by AME Development in Majan
Tulip Oasis 11 is a residential project by AME Development in Majan, Dubai, with prices from AED 988 000, handover Q2 2026, construction 70.2% complete per the DLD registry, 108 units.
Layouts and sizes
| Type | Units | Size, sq.ft |
|---|---|---|
| 1 Bedroom | 51 | 810–1 888 |
| 2 Bedroom | 48 | 1 159–3 539 |
| NA | 9 | 320–380 |
All units are freehold. Data from the DLD registry.
Floor plans
Construction progress
- StatusActive
- Construction started2024-02-28
- HandoverQ2 2026
- Status date06.07.2026
- Escrow bankEmirates Islamic
- DLD project number3538
Data from the Dubai Land Department project registry (updated 08.08.2026 10:48).
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: AME Development · District: Majan
Recent transactions
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 30.07.2026 | 2 BR | 108.9 | 1 643 000 |
| 27.07.2026 | 2 BR | 112.2 | 1 650 000 |
| 22.07.2026 | 2 BR | 107.7 | 1 530 000 |
| 13.07.2026 | 2 BR | 107.7 | 1 455 000 |
| 13.07.2026 | 2 BR | 113.8 | 1 670 000 |
| 30.06.2026 | 1 BR | 175.4 | 1 110 000 |
| 17.06.2026 | 2 BR | 116.8 | 1 700 000 |
| 25.05.2026 | 1 BR | 133.9 | 1 140 000 |
| 05.05.2026 | 1 BR | 166.2 | 1 210 000 |
| 27.04.2026 | 2 BR | 107.7 | 1 495 000 |
| 23.04.2026 | 2 BR | 141.5 | 1 544 595 |
| 22.04.2026 | 1 BR | 166.2 | 1 110 000 |
| 13.04.2026 | 2 BR | 113.8 | 1 595 000 |
| 06.04.2026 | 2 BR | 157.3 | 1 630 000 |
| 30.03.2026 | 1 BR | 77.3 | 1 085 000 |
| 16.03.2026 | 1 BR | 75.2 | 1 205 000 |
| 06.03.2026 | 1 BR | 75.2 | 1 130 000 |
| 02.03.2026 | 1 BR | 89.1 | 1 180 000 |
| 11.02.2026 | 1 BR | 75.2 | 1 000 000 |
| 10.02.2026 | 1 BR | 75.2 | 1 150 300 |
Dubai Land Department transaction registry, updated 2026-08-07. Explore Dubai property transactions →
Amenities
- Fully equipped gym / yoga area
- Plunge pool
- Swimming pool
- BBQ area
- Kids play area
- EV charging station
- Sauna rooms
- Lobby lounge
About the project
Tulip Oasis 11 is an active residential apartment project by AME Development in Majan, Dubai. The single-building development contains 108 units and is recorded at 70.19% complete, with completion dated 30 June 2026.
The project and building
Tulip Oasis 11 is planned as one building comprising a ground floor, one parking level and 10 further floors. Its recorded construction specification is a concrete structure with blockwork and internal and external finishes. The development began on 28 February 2024 and forms part of Majan in the Wadi Al Safa 3 area of Dubai. The project contains 108 units in total. The residential concept is a collection of one- and two-bedroom apartments, with a focus on open internal living areas and floor-to-ceiling windows. Downtown skyline views are presented as part of the development’s outlook from Majan.
Apartment collection and interiors
The apartment selection at Tulip Oasis 11 consists of one-bedroom and two-bedroom homes. Interiors are described with large open living areas and floor-to-ceiling windows that bring natural light into the apartments. Each home includes a fully fitted kitchen with appliances. The master bedroom specification includes storage and a walk-in closet, alongside a master bathroom. The interior material palette incorporates natural tones, marbling features and selected finishes. These elements form the stated residential specification across the apartment collection.
Amenities and shared facilities
The amenity provision includes a fully equipped gym and yoga area for exercise and wellness activities. Water facilities comprise a swimming pool and a separate plunge pool. Sauna rooms are also included within the project’s amenity offering. For outdoor use, Tulip Oasis 11 provides a BBQ area and a kids’ play area. The building also includes an EV charging station and a lobby lounge. Together, these facilities cover fitness, leisure, family recreation, electric-vehicle charging and arrival spaces within the development.
Majan setting
Tulip Oasis 11 is located in Majan, Dubai, within Wadi Al Safa 3. Majan is a mixed-use community in the DubaiLand master area, with residential, commercial, retail and entertainment uses. The community is accessible primarily by road. From the development, Al Barari is stated at two minutes, while IMG Worlds of Adventure is stated at five minutes and Global Village at eight minutes. Majan Active Park and Majan Family Park are each 0.4 km from the project, while Majan Central Park is 0.8 km away. IMG Worlds of Adventure is listed at 1.1 km and Global Village at 2.9 km.
Connections to Dubai destinations
The stated journey time to Dubai Hills Mall is 15 minutes from Tulip Oasis 11. Dubai Mall is listed at 20 minutes, followed by Mall of the Emirates at 25 minutes. DXB Airport is stated at 28 minutes, and Dubai Marina at 30 minutes. For leisure destinations near Majan, IMG Worlds of Adventure is listed at 1.1 km and Global Village at 2.9 km. Dubai Hills Golf Club is listed at 6.6 km, while Arabian Ranches Golf Club is 6.9 km away. Novo Cinema at IMG Worlds of Adventure is also listed at 1.1 km from the project.
Construction progress and completion
Tulip Oasis 11 has active project status. Construction started on 28 February 2024. The reported completion ratio is 70.19%, based on an inspection dated 6 July 2026. The recorded project completion date is 30 June 2026. The development comprises one building and 108 units. Its building configuration is ground floor, one parking level and 10 floors. Buyers considering the project can therefore assess it as an active development with a recorded completion date and a reported construction progress figure.
AME Development
AME Development is the developer of Tulip Oasis 11. The company was founded in 2024. At Tulip Oasis 11, AME Development is delivering a residential project in Majan with 108 apartments across one building. The project’s apartment collection is limited to one-bedroom and two-bedroom layouts. Its stated facilities include a gym and yoga area, swimming pool, plunge pool, sauna rooms, BBQ area, kids’ play area, EV charging station and lobby lounge. The project is recorded as active, with completion dated 30 June 2026.


























