Dubai Digital Park

About the area

Dubai Digital Park (DDP) is a purpose‑built smart city and integrated free zone within Dubai Silicon Oasis. Launched as a technology park, it was completed in the fourth quarter of 2019 and occupied from 2020. The development combines office, retail, residential and hospitality components on a site designed around smart infrastructure and low‑emission mobility.

What it is and where it is located

Dubai Digital Park occupies about 15 hectares (150,000 sq m) inside Dubai Silicon Oasis. It was conceived as the UAE’s first integrated free zone technology park and built to align with Dubai’s strategic smart‑city objectives across life, society, mobility, economy, governance and environment. The project was originally marketed under the name Silicon Park.

Key built elements include approximately 47,000 sq m of office space, about 17,000 sq m of retail, and 235 smart residential apartments. Eight office buildings provide flexible accommodation, with individual building floor areas in the range stated by the developer. The scheme also incorporates a Radisson Red hotel component and a convention centre.

Dubai Digital Park

Transport and distances

DDP is located within Dubai Silicon Oasis and is connected to the city by road. The nearest Dubai Metro station on the Green Line is identified as code G30; that station lies about 11,606 metres from the park (not walkable as a practical daily route). Internal circulation within the park emphasizes electric mobility rather than regular private vehicles.

Approximate road distances from Dubai Digital Park to major Dubai locations (as provided):

  • Burj Khalifa / Downtown Dubai — 13.6 km
  • The Dubai Mall — 13.2 km
  • Dubai International Airport (DXB) — 14.9 km
  • Al Maktoum International Airport (DWC) — 33.1 km
  • Palm Jumeirah — 24.1 km
  • Dubai Marina — 24.3 km
  • JBR Beach — 25.1 km
  • Mall of the Emirates — 17.9 km
  • Business Bay — 13.6 km
  • Expo City Dubai — 29.0 km
  • Global Village — 9.0 km
  • Dubai International Financial Centre (DIFC) — 14.1 km

The developer provided estimated driving times to several destinations when the project launched (for orientation): roughly 20 minutes to Dubai Mall, about 29 minutes to Palm Jumeirah and Burj Al Arab, and around 33 minutes to The Walk JBR. Dubai International Airport was cited as roughly a 17‑minute drive and Al Maktoum International Airport about 37 minutes by car, depending on traffic conditions.

Dubai Digital Park

Development, buildings and on‑site components

Construction of Dubai Digital Park was carried out as a mixed‑use masterplan centred on smart infrastructure. The overall cost reported at the project launch was approximately Dh1.3 billion (around $354 million). The completed scheme includes:

  • Office stock: roughly 47,000 sq m across eight buildings configured to provide flexible office units.
  • Retail: approximately 17,000 sq m of retail units positioned to serve office occupants, residents and visitors.
  • Residential: 235 smart apartments designed with remote‑control systems for lighting, air conditioning and window/curtain movement.
  • Hospitality and events: a Radisson Red component with 112 business hotel rooms and 59 fully furnished apartments, and a convention centre with capacity for more than 500 delegates.
  • Parking and mobility: underground parking for over 2,000 cars is part of the masterplan, with dedicated infrastructure for electric vehicles.

Office buildings were described with typical building sizes in the 4,000–6,000 sq m range, intended to support flexible tenancies for technology and service firms. The first occupancies occurred in 2020 following practical completion in late 2019.

Dubai Digital Park

Smart infrastructure and sustainability features

Smart technology is integral to the park’s design. Public‑realm elements and residential units are equipped with intelligent systems: charging docks for personal devices in public areas, smart pop‑up furniture, digital play tables, optimally designed bus shelters and shading for pedestrian squares. Outdoor lighting operates with motion‑sensor controls, and a central control centre collects and analyses sensor data to manage smart services across the site.

Internal mobility within the park relies on electric vehicles rather than conventional private cars. A network of charging stations is provided for residents and visitors, and alternatives such as rechargeable electric bikes are included in the mobility mix.

In environmental terms, the development was designed to comply with the UAE Green Building Regulations and to meet international LEED standards. Measures highlighted at launch include use of green building materials, solar panels and double‑glazed windows to reduce heat gain and improve energy efficiency. The scheme’s technical approach aims to optimise renewable energy use and lower operational energy consumption.

Dubai Digital Park

Amenities and public realm

Planned and delivered amenities reflect a contemporary mixed‑use park model: restaurants and cafés, fitness facilities, running tracks and cycling trails, and a shopping centre sized to meet day‑to‑day needs of the park’s occupants. The convention centre and hotel provide business‑oriented hospitality and event capacity. Significant underground parking supports vehicular access where required while the public realm emphasises pedestrian comfort, shade and smart furniture.

Dubai Digital Park

Who the location suits

Dubai Digital Park is positioned for technology companies, professional services and organisations seeking free‑zone benefits combined with smart infrastructure. The flexible office floors are aimed at firms requiring modern, technology‑enabled workspace. The residential component targets people who work in or around Dubai Silicon Oasis and value connected, smart living environments where building systems and some public services are managed centrally.

With an on‑site hotel and convention facilities, the park also serves visiting business delegations and short‑stay professionals. The internal low‑emission mobility model and digital services are relevant to occupiers prioritising sustainability and operational efficiency.

FAQ

What is Dubai Digital Park?
It is an integrated smart city project and free zone within Dubai Silicon Oasis combining office, retail, residential, hotel and convention facilities on a 15‑hectare site.

When was it completed and occupied?
Construction reached completion in the fourth quarter of 2019 and tenant occupation of the park began in 2020.

What are the main smart and sustainability features?
Features include a central control centre for sensor data, smart street furniture and lighting, apartment remote‑control systems, electric vehicle charging infrastructure, solar panels and design measures aligned with UAE Green Building Regulations and LEED.

How does internal mobility work?
The park’s internal circulation prioritises electric vehicles, with charging points and options such as rechargeable electric bikes available for residents and visitors.

Service charges in Dubai Digital Park, 2026

Area median13.44 AED▲ +3.9% per sq ft per year · 145 AED/m²
Range across buildings9.7–19.4buildings with a budget: 55
vs Dubai median▼ -15.7%Dubai 15.94 AED/sq ft
General / reserve fund12.05 / 1.50medians, AED/sq ft

Largest management companies in the area: Prime Owners Association Management Services (17), Shaheen Owner Association Management Services (6), Stratum Owner Association Management Services (6).

Check any building’s service charge → All communities

RERA-approved 2026 budgets from the DLD service charge index (Mollak); residential buildings. Rate is AED per sq ft per year; YoY compares the same buildings in 2025.

Resale properties — Dubai Digital Park

Found 0
View

Nothing found. Try relaxing the filters.

Nearby areas

Neighbouring areas and sub-communities to compare location and prices.

Frequent questions

Is Dubai Digital Park well-connected by metro?
The nearest metro station is approximately 11.6 km away, on the Green Line.
How can I buy property in Dubai Digital Park?
Submit an enquiry via the form on this page or message us on WhatsApp — a Continental Club Property broker (RERA 31933) will help you find a unit in this area.
Request
Request