developer data, 2026-08-06, https://continentalclub.ae/project/al-haseen-residence-5-saih-shuaib-2/