Developer: MAK Developers · Meydan Avenue
Saddlewood Park is a residential project by MAK Developers in Meydan Avenue, Dubai, with prices from AED 1 650 000, handover Q4 2027, construction 0.1% complete per the DLD registry, 62 units.
| Type | Size, sq.ft |
|---|---|
| 1 Bedroom | 799 |
| 2 Bedroom | 1 360–2 558 |
| 3 Bedroom | 2 511 |
| 4 Bedroom | 2 560 |
The purchase price is split into these stages.
The exact schedule is confirmed in the sale agreement for the selected unit.
Data from the Dubai Land Department project registry (updated 18.08.2026 09:55).
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: MAK Developers · District: Meydan Avenue
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 17.06.2026 | 1 BR | 75.2 | 1 653 000 |
| 11.06.2026 | 3 BR | 228.9 | 4 100 000 |
| 19.05.2026 | 1 BR | 67.5 | 1 725 000 |
| 19.05.2026 | 1 BR | 71.6 | 1 725 000 |
| 30.04.2026 | 325.3 | 4 991 000 | |
| 20.04.2026 | 2 BR | 102.4 | 2 600 000 |
| 26.03.2026 | 1 BR | 71.2 | 1 650 750 |
| 04.03.2026 | 1 BR | 73.4 | 2 005 000 |
| 28.01.2026 | 2 BR | 110.4 | 2 600 000 |
| 22.01.2026 | 2 BR | 142.3 | 2 950 000 |
| 17.12.2025 | 1 BR | 73.4 | 1 850 000 |
| 17.12.2025 | 2 BR | 126.5 | 2 900 000 |
| 15.12.2025 | 2 BR | 109.0 | 2 575 000 |
| 15.12.2025 | 2 BR | 109.3 | 2 650 000 |
| 15.12.2025 | 2 BR | 104.9 | 2 650 000 |
| 08.12.2025 | 2 BR | 125.3 | 2 440 000 |
| 14.11.2025 | 1 BR | 70.6 | 1 572 500 |
| 13.11.2025 | 2 BR | 126.6 | 2 537 625 |
| 07.05.2014 | 1 393.5 | 15 353 850 |
Dubai Land Department transaction registry, updated 2026-08-16. Explore Dubai property transactions →

Saddlewood Park is a residential development by MAK Developers at Meydan Avenue in Nad Al Shiba First, within the wider Meydan area of Mohammed Bin Rashid City. The project comprises one building with a ground floor, four residential floors and a rooftop, containing 62 units. It is active and recorded at 10% completion, with completion scheduled for 30 September 2027.
Saddlewood Park is planned as a ground-plus-four-storey residential building with a rooftop. Its 62-unit scale places it among the lower-density residential schemes at Meydan Avenue. The announced architectural approach uses contemporary lines, glass elements, neutral tones and gold-coloured detailing, with an equestrian design reference linked to the Meydan setting. Greenery is incorporated at building levels and in the surrounding landscape concept. The building is positioned in Nad Al Shiba First, beside the Meydan Racecourse area. The development also includes two retail spaces, providing commercial accommodation within the project alongside the residential component. Views identified for the development include the Meydan Racecourse, golf course, lake, landscaped areas and the Burj Khalifa skyline.
The residence mix includes one- and two-bedroom apartments, together with three- and four-bedroom penthouses. The homes are presented as smart residences with connected features that include smart door locks and controllable lighting. Interior materials and finishes identified for the project include warm woods, veined stone, textured fabrics and brushed-gold elements. Kitchens are specified with Miele appliances. Schneider Electric lighting is named within the smart-home specification, while bathrooms are specified with Villeroy & Boch and Gessi fittings and fixtures. The project is described as integrating indoor and outdoor living areas, with the architectural and landscape concept bringing greenery into the setting of the building.
The rooftop amenity offering includes an infinity pool, yoga deck, Zen garden, sun beds and see-saw loungers. Fitness and wellness facilities include a padel court, an AI-powered gym, a Pilates studio, a steam room, and an ice and fire retreat. A clubhouse and outdoor seating areas provide additional shared spaces within the scheme. The project also includes a co-working space, giving residents a dedicated work setting within the building. Two retail outlets form part of the development. These facilities sit within a project designed as a low-rise address with a rooftop level, combining residential floors with leisure, wellness, work and retail components.
Saddlewood Park is located at Meydan Avenue, a mixed-use district within Nad Al Shiba 1 in the Meydan quarter of Mohammed Bin Rashid City. Meydan Avenue runs alongside Al Meydan Road and is immediately adjacent to Meydan Racecourse and The Meydan Hotel. The district combines residential buildings, retail corridors and landscaped open space, with a canal promenade and central plaza included in its wider masterplan. The Track Meydan Golf is 0.8 km away, while Riviera South Park is 0.9 km away. Ras Al Khor Wildlife Sanctuary is 3.5 km away. The recorded road distance to Business Bay is 4.4 km, Dubai Mall is 4.7 km, and Burj Khalifa and Downtown Dubai are 4.9 km away. Dubai International Airport is 12.6 km away.
Starting prices are AED 1.65 million. The payment structure is 60/40: 10% is due on booking, 50% is payable during construction through instalments, and the remaining 40% is due on handover. The project start date is 1 December 2025. Completion is scheduled for 30 September 2027. Saddlewood Park is active and has reached 10% completion. The development consists of one building and has a total area of 7,570.04 square metres. Buyers considering the payment schedule can assess the initial booking contribution, construction-stage payments and final handover balance within the stated 60/40 structure.
MAK Developers is the developer of Saddlewood Park. The company was founded in 2023. For this project, MAK Developers is delivering a single residential building at Meydan Avenue, comprising 62 units across a ground floor, four residential floors and a rooftop. The development combines apartments and penthouses with two retail spaces, shared leisure facilities, fitness and wellness areas, and a co-working space. Its location places the project within the Meydan area of Mohammed Bin Rashid City, adjacent to the racecourse setting and the district’s planned canal-side, retail and landscaped public spaces.
We will send floor plans, the payment plan and available units for this project.
Project data comes from the Dubai Land Department (DLD) registry.