by Vincitore Real Estate Development LLC in Arjan
Vincitore Dolce Vita is a residential project by Vincitore Real Estate Development LLC in Arjan, Dubai, with prices from AED 601 000, handover Q3 2026, construction 22% complete per the DLD registry, 715 units.
Layouts and sizes
| Type | Size, sq.ft |
|---|---|
| Studio | 461 |
| 1 Bedroom | 762–815 |
| 2 Bedroom | 1 262 |
Floor plans
Payment plan 60/40 (Monthly)
- Down payment30%
- During construction60%
- On handover10%
Construction progress
- StatusActive
- Construction started2023-06-30
- HandoverQ3 2026
- Status date22.04.2026
- Escrow bankMashreq Bank
- Scale2 bldg
- DLD project number2669
Data from the Dubai Land Department project registry (updated 06.08.2026 09:55).
Recent transactions
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 22.07.2026 | 1 BR | 64.4 | 1 070 160 |
| 19.06.2026 | Studio | 33.9 | 619 360 |
| 15.06.2026 | Studio | 41.0 | 768 000 |
| 26.05.2026 | 1 BR | 72.2 | 1 363 000 |
| 01.05.2026 | 1 BR | 68.5 | 1 256 000 |
| 26.03.2026 | 1 BR | 69.5 | 1 220 100 |
| 23.12.2025 | Studio | 40.1 | 708 540 |
| 22.12.2025 | Studio | 42.8 | 710 000 |
| 15.12.2025 | 1 BR | 74.6 | 1 427 000 |
| 15.12.2025 | Studio | 40.2 | 710 500 |
| 03.12.2025 | 1 BR | 71.9 | 1 300 000 |
| 17.11.2025 | 1 BR | 74.0 | 1 315 000 |
| 17.11.2025 | 1 BR | 66.3 | 997 640 |
| 17.11.2025 | Studio | 40.7 | 685 020 |
| 12.11.2025 | Studio | 40.2 | 672 280 |
| 11.11.2025 | Studio | 40.1 | 688 940 |
| 06.11.2025 | 1 BR | 75.9 | 1 229 900 |
| 28.10.2025 | Studio | 42.8 | 692 860 |
| 27.10.2025 | 1 BR | 71.8 | 1 330 000 |
| 23.10.2025 | Studio | 41.5 | 685 020 |
Dubai Land Department transaction registry, updated 2026-08-06. Explore Dubai property transactions →
Amenities
- Aqua pool
- Wave pool
- Jacuzzi
- Kids pool
- Submerged loungers
- Pool bar
- Tropical oasis pool
What is nearby
- Burj Khalifa15 мин
- Dubai Autodrome5 мин
- Dubai International Airport18 мин
- Dubai Polo & Equestrian Club7 мин
- IMG World of Adventure10 мин
- Mall of the Emirates7 мин
Places nearby
About the project
Vincitore Dolce Vita is a two-building hotel-apartment development in Arjan, comprising 715 units. It is being developed by Vincitore Real Estate Development LLC and is scheduled for handover in Q3 2026. The project is active, with construction recorded at 22.03% completion on 22 April 2026.
The development
Vincitore Dolce Vita is planned as two buildings with a configuration of ground level, three podium levels, 16 floors and a roof level. The project has 715 units and a total area of 46,865.79 square metres. Its stated construction approach includes a concrete structure and blockwork, followed by internal and external finishes. The project began on 30 June 2023. Vincitore Dolce Vita forms part of the Arjan residential setting in Al Barsha South, an area within the wider DubaiLand masterplan. The development is positioned among other Vincitore-branded projects, including Vincitore Boulevard, Vincitore Benessere, Vincitore Volare and Vincitore Palacio.
Residence types
The development includes studios, one-bedroom apartments and two-bedroom apartments. The project is described as hotel apartments, while its residence offering is presented through these studio, one-bedroom and two-bedroom layouts. With 715 units across two buildings, Vincitore Dolce Vita is a substantial residential project within Arjan. The current starting price is AED 601,000. Buyers considering the available residence categories can compare the studio, one-bedroom and two-bedroom options while reviewing the project’s handover timetable and payment-plan structure. The development’s planned handover is Q3 2026, and construction was reported at 22.03% complete on 22 April 2026.
Pool and water amenities
The amenity programme centres on a collection of water features presented as Paradiso. It includes an Aqua pool, a beach-style wave pool, a jacuzzi, a dedicated kids pool, submerged loungers, a pool bar and a tropical oasis pool. The Aqua pool is described as an Italian-inspired pool setting surrounded by greenery. The wave pool introduces a beach-style water feature, while the kids pool provides a separate pool area for children. Submerged loungers are included within the pool environment, alongside the pool bar. The tropical oasis pool is presented as a secluded lagoon-style water amenity. These facilities form the identified amenity offering for Vincitore Dolce Vita.
Arjan setting and nearby places
Vincitore Dolce Vita is located in Arjan, a mixed-use residential and leisure neighbourhood in the Al Barsha South area of Dubai. Arjan sits near the junction of Sheikh Mohammed Bin Zayed Road and Umm Suqeim Road. Arjan East Park is 0.2 km from the project, Dubai Miracle Garden is 0.6 km away, and Dubai Science Park South Park is 0.7 km away. Arjan Community Park is at a distance of 0.9 km. Arabian Ranches Golf Club is 2.5 km away, while Cinepolis at Circle Mall is 3.2 km from the development. Other places identified near the project include Nord Anglia School and Mediclinic Hospital.
Payment plan and handover
Vincitore Dolce Vita has a payment plan presented as 60/40 with monthly payments. The project’s starting price is AED 601,000. Handover is scheduled for Q3 2026. Construction began on 30 June 2023, and the development is currently active. Its recorded completion ratio was 22.03% on 22 April 2026. The project contains 715 units across two buildings, allowing buyers to consider the studio, one-bedroom and two-bedroom residence types within the stated payment-plan format. The handover schedule and current completion level provide the principal timeline details for the development.
The developer
Vincitore Real Estate Development LLC is the developer of Vincitore Dolce Vita. The company’s associated Arjan projects named alongside Dolce Vita include Vincitore Boulevard, Vincitore Benessere, Vincitore Volare and Vincitore Palacio. At Dolce Vita, the development concept includes a two-building hotel-apartment scheme with ground, podium, residential and roof levels. The project is located in Arjan and has 715 units. Construction commenced on 30 June 2023, with the project recorded as active and 22.03% complete on 22 April 2026. The scheduled handover period is Q3 2026.



















