Developer: ADE Properties · Majan
Barari Gate by ADE is a residential project by ADE Properties in Majan, Dubai, with prices from AED 670 000, handover Q4 2028, construction 1.7% complete per the DLD registry, 274 apartments (+8 non-residential units), 142 sold to first buyers per the DLD register (as of 23 Nov 2026).
· DLD data as of 23 Nov
| Type | Size, sq.ft | From, AED |
|---|---|---|
| Studio | 438–536 | 670 000 |
| 1-BEDROOM | 775–900 | 1 188 000 |
| 2-BEDROOM + MAID | 1 560–1 900 | 1 700 000 |
| 2-BEDROOM + MAID + POOL | ||
| 3-BEDROOM + MAID + POOL | 2 527–3 840 | 2 650 000 |
Balcony or terrace per the DLD registry: almost every residential unit (100%). Typical balcony size: Studio — ~79 sq.ft (7.3 m²); 1 Bedroom — ~160 sq.ft (15 m²); 2 Bedroom — ~533 sq.ft (50 m²); 3 Bedroom — ~789 sq.ft (73 m²). Median of registered units; for villas and townhouses the registry includes terraces and open areas.
≈130 of 274 apartments availableestimate
Sold to first buyers 142 (52%)Available ≈130
| Type | Total | Sold | Available |
|---|---|---|---|
| Studios | 160 | 98 | 62 |
| 1 bedroom | 64 | 25 | 39 |
| 2 bedrooms | 40 | 14 | 26 |
| 3 bedrooms | 10 | 5 | 5 |
| Total | 274 | 142 | 132 |
Sales data comes from the official Dubai Land Department (DLD) register. Please confirm actual availability with our sales team — leave a request.
Tap an apartment type in the table to add it to your request.
“Available” means units without a registered sale; resales are excluded; this is an estimate. Non-residential units (8) are not included.
The purchase price is split into these stages.
The exact schedule is confirmed in the sale agreement for the selected unit.
A broker will compare this project with 3 similar ones: prices, handover dates and payment plans.
All Dubai projects handing over in 2028 →
Data from the Dubai Land Department project registry (updated 25.11.2026 05:55).
Pace: 0.15% per month. At this rate we do not project a completion date: it falls more than 10 years out.
The pace is calculated from the past year of inspections. It is an estimate, not a developer commitment. For reference: across 1,175 completed projects the median pace is 2.48% per month and the median build takes 40 months.
6 more photos in the DLD register
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: ADE Properties · District: Majan
Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.
| Type | Size, m² | Price, AED | Per m² | Deals |
|---|---|---|---|---|
| Studio | 41 | 725 000 | 17 683 | 98 |
| 1 bedroom | 76 | 1 226 500 | 16 138 | 25 |
| 2 bedrooms | 156 | 1 850 000 | 11 859 | 14 |
| 3 bedrooms | 235 | 2 780 000 | 11 830 | 5 |
Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.
Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 09.11.2026 | Studio | 41.7 | 726 000 |
| 02.11.2026 | Studio | 41.1 | 728 000 |
| 21.10.2026 | Studio | 42.2 | 728 000 |
| 09.10.2026 | Studio | 41.1 | 723 000 |
| 29.09.2026 | Studio | 37.9 | 710 000 |
| 07.09.2026 | 3 BR | 256.9 | 2 900 000 |
| 18.08.2026 | Studio | 41.7 | 732 000 |
| 12.08.2026 | Studio | 41.1 | 726 000 |
| 10.08.2026 | Studio | 41.1 | 726 000 |
| 30.07.2026 | 2 BR | 163.6 | 2 200 000 |
| 27.07.2026 | 3 BR | 234.8 | 2 710 000 |
| 27.07.2026 | 3 BR | 234.8 | 2 680 000 |
| 24.07.2026 | Studio | 41.1 | 726 000 |
| 20.07.2026 | Studio | 45.2 | 715 000 |
| 20.07.2026 | 1 BR | 80.5 | 1 238 600 |
| 07.07.2026 | Studio | 45.1 | 715 000 |
| 06.07.2026 | 1 BR | 76.0 | 1 205 600 |
| 02.07.2026 | Studio | 45.1 | 715 000 |
| 22.06.2026 | Studio | 49.8 | 740 000 |
| 22.06.2026 | Studio | 41.0 | 737 000 |
| 19.06.2026 | Studio | 40.9 | 725 000 |
| 15.06.2026 | Studio | 41.1 | 736 000 |
| 10.06.2026 | Studio | 41.1 | 728 000 |
| 05.06.2026 | Studio | 41.7 | 720 000 |
| 03.06.2026 | Studio | 41.2 | 728 000 |
| 03.06.2026 | Studio | 41.4 | 728 000 |
| 06.05.2026 | 1 BR | 72.1 | 1 226 500 |
| 05.05.2026 | Studio | 41.1 | 723 000 |
| 01.05.2026 | 66.0 | 1 988 266 | |
| 30.04.2026 | Studio | 41.0 | 733 000 |
| 30.04.2026 | Studio | 40.7 | 670 000 |
| 28.04.2026 | 2 BR | 148.9 | 1 710 000 |
| 27.04.2026 | 2 BR | 163.7 | 1 950 000 |
| 27.04.2026 | 42.6 | 1 285 125 | |
| 27.04.2026 | Studio | 42.8 | 723 000 |
| 27.04.2026 | Studio | 41.0 | 711 000 |
| 21.04.2026 | 2 BR | 165.7 | 1 900 000 |
| 21.04.2026 | Studio | 41.3 | 710 000 |
| 20.04.2026 | 1 BR | 76.0 | 1 212 200 |
| 20.04.2026 | Studio | 41.1 | 723 000 |
| 20.04.2026 | 66.2 | 1 995 198 | |
| 20.04.2026 | Studio | 42.2 | 721 000 |
| 20.04.2026 | Studio | 40.7 | 722 000 |
| 20.04.2026 | Studio | 40.7 | 710 000 |
| 20.04.2026 | Studio | 40.7 | 714 000 |
| 20.04.2026 | 2 BR | 175.3 | 1 930 000 |
| 20.04.2026 | 1 BR | 76.0 | 1 240 800 |
| 17.04.2026 | Studio | 42.2 | 718 000 |
| 15.04.2026 | 2 BR | 161.6 | 1 900 000 |
| 15.04.2026 | Studio | 42.8 | 720 000 |
Dubai Land Department transaction registry, updated 24.11.2026. Explore Dubai property transactions →
For UAE residents the down payment starts at 20% with terms up to 25 years. Indicative monthly payment for prices from 670 000 AED is 2 829 AED.
Estimates only; not a bank approval.


Tetiana Karpenko
Senior Broker · Continental Club Property · RERA ORN 31933
Answers questions about Barari Gate by ADE: current availability, payment plan, DLD registration. English and Russian.
We will send floor plans, the payment plan and available units for this project.
Project data comes from the Dubai Land Department (DLD) registry.
Every figure carries its origin: “DLD registry” is taken from the Dubai Land Department register, “Developer supplied” is stated by the developer, “Our calculation” is computed by us from the first two. Developer prices change without notice — confirm before you commit. Methodology
Barari Gate by ADE is a 274-apartment residential development in Majan, Wadi Al Safa 3, Dubai, developed by ADE Properties. It is registered as an active project with a 0.00% completion ratio and an expected handover in Q4 2028.
Barari Gate by ADE is planned as a contemporary residential building with a ground floor, podium, 10 residential floors and a roof level. The project combines apartment residences with retail shops in the building. Its residential collection includes studios, one-bedroom apartments, two-bedroom apartments with maid’s rooms, and two- and three-bedroom apartments with maid’s rooms and pools. Smart-home features are specified for lighting, climate control, security and curtains. The interiors include living spaces with natural light, kitchens with practical layouts and storage, and bedrooms finished with premium materials. Bathrooms are planned with quality materials, clean detailing and neutral finishes. The main lobby is designed with high ceilings, natural light and premium finishes.
Studios at Barari Gate by ADE range from 438 to 536 sq ft, with prices starting from AED 670,000. One-bedroom apartments range from 775 to 900 sq ft and start from AED 1,188,000. Two-bedroom apartments with a maid’s room range from 1,560 to 1,900 sq ft, with prices from AED 1,700,000. The collection also includes two-bedroom apartments with a maid’s room and a pool. Three-bedroom apartments with a maid’s room and pool range from 2,527 to 3,840 sq ft, starting from AED 2,650,000. The range of layouts spans compact studio residences through to larger three-bedroom homes with maid’s rooms and pools.
Residents will have access to indoor and outdoor gym spaces, allowing for training in indoor and open-air settings. The amenity programme also includes a yoga area, sauna and jacuzzi. Water facilities comprise an infinity swimming pool and a separate kids’ swimming pool. For families, the project provides both indoor and outdoor kids’ play areas. Active amenities include a basketball court, padel court, jogging track and bicycle track. Social and leisure facilities include a billiards area and ping pong area. A business center forms part of the shared facilities, alongside indoor and outdoor common areas. These amenities are integrated across the development’s indoor and outdoor spaces.
Barari Gate by ADE is located in Majan, within Wadi Al Safa 3 in Dubai. Global Village is listed at five minutes from the development, while IMG Worlds of Adventure is listed at eight minutes. Al Barari is five minutes away, and Dubai Hills Mall and Dubai Miracle Garden are each listed at 10 minutes. Downtown Dubai and Burj Khalifa, the Museum of the Future, Burj Al Arab and Dubai International Airport are each listed at 20 minutes. Al Maktoum International Airport, The Palm Jumeirah and Dubai Marina are each listed at 25 minutes. Majan Active Park East is 0.2 km away, Majan Family Park is 0.3 km away and Majan Active Park is 0.5 km away. IMG Worlds of Adventure is also listed at 1.2 km and Global Village at 3.0 km.
The payment structure is 60/40. A 20% down payment is due on booking, followed by 40% during construction through instalments. The remaining 40% is payable post-handover within 36 months. Handover is expected in Q4 2028. The project’s registered completion date is 31 December 2028. Its registered status is Active, with a recorded completion ratio of 0.00%. The project has 274 apartments (+8 non-residential units) and a registered start date of 13 January 2026.
Barari Gate by ADE is developed by ADE Properties. The company was founded in 2023. ADE Properties is the developer name used for the project, which is located in Majan, Wadi Al Safa 3. The development brings together a ground-plus-podium-and-10-floor building configuration, a 274-apartment project scale, apartment types from studios to three-bedroom residences, and shared facilities including fitness, children’s play, pool, work and sports spaces.
Resale prices in this area: Majan Apartments: Resale Market Report H1 2026 — 553 DLD resale deals, median AED 866/sq ft.
Compare with other projects under construction: all off-plan projects in Dubai — completion data from the DLD register, prices and handover dates.
Dubai market as a whole: prices, transactions and trends (DLD data) →
The building is still under construction, so it has no RERA-approved budget yet — that comes after handover. The figures below are what already-completed buildings in the area pay.
Check the charge for a specific building →
Median across 43 completed buildings in Majan for 2026, from the DLD service charge index (Mollak). This is an area benchmark, not this project’s rate: RERA approves that after handover and it may land either side of the median.
Based on 50 registered DLD sales in Barari Gate by ADE between 15 Apr 2026 and 9 Nov 2026: median 17 271 AED/m² (1 605 AED/sq ft); half of the deals fell between 15 850 and 17 655 AED/m². This is transaction statistics, not a valuation of a specific unit: floor, view, finish and condition move the price.
| Type | Indicative price | Deals | Median AED/m² | Median area, m² |
|---|---|---|---|---|
| Studio | AED 722 000 | 33 | 17 562 | 41.1 |
| 1 BR | AED 1 212 000 | 5 | 15 942 | 76 |
| 2 BR | AED 1 901 000 | 6 | 11 619 | 163.6 |
| 3 BR | AED 2 680 000 | 3 | 11 416 | 234.8 |
Source: Dubai Land Department open data, the latest up to 50 sales in the building; areas as registered; refreshed daily. Deals outside 3,000–200,000 AED/m² are excluded.
PDF shortlist · updated 1 November 2026
Majan: new projects and prices
30 projects · prices from DLD and developers
Living Legends Phase 7 Majan · Studio, 1–4 BR
from AED 476,000
Lazord by LAPIS Majan · Studio, 1–2 BR
from AED 499,000
Living Legends Phase 4 Majan · Studio, 1–4 BR
from AED 523,000
27 more in the PDF: prices, handover dates, payment plans
The PDF opens instantly. Refreshed monthly from DLD data.
142 of 274 apartments have been sold to first buyers per the DLD register. DLD registrations, including resales: 150 (since 2026). We compare your unit with sales of the same layout here, not with asking prices. Free, reply within 24 hours.
Machine-readable mirrors of this page: Markdown · JSON. They carry the same figures as this page, each with its origin labelled.
How to cite:Barari Gate by ADE — Continental Club Property, from Dubai Land Department registry and developer data, 2026-11-10, https://continentalclub.ae/project/barari-gate-by-ade-majan/