Serenity Lakes 2 is a residential project by Gulf Land Developers in Jumeirah Village Circle, Dubai, with handover 05.11.2025, construction 50% complete per the DLD registry.

Construction50%

Construction progress

50%
  • Handover05.11.2025
  • Status date02.07.2026
  • DLD project number1555

Data from the Dubai Land Department project registry (updated 08.08.2026 10:48).

Construction progress 58
2 July 2026 50.00%
Serenity Lakes 2, Jumeirah Village Circle construction progress — 2 July 2026, 50.00% complete, photo 1 of 8Serenity Lakes 2, Jumeirah Village Circle construction progress — 2 July 2026, 50.00% complete, photo 2 of 8Serenity Lakes 2, Jumeirah Village Circle construction progress — 2 July 2026, 50.00% complete, photo 3 of 8Serenity Lakes 2, Jumeirah Village Circle construction progress — 2 July 2026, 50.00% complete, photo 4 of 8Serenity Lakes 2, Jumeirah Village Circle construction progress — 2 July 2026, 50.00% complete, photo 5 of 8Serenity Lakes 2, Jumeirah Village Circle construction progress — 2 July 2026, 50.00% complete, photo 6 of 8Serenity Lakes 2, Jumeirah Village Circle construction progress — 2 July 2026, 50.00% complete, photo 7 of 8Serenity Lakes 2, Jumeirah Village Circle construction progress — 2 July 2026, 50.00% complete, photo 8 of 8

Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.

Recent transactions

DateTypeSize, m²Price, AED
23.07.2026Studio49.5709 000
08.07.2026Studio20.1254 430
08.04.2026Studio40.3433 578
13.01.20263 BR210.92 270 530
24.03.20251 BR79.71 027 000
18.10.2024Studio40.8527 388
17.10.2024Studio37.8486 312
11.10.2024Studio37.8576 304
20.02.20241 BR78.11 322 913
16.08.2023Studio42.2658 175
29.05.20231 BR79.7868 444
29.05.20233 BR210.92 270 530
25.05.2022Studio37.7360 000

Dubai Land Department transaction registry, updated 2026-08-07. Explore Dubai property transactions →

Places nearby

🌳 Qaret Park · 0.5 km🌳 Roolh Park · 0.5 km🌳 Sabar Park · 0.5 km🌳 Sider Park · 0.7 km🌳 Sgal Park · 0.8 km

About the project

Serenity Lakes 2 is a residential development by Gulf Land Property Developers in Jumeirah Village Circle, Dubai. The project comprises 268 units across two buildings, with a 2B+G+4 building configuration. It is active, with completion recorded at 50.00% on 2 July 2026.

The project at a glance

Serenity Lakes 2 is a 268-unit residential project in Jumeirah Village Circle. The development has two buildings and a total project area of 19,846.14 square metres. Its building description is 2B+G+4, referring to two basement levels, a ground floor and four upper floors. The project commenced on 1 June 2014. Its recorded completion date is 5 November 2025, while its construction status is active and its completion ratio is 50.00% as at 2 July 2026. The development is located within the wider Jumeirah Village Circle master community, a freehold residential district developed by Nakheel.

Jumeirah Village Circle setting

Jumeirah Village Circle is a large mixed residential master development launched by Nakheel in 2005. The community covers more than 870 hectares and is organised into six districts. Its housing mix includes low- to mid-rise apartment buildings, townhouses and villas, with infrastructure and residential development delivered in phases. JVC sits near the junction of Sheikh Zayed Road and Al Khail Road and has entry and exit points connecting to Hessa Street. The district remains an active residential area with completed buildings alongside continuing construction and new services. Serenity Lakes 2 gives buyers a position within this established master-planned community.

Road links and surrounding destinations

JVC is principally car-oriented, with road connections to major corridors in Dubai. From the community, Dubai Marina is 7.3 km away, Palm Jumeirah is 9.3 km away and JBR Beach is 8.0 km away. Mall of the Emirates is 6.9 km away, while Downtown Dubai and Burj Khalifa are 17.0 km away. The Dubai Mall is 17.3 km from JVC, Dubai International Airport is 27.0 km away and Al Maktoum International Airport is 18.4 km away. The nearest Dubai Metro Red Line station, R34, is 6,139 metres from central JVC locations. Journey times by road vary according to traffic and route.

Retail and community infrastructure

Circle Mall is a retail development within JVC planned with 235 shops, an anchor supermarket, two department stores, a multi-screen cinema, a health clinic, cafés, restaurants and a food court. The project had topped out by July 2020, with part of its façade complete. JVC also includes multiple internal neighbourhoods and villa clusters, creating a district made up of apartment buildings, townhouses and villas rather than a single housing type. The community has continued to add infrastructure over time, including road improvements and district-level services. Empower awarded a contract for the design of the second of six district cooling plants in Jumeirah Village, with construction scheduled to begin in the first quarter of 2025.

Construction status and key dates

Serenity Lakes 2 is recorded as active. The latest stated completion ratio is 50.00%, based on an inspection dated 2 July 2026. The project start date is 1 June 2014 and the recorded completion date is 5 November 2025. These dates and the completion ratio identify the current recorded project position for buyers considering a closer review of construction progress. The development has 268 total units and two buildings, providing a defined project scale within Jumeirah Village Circle. Buyers can use these project details alongside their own review of the current development stage and available units.

The developer

Gulf Land Property Developers is the developer of Serenity Lakes 2. The company is responsible for this 268-unit residential project in Jumeirah Village Circle. The development sits within a master community launched by Nakheel, which is also identified as the master developer for the area. Serenity Lakes 2 therefore combines a project-level developer, Gulf Land Property Developers, with a broader JVC setting that includes residential, retail and infrastructure development across multiple districts.

FAQ

Who is the developer of Serenity Lakes 2?
Serenity Lakes 2 is developed by Gulf Land Property Developers.
Where is Serenity Lakes 2 located?
The project is located in Jumeirah Village Circle, Dubai. JVC is near the junction of Sheikh Zayed Road and Al Khail Road.
What is the completion status of Serenity Lakes 2?
Serenity Lakes 2 is active and recorded at 50.00% completion. The stated inspection date is 2 July 2026.
How many units are in Serenity Lakes 2?
The development contains 268 units across two buildings.
What is the building configuration of Serenity Lakes 2?
The recorded configuration is 2B+G+4, with two basement levels, a ground floor and four upper floors.
What is the recorded completion date for Serenity Lakes 2?
The recorded completion date is 5 November 2025. The project start date is 1 June 2014.
What is near Serenity Lakes 2 in JVC?
Dubai Marina is 7.3 km from JVC, Mall of the Emirates is 6.9 km away and Palm Jumeirah is 9.3 km away. Circle Mall is planned with 235 shops, a supermarket, department stores, a cinema and food outlets.
Is there a Metro station near Jumeirah Village Circle?
The nearest Dubai Metro Red Line station, R34, is 6,139 metres from central JVC locations.
How can I buy an apartment in Serenity Lakes 2?