by Gulf Land Developers in Jumeirah Village Circle
Serenity Lakes 2 is a residential project by Gulf Land Developers in Jumeirah Village Circle, Dubai, with handover 05.11.2025, construction 50% complete per the DLD registry.
Construction progress
- Handover05.11.2025
- Status date02.07.2026
- DLD project number1555
Data from the Dubai Land Department project registry (updated 08.08.2026 10:48).
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: Gulf Land Developers · District: Jumeirah Village Circle
Recent transactions
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 23.07.2026 | Studio | 49.5 | 709 000 |
| 08.07.2026 | Studio | 20.1 | 254 430 |
| 08.04.2026 | Studio | 40.3 | 433 578 |
| 13.01.2026 | 3 BR | 210.9 | 2 270 530 |
| 24.03.2025 | 1 BR | 79.7 | 1 027 000 |
| 18.10.2024 | Studio | 40.8 | 527 388 |
| 17.10.2024 | Studio | 37.8 | 486 312 |
| 11.10.2024 | Studio | 37.8 | 576 304 |
| 20.02.2024 | 1 BR | 78.1 | 1 322 913 |
| 16.08.2023 | Studio | 42.2 | 658 175 |
| 29.05.2023 | 1 BR | 79.7 | 868 444 |
| 29.05.2023 | 3 BR | 210.9 | 2 270 530 |
| 25.05.2022 | Studio | 37.7 | 360 000 |
Dubai Land Department transaction registry, updated 2026-08-07. Explore Dubai property transactions →
Places nearby
About the project
Serenity Lakes 2 is a residential development by Gulf Land Property Developers in Jumeirah Village Circle, Dubai. The project comprises 268 units across two buildings, with a 2B+G+4 building configuration. It is active, with completion recorded at 50.00% on 2 July 2026.
The project at a glance
Serenity Lakes 2 is a 268-unit residential project in Jumeirah Village Circle. The development has two buildings and a total project area of 19,846.14 square metres. Its building description is 2B+G+4, referring to two basement levels, a ground floor and four upper floors. The project commenced on 1 June 2014. Its recorded completion date is 5 November 2025, while its construction status is active and its completion ratio is 50.00% as at 2 July 2026. The development is located within the wider Jumeirah Village Circle master community, a freehold residential district developed by Nakheel.
Jumeirah Village Circle setting
Jumeirah Village Circle is a large mixed residential master development launched by Nakheel in 2005. The community covers more than 870 hectares and is organised into six districts. Its housing mix includes low- to mid-rise apartment buildings, townhouses and villas, with infrastructure and residential development delivered in phases. JVC sits near the junction of Sheikh Zayed Road and Al Khail Road and has entry and exit points connecting to Hessa Street. The district remains an active residential area with completed buildings alongside continuing construction and new services. Serenity Lakes 2 gives buyers a position within this established master-planned community.
Road links and surrounding destinations
JVC is principally car-oriented, with road connections to major corridors in Dubai. From the community, Dubai Marina is 7.3 km away, Palm Jumeirah is 9.3 km away and JBR Beach is 8.0 km away. Mall of the Emirates is 6.9 km away, while Downtown Dubai and Burj Khalifa are 17.0 km away. The Dubai Mall is 17.3 km from JVC, Dubai International Airport is 27.0 km away and Al Maktoum International Airport is 18.4 km away. The nearest Dubai Metro Red Line station, R34, is 6,139 metres from central JVC locations. Journey times by road vary according to traffic and route.
Retail and community infrastructure
Circle Mall is a retail development within JVC planned with 235 shops, an anchor supermarket, two department stores, a multi-screen cinema, a health clinic, cafés, restaurants and a food court. The project had topped out by July 2020, with part of its façade complete. JVC also includes multiple internal neighbourhoods and villa clusters, creating a district made up of apartment buildings, townhouses and villas rather than a single housing type. The community has continued to add infrastructure over time, including road improvements and district-level services. Empower awarded a contract for the design of the second of six district cooling plants in Jumeirah Village, with construction scheduled to begin in the first quarter of 2025.
Construction status and key dates
Serenity Lakes 2 is recorded as active. The latest stated completion ratio is 50.00%, based on an inspection dated 2 July 2026. The project start date is 1 June 2014 and the recorded completion date is 5 November 2025. These dates and the completion ratio identify the current recorded project position for buyers considering a closer review of construction progress. The development has 268 total units and two buildings, providing a defined project scale within Jumeirah Village Circle. Buyers can use these project details alongside their own review of the current development stage and available units.
The developer
Gulf Land Property Developers is the developer of Serenity Lakes 2. The company is responsible for this 268-unit residential project in Jumeirah Village Circle. The development sits within a master community launched by Nakheel, which is also identified as the master developer for the area. Serenity Lakes 2 therefore combines a project-level developer, Gulf Land Property Developers, with a broader JVC setting that includes residential, retail and infrastructure development across multiple districts.