Solara Tower Dubai is a residential project by S O L Properties Development in Downtown Dubai, Dubai, with handover 15.08.2027, construction 20.7% complete per the DLD registry.

Construction20.7%

Construction progress

20.73%
  • Handover15.08.2027
  • Status date30.06.2026
  • DLD project number2928

Data from the Dubai Land Department project registry (updated 06.08.2026 09:55).

About the project

Solara Tower Dubai is an active single-building project in Downtown Dubai by S O L Properties Development. The building is configured as 4B+G+M+3P+51 Floors and is scheduled for completion on 15 August 2027. Its recorded completion ratio was 20.73% at the inspection dated 30 June 2026.

The project and building configuration

Solara Tower Dubai forms a one-building development in Downtown Dubai. Its recorded configuration is 4B+G+M+3P+51 Floors: four basement levels, a ground floor, a mezzanine, three parking floors and 51 floors. The building is designed with a concrete structure and block construction, with internal and external finishes. The project has a total area of 59,339.54. S O L Properties Development is the developer of Solara Tower Dubai, while Emaar Development is identified as the master developer. The project is designated within the Burj Khalifa area of the Downtown Dubai setting.

Construction status and scheduled completion

The project started on 1 August 2024 and is active. Its completion ratio was recorded at 20.73% following the inspection of 30 June 2026. The scheduled completion date is 15 August 2027. The construction programme therefore runs from the recorded August 2024 start date to the August 2027 completion date. Solara Tower Dubai carries project number 2928. The active status, inspection result and scheduled completion date provide the recorded construction position for the development.

Downtown Dubai setting

Solara Tower Dubai is in Downtown Dubai, a central mixed-use district built around Burj Khalifa and The Dubai Mall. The district brings together high-density residential towers, hotels, retail and leisure destinations, with pedestrian promenades and the Dubai Fountain forming part of its urban setting. Downtown Dubai sits next to Business Bay and has access to the Dubai International Financial Centre. Its street network and pedestrian boulevards connect residential and hotel developments with retail, dining and cultural destinations. High-rise residential buildings, branded hotel residences and mixed-use podiums define much of the district’s built environment.

Metro and district connectivity

Downtown Dubai is served by Dubai Metro’s Red Line. Station R25 is 1,143 metres from the core boulevard, and the Burj Khalifa / Dubai Mall interchange provides a principal metro connection for the district. Pedestrian links around the interchange connect the wider Downtown Dubai area. Infrastructure work at the Burj Khalifa / Dubai Mall metro interchange has been directed towards increasing passenger capacity. Downtown Dubai’s position also places it beside Business Bay and within reach of DIFC, linking the district with nearby business and financial areas.

Key destinations from central Downtown Dubai

From central Downtown Dubai, Burj Khalifa is 0.5 km away and The Dubai Mall is 0.3 km away by road. Business Bay is 1.7 km away, while Dubai International Financial Centre is 1.9 km away. Dubai International Airport is 10.9 km away by road. Other recorded road distances include 11.6 km to Mall of the Emirates, 14.2 km to Global Village, 16.8 km to Palm Jumeirah, 18.8 km to Dubai Marina, 19.5 km to JBR Beach, 29.2 km to Expo City Dubai and 35.2 km to Al Maktoum International Airport.

The surrounding development landscape

Downtown Dubai includes residential, hotel-branded and mixed-use projects alongside established towers. Developments in the district include Vida Residences Dubai Mall, The Address Residence Sky View, Rove Home Residences, Fairmont Residences, Elegance Tower, DT1, Burj Crown and Boulevard Heights. Nearby schemes include The Grand Boulevard by Emaar Properties, Langham Place Downtown Dubai by OMNIYAT, 18 and 29 Burj Dubai Boulevard by Emaar Properties, and Baccarat Hotel & Residences Dubai by H&H Development. Completed buildings in the wider area include Bellevue Towers, completed in 2016, Boulevard Point, completed in 2013, and Burj Crown, completed in 2020.

FAQ

Who is the developer of Solara Tower Dubai?
S O L Properties Development is the developer of Solara Tower Dubai. Emaar Development is identified as the master developer.
Where is Solara Tower Dubai located?
Solara Tower Dubai is located in Downtown Dubai, within the Burj Khalifa area designation.
What is the completion status of Solara Tower Dubai?
The project is active, with a recorded completion ratio of 20.73% at the inspection dated 30 June 2026.
When is Solara Tower Dubai scheduled for completion?
The scheduled completion date is 15 August 2027. The recorded project start date is 1 August 2024.
How many floors will Solara Tower Dubai have?
The building configuration is recorded as 4B+G+M+3P+51 Floors. This includes four basement levels, a ground floor, mezzanine, three parking floors and 51 floors.
What is the building structure of Solara Tower Dubai?
The project is designed with a concrete structure and block construction, with internal and external finishes.
What is close to Solara Tower Dubai in Downtown Dubai?
From central Downtown Dubai, The Dubai Mall is 0.3 km away and Burj Khalifa is 0.5 km away by road. Business Bay is 1.7 km away and DIFC is 1.9 km away.
Is Downtown Dubai served by the metro?
Downtown Dubai is served by the Dubai Metro Red Line. Station R25 is 1,143 metres from the core boulevard.
How can I buy an apartment in Solara Tower Dubai?
Submit an enquiry via the form on this page or message us on WhatsApp — a Continental Club Property broker (RERA 31933) will help you choose a unit and send the brochure and payment plan.

Nearby projects

Request
Request