Developer: Emaar Properties · Dubai Creek Harbour

Aeon Towers

Aeon Towers is a residential project by Emaar Properties in Dubai Creek Harbour, Dubai, with prices from AED 1 710 000, handover Q2 2028, construction 95.7% complete per the DLD registry, 262 apartments, 260 sold to first buyers per the DLD register (as of 23 Nov 2026).

Price fromAED 1 710 000Developer supplied
Unit types1–3 BR762–1 771 ft²DLD registry
HandoverQ2 2028Developer supplied
Construction95.7%DLD registry · checked 16.11.2026

· DLD data as of 23 Nov

fewer than 10 of 262 apartments still available · DLD, 23 Nov
★ 5.0 on Google · 7 reviews

Layouts and sizes

TypeUnitsTypical size, sq.ft
1 Bedroom102762–816
2 Bedroom1351 233–1 339
3 Bedroom251 665–1 771

Size range excludes the smallest and largest 5% of units of each type.

All units are freehold. Data from the DLD registry.

Balcony or terrace per the DLD registry: almost every residential unit (100%). Typical size: 1 Bedroom — ~65 sq.ft (6.0 m²); 2 Bedroom — ~128 sq.ft (12 m²); 3 Bedroom — ~136 sq.ft (13 m²). Median of registered units; for villas and townhouses the registry includes terraces and open areas.

Unit availability · DLD data as of 23 Nov 2026

fewer than 10 of 262 apartments availableestimate

Sold to first buyers 260 (99%)Available fewer than 10

TypeTotalSoldAvailable
1 bedroom1021020
2 bedrooms1351332
3 bedrooms25250
Total2622602
By building (2)
BuildingApartmentsSoldAvailable
Aeon Tower 11651650
Aeon Tower 297952
Whole project2622602

Sales data comes from the official Dubai Land Department (DLD) register. Please confirm actual availability with our sales team — leave a request.

Tap an apartment type in the table to add it to your request.

By submitting the form you agree to the processing of your contact details, including for advertising analytics.

“Available” means units without a registered sale; resales are excluded; this is an estimate.

Units left in every Dubai off-plan project →

Payment plan 90/10 90% before handover · 10% on handover

The purchase price is split into these stages.

110%Down payment
280%During construction
310%On handover

The exact schedule is confirmed in the sale agreement for the selected unit.

Compare with similar projects

A broker will compare this project with 3 similar ones: prices, handover dates and payment plans.

Compare in WhatsApp

Handover date & construction progress

95.73%
  • StatusActive
  • Construction started09.05.2024
  • HandoverQ2 2028
  • Status date16.11.2026
  • Progress between DLD inspections+5.69% (14.09.2026 → 16.11.2026)
  • Escrow bankEmirates NBD
  • Scale2 bldg
  • DLD project number2882

Data from the Dubai Land Department project registry (updated 24.11.2026 05:55).

Inspection history 10
025507510014.12.202316.11.2026
Actual, per inspections

Pace: 4.32% per month. At this rate 100% falls on 16.12.2026.

The pace is calculated from the past year of inspections. It is an estimate, not a developer commitment. For reference: across 1,175 completed projects the median pace is 2.48% per month and the median build takes 40 months.

Construction progress 120
14.09.2026 90.04%
Aeon Towers, Dubai Creek Harbour construction progress — 14 September 2026, 90.04% complete, photo 1 of 12Aeon Towers, Dubai Creek Harbour construction progress — 14 September 2026, 90.04% complete, photo 2 of 12Aeon Towers, Dubai Creek Harbour construction progress — 14 September 2026, 90.04% complete, photo 3 of 12Aeon Towers, Dubai Creek Harbour construction progress — 14 September 2026, 90.04% complete, photo 4 of 12Aeon Towers, Dubai Creek Harbour construction progress — 14 September 2026, 90.04% complete, photo 5 of 12Aeon Towers, Dubai Creek Harbour construction progress — 14 September 2026, 90.04% complete, photo 6 of 12Aeon Towers, Dubai Creek Harbour construction progress — 14 September 2026, 90.04% complete, photo 7 of 12Aeon Towers, Dubai Creek Harbour construction progress — 14 September 2026, 90.04% complete, photo 8 of 12Aeon Towers, Dubai Creek Harbour construction progress — 14 September 2026, 90.04% complete, photo 9 of 12Aeon Towers, Dubai Creek Harbour construction progress — 14 September 2026, 90.04% complete, photo 10 of 12Aeon Towers, Dubai Creek Harbour construction progress — 14 September 2026, 90.04% complete, photo 11 of 12Aeon Towers, Dubai Creek Harbour construction progress — 14 September 2026, 90.04% complete, photo 12 of 12
24.06.2026 77.91%
Aeon Towers, Dubai Creek Harbour construction progress — 24 June 2026, 77.91% complete, photo 1 of 14Aeon Towers, Dubai Creek Harbour construction progress — 24 June 2026, 77.91% complete, photo 2 of 14Aeon Towers, Dubai Creek Harbour construction progress — 24 June 2026, 77.91% complete, photo 3 of 14Aeon Towers, Dubai Creek Harbour construction progress — 24 June 2026, 77.91% complete, photo 4 of 14Aeon Towers, Dubai Creek Harbour construction progress — 24 June 2026, 77.91% complete, photo 5 of 14Aeon Towers, Dubai Creek Harbour construction progress — 24 June 2026, 77.91% complete, photo 6 of 14Aeon Towers, Dubai Creek Harbour construction progress — 24 June 2026, 77.91% complete, photo 7 of 14Aeon Towers, Dubai Creek Harbour construction progress — 24 June 2026, 77.91% complete, photo 8 of 14Aeon Towers, Dubai Creek Harbour construction progress — 24 June 2026, 77.91% complete, photo 9 of 14Aeon Towers, Dubai Creek Harbour construction progress — 24 June 2026, 77.91% complete, photo 10 of 14Aeon Towers, Dubai Creek Harbour construction progress — 24 June 2026, 77.91% complete, photo 11 of 14Aeon Towers, Dubai Creek Harbour construction progress — 24 June 2026, 77.91% complete, photo 12 of 14Aeon Towers, Dubai Creek Harbour construction progress — 24 June 2026, 77.91% complete, photo 13 of 14Aeon Towers, Dubai Creek Harbour construction progress — 24 June 2026, 77.91% complete, photo 14 of 14
23.03.2026 63.55%
Aeon Towers, Dubai Creek Harbour construction progress — 23 March 2026, 63.55% complete, photo 1 of 10Aeon Towers, Dubai Creek Harbour construction progress — 23 March 2026, 63.55% complete, photo 2 of 10Aeon Towers, Dubai Creek Harbour construction progress — 23 March 2026, 63.55% complete, photo 3 of 10Aeon Towers, Dubai Creek Harbour construction progress — 23 March 2026, 63.55% complete, photo 4 of 10Aeon Towers, Dubai Creek Harbour construction progress — 23 March 2026, 63.55% complete, photo 5 of 10Aeon Towers, Dubai Creek Harbour construction progress — 23 March 2026, 63.55% complete, photo 6 of 10Aeon Towers, Dubai Creek Harbour construction progress — 23 March 2026, 63.55% complete, photo 7 of 10Aeon Towers, Dubai Creek Harbour construction progress — 23 March 2026, 63.55% complete, photo 8 of 10Aeon Towers, Dubai Creek Harbour construction progress — 23 March 2026, 63.55% complete, photo 9 of 10Aeon Towers, Dubai Creek Harbour construction progress — 23 March 2026, 63.55% complete, photo 10 of 10

84 more photos in the DLD register

Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.

Registered transactions in Aeon Towers

Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.

275DLD registrations incl. resales, since 2024
24 203AED per m², median
0%resale, the rest bought from the developer

What buyers actually paid

TypeSize, m²Price, AEDPer m²Deals
1 bedroom711 766 88824 886108
2 bedrooms1212 837 97023 454141
3 bedrooms1573 741 88823 83426

Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.

Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.

Recent transactions

DateTypeSize, m²Price, AED
03.11.20262 BR124.02 755 888
19.10.20261 BR70.91 752 888
06.10.20262 BR153.73 055 888
14.08.20263 BR164.14 097 888
07.08.20261 BR70.91 739 888
07.08.20262 BR123.83 220 888
16.07.20261 BR70.91 752 888
08.07.20262 BR115.32 796 888
26.03.20261 BR70.91 752 888
24.12.20252 BR119.83 202 888
12.11.20252 BR123.82 758 888
01.08.20251 BR70.92 100 000
14.01.20252 BR114.63 070 000
22.11.20242 BR114.62 858 888
07.11.20241 BR75.81 500 000
10.10.20242 BR114.82 000 000
10.10.20242 BR114.82 000 000
12.08.20242 BR114.62 723 888
18.07.20242 BR114.62 914 888
01.07.20242 BR153.73 055 888
11.06.20242 BR114.82 829 888
22.05.20242 BR124.02 771 888
22.05.20242 BR120.52 854 888
22.05.20242 BR115.32 828 888
22.05.20241 BR75.71 842 888
17.05.20242 BR123.82 911 888
16.05.20241 BR75.72 025 888
03.05.20242 BR124.52 972 888
23.04.20241 BR75.71 914 888
22.04.20242 BR123.82 966 888
22.04.20243 BR164.13 786 888
11.04.20242 BR124.02 731 888
03.04.20242 BR123.82 974 888
03.04.20242 BR123.82 785 888
25.03.20242 BR115.62 842 888
21.03.20242 BR120.52 815 888
20.03.20242 BR120.52 843 888
20.03.20242 BR123.82 883 888
18.03.20241 BR75.71 946 888
18.03.20242 BR123.82 867 888
18.03.20242 BR123.82 900 888
18.03.20242 BR114.62 718 888
18.03.20242 BR123.82 964 888
18.03.20241 BR75.81 948 888
18.03.20241 BR75.71 945 888
18.03.20241 BR70.91 725 888
15.03.20241 BR92.01 919 888
13.03.20243 BR155.43 710 888
13.03.20242 BR123.82 758 888
12.03.20241 BR70.91 749 888

Dubai Land Department transaction registry, updated 24.11.2026. Explore Dubai property transactions →

Mortgage for this project

For UAE residents the down payment starts at 20% with terms up to 25 years. Indicative monthly payment for prices from 1 710 000 AED is 7 221 AED.

Calculate mortgage

Estimates only; not a bank approval.

Amenities

  • Waterfront promenade
  • Urban beach
  • Skate park
  • Sports courts
  • Fitness and jogging track
  • Cycling track
  • Metro station
  • Play areas
  • RTA ferry terminal
  • Gymnasium
  • Pet-friendly community
  • Lounges
  • Game rooms
  • Central park
  • Marina
  • Yacht club
  • Licensed bars and restaurants
  • Retail outlets
  • Art installations
  • Food trucks
  • Viewing deck
  • Playground
  • Fitness centres
  • Sculpture parks
  • Multi-use sports courts
  • Open lawns
  • Amphitheatre
  • Paddle tennis court
  • Bocce court
  • Inflatable trampoline
  • Adventure play area
  • Skating areas
  • Kids' play area
  • Dog park
  • Splash pad
  • Fitness plaza
  • Electric vehicle charging ports
  • Bicycle parking

What is nearby

  • Burj Khalifa19 мин
  • Downtown Dubai15 мин
  • Dubai International Airport10 мин
  • Jumeirah Beach22 мин
  • Ras Al Khor Wildlife Sanctuary7 мин

Places nearby

Aeon Towers

Your broker for this project

Elena Orlova

Elena Orlova

Senior Broker · Continental Club Property · RERA ORN 31933

Answers questions about Aeon Towers: current availability, payment plan, DLD registration. English and Russian.

Get the presentation and prices

We will send floor plans, the payment plan and available units for this project.

By submitting the form you agree to the processing of your contact details, including for advertising analytics.

Project data comes from the Dubai Land Department (DLD) registry.

Every figure carries its origin: “DLD registry” is taken from the Dubai Land Department register, “Developer supplied” is stated by the developer, “Our calculation” is computed by us from the first two. Developer prices change without notice — confirm before you commit. Methodology

About the project

Aeon Towers is a two-tower residential project by Emaar Properties in Dubai Creek Harbour, at the crossroads of Al Jaddaf and Festival City. The development comprises 262 apartments and is active, with construction recorded at 95.73% completion on 16 November 2026. Handover is scheduled for Q2 2028.

Two residential towers at Dubai Creek Harbour

Aeon Towers comprises two residential buildings. Tower 1 is configured as ground floor, podium, 20 floors and roof, while Tower 2 comprises ground floor, podium, 11 floors and roof. The buildings are designed with a concrete structure, blockwork, and internal and external finishes. Aeon is positioned beside Dubai Creek, with views described across Dubai Creek Canal, parks and Dubai’s skyscrapers. The project sits adjacent to the central plaza within Dubai Creek Harbour. Its setting combines the waterfront with park areas, the marina and the district’s urban facilities.

One-, two- and three-bedroom residences

The residential collection includes one-bedroom units, two-bedroom suites and three-bedroom suites. Aeon Towers contains 262 apartments across its two buildings. The residences are set within Dubai Creek Harbour and are presented with views towards the canal, parks and Dubai’s skyline. The project’s stated starting price is AED 1,710,000. This establishes the entry price for Aeon Towers while the available collection spans three bedroom categories.

Waterfront, beach and recreation facilities

Aeon’s facilities include a waterfront promenade, urban beach, central park, marina and yacht club. Outdoor activity spaces include a skate park, sports courts, a fitness and jogging track, cycling track, paddle tennis court, bocce court, open lawns and an amphitheatre. There are play areas, a playground, an adventure play area, kids’ play area, inflatable trampoline and splash pad. The development also includes a gymnasium, fitness centres, fitness plaza, lounges and game rooms. Practical mobility and community features include a metro station, RTA ferry terminal, electric-vehicle charging ports, bicycle parking, retail outlets, food trucks, licensed bars and restaurants, a dog park and a pet-friendly community.

Dubai Creek Harbour setting

Dubai Creek Harbour is located along the historic Dubai Creek and has 7.4 million square metres of residential space and 500,000 square metres of parks and open spaces. The district includes retail, business, recreation and community facilities. Aeon is situated at the crossroads of Al Jaddaf and Festival City, close to Creek Marina and the central plaza. A 700-metre beach forms part of the surrounding waterfront offering. Creek Island Central Park is 0.6 km from Aeon Towers, and Creekside Park Dubai Creek Harbour is 0.7 km away. Ras Al Khor Wildlife Sanctuary is 3.2 km away, while the Creek Marina Yacht Club is listed at a five-minute journey.

Connections from the Creek waterfront

Aeon’s setting includes metro connectivity and an RTA ferry terminal, with a water taxi connection to Downtown Dubai. The surrounding district is planned with road networks, shaded walkways and limited roads. Dubai Creek Harbour is described as pedestrian-friendly, with parks, open spaces and community facilities within walking distance across the district. Burj Khalifa is listed at 10 minutes from the project, while Dubai International Airport is listed at 15 minutes. Imagine at Dubai Festival City is 1.7 km away, Jameel Arts Centre is 2.8 km away, and Al Badia Golf Club is 1.5 km away.

Payment plan and construction progress

Aeon Towers has a 90/10 payment plan. A 10% down payment is due on booking, 80% is payable during construction across the first to eighth instalments, and the final 10% is due on handover at 100% completion. Handover is scheduled for Q2 2028. Construction began on 9 May 2024. The project is active, and its completion ratio was 95.73% at the inspection dated 16 November 2026. The recorded project area is 27,701.49 square metres.

Emaar Properties

Emaar Properties is the developer of Aeon Towers. Founded in 1997, Emaar Properties is responsible for the project within Dubai Creek Harbour. Aeon forms part of the developer’s residential offering in this waterfront district, alongside its network of promenades, parks, marina facilities, retail, dining, recreation and transport features. The project brings together 262 apartments in two buildings with access to the district’s waterfront and urban amenities.

Service charge: what to expect

The building is still under construction, so it has no RERA-approved budget yet — that comes after handover. The figures below are what already-completed buildings in the area pay.

Area median21.07 AEDper sq ft per year · 227 AED/m²
Range in the area16.25 – 35.48AED per sq ft · 19 buildings
A 1,000 sq ft unit≈ 21,070 AEDper year at the median · ≈ $5,737
vs Dubai median▲ +31.5%Dubai 16.02 AED/sq ft

Check the charge for a specific building →

Median across 19 completed buildings in Dubai Creek Harbour for 2026, from the DLD service charge index (Mollak). This is an area benchmark, not this project’s rate: RERA approves that after handover and it may land either side of the median.

Frequent questions

Who is the developer of Aeon Towers?
Aeon Towers is developed by Emaar Properties, founded in 1997.
Where is Aeon Towers located?
Aeon Towers is in Dubai Creek Harbour, at the crossroads of Al Jaddaf and Festival City.
What is the starting price at Aeon Towers?
The stated starting price is AED 1,710,000.
What types of homes are available at Aeon Towers?
The project offers one-bedroom units, two-bedroom suites and three-bedroom suites.
How many units are in Aeon Towers?
Aeon Towers comprises 262 apartments across two residential buildings.
When is the Aeon Towers handover date?
Aeon Towers handover (completion) is scheduled for Q2 2028 (developer data). Construction progress was 95.73% at the DLD inspection of 16 November 2026. The date and progress on this page are updated from the DLD register. For current availability, prices and resale (assignment) options, send an enquiry on this page.
What is the Aeon Towers payment plan?
The payment plan is 90/10: 10% on booking, 80% during construction and 10% on handover.
What is the construction status of Aeon Towers?
Aeon Towers is active and was 95.73% complete at the inspection dated 16 November 2026.
What is near Aeon Towers?
Creek Island Central Park is 0.6 km away, Creekside Park Dubai Creek Harbour is 0.7 km away, and Creek Marina Yacht Club is listed at five minutes.
How many apartments are left in Aeon Towers?
According to the Dubai Land Department (DLD) register, as of 23 Nov 2026 fewer than 10 of 262 apartments in Aeon Towers have no registered sale; 260 have been sold to first buyers (99%). This is an estimate. This is registry data, not a developer availability list: please confirm current availability and prices with our sales team — leave a request on this page.
How can I buy an apartment in Aeon Towers?
Submit an enquiry via the form on this page or message us on WhatsApp — a Continental Club Property broker (RERA 31933) will help you choose a unit and send the brochure and payment plan.

Estimate a unit in this building from DLD sales

Based on 50 registered DLD sales in Aeon Towers between 12 Mar 2024 and 3 Nov 2026: median 23 957 AED/m² (2 226 AED/sq ft); half of the deals fell between 23 099 and 24 716 AED/m². This is transaction statistics, not a valuation of a specific unit: floor, view, finish and condition move the price.

TypeIndicative priceDealsMedian AED/m²Median area, m²
1 BRAED 1 871 0001524 71675.7
2 BRAED 2 927 0003223 644123.8
3 BRAED 3 919 000323 883164.1
Get an exact valuation

Source: Dubai Land Department open data, the latest up to 50 sales in the building; areas as registered; refreshed daily. Deals outside 3,000–200,000 AED/m² are excluded.

PDF shortlist · updated 1 November 2026

Dubai Creek Harbour: new projects and prices

25 projects · prices from DLD and developers

  1. Lotus Lotus Dubai Creek Harbour from AED 660,000
  2. Altus Altus Dubai Creek Harbour · 1–3 BR from AED 1,592,000
  3. Arlo Tower Arlo Tower Dubai Creek Harbour · 1–3 BR from AED 1,600,000

22 more in the PDF: prices, handover dates, payment plans

The PDF opens instantly. Refreshed monthly from DLD data.

How much is your property in Aeon Towers worth?

260 of 262 apartments have been sold to first buyers per the DLD register. DLD registrations, including resales: 275 (since 2024). We compare your unit with sales of the same layout here, not with asking prices. Free, reply within 24 hours.

By submitting the form you agree to the processing of your contact details, including for advertising analytics.

More projects by Emaar Properties

All 346 projects by Emaar Properties →

Nearby projects

For AI agents and researchers

Machine-readable mirrors of this page: Markdown · JSON. They carry the same figures as this page, each with its origin labelled.

How to cite:Aeon Towers — Continental Club Property, from Dubai Land Department registry and developer data, 2026-11-04, https://continentalclub.ae/project/aeon-towers-dubai-creek-harbour/

Where should we send the shortlist?

The PDF downloads right after you submit. A manager gets in touch only if you ask.