by Reportage Properties in Reportage Village 1
Reportage Village 1 is a residential project by Reportage Properties in Reportage Village 1, Dubai, with handover 31.12.2027, construction 20.7% complete per the DLD registry.
Construction progress
- Handover31.12.2027
- Status date05.05.2026
- DLD project number2784
Data from the Dubai Land Department project registry (updated 08.08.2026 10:48).
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: Reportage Properties · District: Reportage Village 1
Recent transactions
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 03.08.2026 | 2 BR | 151.3 | 1 293 600 |
| 31.07.2026 | 2 BR | 147.9 | 1 320 000 |
| 31.07.2026 | 2 BR | 88.0 | 1 000 000 |
| 31.07.2026 | 2 BR | 88.0 | 1 140 000 |
| 31.07.2026 | 2 BR | 88.0 | 1 140 000 |
| 31.07.2026 | 2 BR | 88.0 | 1 260 000 |
| 31.07.2026 | 2 BR | 88.0 | 1 200 000 |
| 31.07.2026 | 2 BR | 88.0 | 1 140 000 |
| 31.07.2026 | 2 BR | 141.6 | 1 320 000 |
| 31.07.2026 | 2 BR | 145.9 | 1 293 600 |
| 31.07.2026 | 2 BR | 88.0 | 1 395 359 |
| 31.07.2026 | 2 BR | 88.0 | 1 317 015 |
| 31.07.2026 | 3 BR | 130.0 | 1 544 000 |
| 31.07.2026 | 2 BR | 88.0 | 1 736 598 |
| 30.07.2026 | 2 BR | 88.0 | 929 658 |
| 30.07.2026 | 2 BR | 90.8 | 929 657 |
| 23.07.2026 | 2 BR | 88.0 | 1 361 358 |
| 13.07.2026 | 2 BR | 148.8 | 1 293 600 |
| 13.07.2026 | 2 BR | 140.3 | 1 320 000 |
| 13.07.2026 | 2 BR | 88.0 | 1 601 598 |
Dubai Land Department transaction registry, updated 2026-08-08. Explore Dubai property transactions →
Places nearby
Projects nearby
About the project
Reportage Village 1 is an active residential project in Wadi Al Safa 7, DubaiLand, developed by Reportage Prime Properties. The project has a recorded total of 1,753 units and is scheduled for completion on 31 December 2027. Construction progress stands at 20.71%, based on the latest update dated 11 May 2026.
The project and construction
Reportage Village 1 forms part of the wider Reportage Village masterplan in DubaiLand. It is located in Wadi Al Safa 7, within Dubai’s urban area linking DubaiLand with central and western parts of the city. The project began on 31 December 2023 and is recorded as active. Its construction description identifies a concrete structure and blockwork, with internal and external finishes. The project has a total recorded area of 239,776.93 and a total of 1,753 units. A residential component of 875 villas is identified within the project description.
Construction status and completion date
Construction progress for Reportage Village 1 is recorded at 20.71%. The latest project update is dated 11 May 2026, following an inspection dated 5 May 2026. The project’s scheduled completion date is 31 December 2027. Its active status indicates that construction remains under way. The recorded start date is 31 December 2023, establishing the current development period from late 2023 through the scheduled completion at the end of 2027. Buyers considering the project can use the stated completion date and recorded progress figure as the available reference points for the present construction stage.
Setting within DubaiLand
Reportage Village 1 is situated in Wadi Al Safa 7 in DubaiLand. Global Village is 3.3 km from the community, providing a close reference point for the location. Mall of the Emirates is 11.7 km away. Dubai Marina is 15.1 km away, while Palm Jumeirah is 16.5 km away. Burj Khalifa/Downtown Dubai and The Dubai Mall are each 16.8 km away. Al Maktoum International Airport is 20.9 km away, and Dubai International Airport is 24.3 km away. These distances place the community within the DubaiLand corridor while retaining road access to central Dubai, waterfront districts, shopping destinations and both airports.
Schools and nearby destinations
Two schools are located 1.8 km from Reportage Village 1: GEMS Metropole School Al Waha and Jumeirah English Speaking School Arabian Ranches. Global Village is 3.3 km away and serves as a nearby destination for events and leisure. The location is connected to Dubai’s road network, with routes extending towards Downtown Dubai, Dubai Marina, Palm Jumeirah and Mall of the Emirates. The Dubai Mall is 16.8 km away, while Dubai Marina is 15.1 km away. The setting combines a DubaiLand address with access by car to destinations in central, western and coastal areas of Dubai.
Project scale
Reportage Village 1 has a recorded total area of 239,776.93 and 1,753 total units. The development description identifies 875 residential villas and specifies a concrete-and-block construction approach with internal and external finishes. The project is part of the larger Reportage Village masterplan rather than a standalone district. Its location in Wadi Al Safa 7 positions it near Global Village and the wider DubaiLand area. The recorded project dates run from 31 December 2023 to 31 December 2027, with construction progress of 20.71% in the latest update dated 11 May 2026.
The developer
Reportage Prime Properties is the developer of Reportage Village 1. The company is responsible for the active project in Wadi Al Safa 7, DubaiLand. Reportage Village 1 is included within the wider Reportage Village masterplan and has a scheduled completion date of 31 December 2027. The current recorded project progress is 20.71%. The development has 1,753 total units across a recorded area of 239,776.93, while its residential description identifies 875 villas. Construction commenced on 31 December 2023 and is described as concrete structure and blockwork with internal and external finishes.
Registered transactions in Reportage Village 1
Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.
What buyers actually paid
| Type | Size, m² | Price, AED | Per m² | Deals |
|---|---|---|---|---|
| 2 bedrooms | 88 | 1 170 000 | 13 295 | 1 101 |
| 4 bedrooms | 88 | 1 319 066 | 14 989 | 280 |
| 3 bedrooms | 170 | 1 714 665 | 10 086 | 146 |
Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.
How the price per square metre moved
From 2024 to 2026 — +22% on the price per square metre in this building. The district moved +8% over the same period, so the building outpaced the market.
The upper figure is the median price per m² in AED, the lower one is the number of deals. Years with fewer than eight deals are skipped.
* 2026 is still in progress and its bar covers part of the year. The growth figure above uses completed years.
Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.





























