Developer: Emaar Properties · Dubai Creek Harbour
Oria Tower is a residential project by Emaar Properties in Dubai Creek Harbour, Dubai, with prices from AED 1 600 000, handover Q3 2028, construction 71.1% complete per the DLD registry, 163 units, 176 DLD-registered sales since 2024.
Every figure carries its origin: “DLD registry” is taken from the Dubai Land Department register, “Developer supplied” is stated by the developer, “Our calculation” is computed by us from the first two. Developer prices change without notice — confirm before you commit. Methodology
| Type | Units | Typical size, sq.ft |
|---|---|---|
| 1 Bedroom | 49 | 749–750 |
| 2 Bedroom | 74 | 1 223–1 309 |
| 3 Bedroom | 40 | 1 659–1 727 |
Size range excludes the smallest and largest 5% of units of each type.
All units are freehold. Data from the DLD registry.
The purchase price is split into these stages.
The exact schedule is confirmed in the sale agreement for the selected unit.
For UAE residents the down payment starts at 20% with terms up to 25 years. Indicative monthly payment for prices from 1 600 000 AED is 6 756 AED.
Estimates only; not a bank approval.
All Dubai projects handing over in 2028 →
Data from the Dubai Land Department project registry (updated 11.10.2026 09:55).
Pace: 4.70% per month. At this rate 100% falls on 01.02.2027.
The pace is calculated from the past year of inspections. It is an estimate, not a developer commitment. For reference: across 1,175 completed projects the median pace is 2.48% per month and the median build takes 40 months.
56 more photos in the DLD register
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: Emaar Properties · District: Dubai Creek Harbour
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 02.10.2026 | 1 BR | 69.6 | 1 779 888 |
| 03.09.2026 | 2 BR | 121.3 | 2 900 000 |
| 08.06.2026 | 2 BR | 113.6 | 2 400 000 |
| 05.05.2026 | 2 BR | 121.3 | 1 130 755 |
| 27.04.2026 | 2 BR | 118.3 | 2 803 888 |
| 05.03.2026 | 1 BR | 69.7 | 1 814 888 |
| 23.02.2026 | 2 BR | 121.3 | 2 950 000 |
| 03.11.2025 | 2 BR | 113.7 | 2 803 670 |
| 06.10.2025 | 3 BR | 159.6 | 4 012 500 |
| 06.10.2025 | 1 BR | 69.7 | 2 512 500 |
| 06.10.2025 | 1 BR | 69.7 | 2 512 500 |
| 06.10.2025 | 3 BR | 159.5 | 4 012 500 |
| 20.08.2025 | 2 BR | 113.6 | 2 857 888 |
| 10.07.2025 | 1 BR | 69.6 | 2 260 000 |
| 10.07.2025 | 1 BR | 69.6 | 2 260 000 |
| 23.06.2025 | 2 BR | 121.4 | 2 885 888 |
| 01.05.2025 | 2 BR | 56.8 | 1 434 444 |
| 13.03.2025 | 1 BR | 69.6 | 1 600 000 |
| 06.03.2025 | 2 BR | 118.3 | 2 884 888 |
| 05.03.2025 | 2 BR | 113.6 | 2 864 888 |
| 20.01.2025 | 3 BR | 159.6 | 3 742 888 |
| 15.01.2025 | 2 BR | 121.3 | 2 861 979 |
| 11.12.2024 | 2 BR | 121.7 | 2 955 888 |
| 07.08.2024 | 2 BR | 121.3 | 2 904 888 |
| 24.07.2024 | 3 BR | 160.4 | 4 249 888 |
| 18.07.2024 | 2 BR | 121.7 | 2 830 888 |
| 24.06.2024 | 3 BR | 160.2 | 3 774 888 |
| 29.05.2024 | 2 BR | 113.6 | 2 886 888 |
| 27.05.2024 | 2 BR | 118.3 | 2 803 888 |
| 27.05.2024 | 2 BR | 120.8 | 2 812 888 |
| 24.05.2024 | 3 BR | 154.1 | 4 024 888 |
| 23.05.2024 | 2 BR | 120.8 | 2 795 888 |
| 22.05.2024 | 3 BR | 160.2 | 3 817 888 |
| 22.05.2024 | 3 BR | 154.1 | 4 016 888 |
| 16.05.2024 | 3 BR | 160.4 | 4 075 719 |
| 15.05.2024 | 1 BR | 69.6 | 1 786 888 |
| 15.05.2024 | 1 BR | 69.6 | 1 786 888 |
| 13.05.2024 | 3 BR | 159.6 | 3 721 888 |
| 13.05.2024 | 2 BR | 118.3 | 2 854 888 |
| 10.05.2024 | 3 BR | 159.6 | 3 742 888 |
| 07.05.2024 | 2 BR | 118.3 | 2 879 888 |
| 02.05.2024 | 3 BR | 159.5 | 3 726 888 |
| 02.05.2024 | 3 BR | 159.6 | 3 728 888 |
| 02.05.2024 | 2 BR | 121.6 | 2 900 888 |
| 02.05.2024 | 2 BR | 121.6 | 3 054 888 |
| 02.05.2024 | 3 BR | 159.5 | 3 719 888 |
| 02.05.2024 | 2 BR | 120.8 | 2 801 888 |
| 30.04.2024 | 1 BR | 69.6 | 1 779 888 |
| 26.04.2024 | 2 BR | 121.6 | 3 080 888 |
| 26.04.2024 | 1 BR | 69.6 | 1 765 888 |
Dubai Land Department transaction registry, updated 10.10.2026. Explore Dubai property transactions →
Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.
| Type | Size, m² | Price, AED | Per m² | Deals |
|---|---|---|---|---|
| 1 bedroom | 70 | 1 782 888 | 25 470 | 56 |
| 2 bedrooms | 121 | 2 854 888 | 23 594 | 77 |
| 3 bedrooms | 160 | 3 803 888 | 23 774 | 43 |
Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.
Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.
DLD has recorded 176 sales in this building since 2024. We compare your unit with sales of the same layout here, not with asking prices. Free, reply within 24 hours.

Oria Tower is a one-building apartment development by Emaar Properties in Dubai Creek Harbour, adjacent to the Creek Beach district and along Dubai Creek. The project contains 163 residences in one-, two- and three-bedroom configurations. It is active and recorded at 71.10% completion, with handover scheduled for Q3 2028.
Oria Tower is planned as a B+G+P+20+R building, with a concrete structure, blockwork, and internal and external finishes. Its 163 apartments form a single residential building in Dubai Creek Harbour. The development sits adjacent to Creek Beach and along Dubai Creek, placing it within a waterfront district that includes Central Park, Creek Harbour Beach, Creek Marina, Harbour Promenade and Marina Boulevard. The project incorporates a 3,600 sqm amenities podium. Planned outlooks include park views with a city backdrop, while residences are associated with views towards Dubai Creek Canal, mangroves and the Downtown Dubai skyline. Energy-efficient systems are included in the project highlights.
The residential collection at Oria Tower comprises one-, two- and three-bedroom apartments. There are 163 units in total. The apartments are positioned within Dubai Creek Harbour, next to the Creek Beach district and Dubai Creek. Selected residences are described with views of the Creek Canal, mangroves and the Downtown Dubai skyline, while the project also highlights park views with a city backdrop. The development’s setting provides access to the waterfront promenade, Central Park and Creek Harbour Beach. Starting prices are from AED 1,600,000. Unit-specific prices, layouts and availability can vary by apartment configuration and release.
A 3,600 sqm amenities podium is planned for Oria Tower. Facilities include a pool area, infinity pool, kids’ pool, indoor gym, outdoor gym, flexible lawn, common garden and yoga garden. Residents will also have a multipurpose room, lounges and game rooms, together with a kids’ play area and adventure playground. Social and outdoor facilities include a BBQ area, picnic area, sports courts, cycling track and skate park. The wider setting includes the waterfront promenade, Central Park, Harbour Promenade, Marina Boulevard, Creekside Park and Creek Harbour Beach. Electric-vehicle charging stations and bike parking are also included among the listed facilities.
Oria Tower is located in Dubai Creek Harbour, adjacent to Creek Beach and along Dubai Creek. Downtown Dubai is 10 minutes away, while Dubai International Airport is 15 minutes away. Ras Al Khor Wildlife Sanctuary and Creek Marina Yacht Club are each five minutes from the development. Al Maktoum International Airport is 35 minutes away. Creek Island Central Park is 0.7 km away and Creekside Park Dubai Creek Harbour is 0.8 km away. Imagine at Dubai Festival City is 1.7 km away, Novo Cinema at Dubai Festival City Mall is 1.8 km away, and Jameel Arts Centre is 2.8 km away. Ras Al Khor Wildlife Sanctuary is also 3.3 km away by the listed nearby-distance measure.
The development highlights metro connectivity and includes access to a metro station. An RTA ferry terminal and a water taxi service to Downtown Dubai are also listed as part of the connectivity offering. The waterfront promenade provides a pedestrian route within the surrounding Dubai Creek Harbour setting, linking the project with Creek Beach, Central Park, Creek Harbour Beach, Harbour Promenade and Marina Boulevard. Bike parking and electric-vehicle charging stations are included at the development. Downtown Dubai is listed at a travel time of 10 minutes, and Dubai International Airport at 15 minutes. These connections place the project within a waterfront district with ferry, water-taxi, metro and road-based access points.
Oria Tower has a 90/10 payment plan. The structure requires a 10% down payment on booking, followed by 80% during construction across the first to eighth instalments, with the final 10% payable on handover. Handover is scheduled for Q3 2028. The project is active and has a recorded completion ratio of 71.10%. The development commenced on 26 June 2024. The starting price is AED 1,600,000. The payment plan sets out the percentage allocation between booking, construction and handover, while the apartment type, selected unit and sales release determine the applicable purchase terms.
Emaar Properties is the developer of Oria Tower. Founded in 1997, Emaar Properties has developed Dubai Mall, Burj Khalifa, Dubai Marina and Downtown Dubai. Oria Tower is part of Dubai Creek Harbour, where the project is located beside Creek Beach and Dubai Creek. The building contains 163 one-, two- and three-bedroom apartments and is scheduled for handover in Q3 2028. Its project programme combines the residential collection with a 3,600 sqm amenities podium, waterfront-oriented public areas and transport features including metro connectivity, an RTA ferry terminal and water-taxi service to Downtown Dubai.
Dubai market as a whole: prices, transactions and trends (DLD data) →
The building is still under construction, so it has no RERA-approved budget yet — that comes after handover. The figures below are what already-completed buildings in the area pay.
Check the charge for a specific building →
Median across 19 completed buildings in Dubai Creek Harbour for 2026, from the DLD service charge index (Mollak). This is an area benchmark, not this project’s rate: RERA approves that after handover and it may land either side of the median.
We will send floor plans, the payment plan and available units for this project.
Project data comes from the Dubai Land Department (DLD) registry.
Machine-readable mirrors of this page: Markdown · JSON. They carry the same figures as this page, each with its origin labelled.
How to cite:Oria Tower — Continental Club Property, from Dubai Land Department registry and developer data, 2026-10-03, https://continentalclub.ae/project/oria-tower-dubai-creek-harbour/