Gallery

On map

Surf is a residential project by Emaar Properties in Dubai Creek Harbour, Dubai, with handover 07.03.2023, 173 units.

Units173

Construction progress

100%
  • StatusFinished
  • Handover07.03.2023
  • Status date07.03.2023
  • DLD project number2168

Data from the Dubai Land Department project registry (updated 07.08.2026 09:55).

Recent transactions

DateTypeSize, m²Price, AED
04.08.20261 BR64.41 320 000
04.05.20261 BR64.41 304 000
29.04.20262 BR92.52 400 000
29.04.20262 BR92.51 880 000
27.04.20262 BR156.82 070 000
20.04.20261 BR63.71 675 000
20.04.20261 BR63.71 005 000
25.03.20262 BR92.12 425 000
25.03.20262 BR92.11 940 000
23.02.20261 BR64.41 660 000
23.02.20261 BR64.41 328 000
09.02.20261 BR64.41 640 000
09.02.20261 BR64.41 312 000
03.02.20261 BR64.21 328 000
16.01.20261 BR63.51 280 000
18.12.20251 BR64.21 650 000
09.12.20251 BR64.21 660 000
09.12.20251 BR64.21 328 000
03.12.20251 BR64.41 650 000
03.12.20251 BR64.41 304 000
Rentals — 20
DateTypeSize, m²Rent, AED/yr
3 bed rooms+hall138.7340 000
1bed room+Hall64.4120 000
2 bed rooms+hall92.5125 473
1bed room+Hall64.3100 000
1bed room+Hall64.292 000
2 bed rooms+hall92.1150 000
1bed room+Hall64.485 000
1bed room+Hall67.0116 000
1bed room+Hall64.382 000
1bed room+Hall64.490 000
1bed room+Hall64.495 000
1bed room+Hall63.780 000
2 bed rooms+hall92.2140 000
1bed room+Hall64.480 000
1bed room+Hall64.275 000
2 bed rooms+hall92.5130 000
1bed room+Hall64.480 000
1bed room+Hall67.880 000
2 bed rooms+hall124.3164 000
1bed room+Hall64.475 000

Dubai Land Department transaction registry, updated 2026-08-06. Explore Dubai property transactions →

About the project

Surf is a finished residential project by Emaar Properties in Dubai Creek Harbour. The development comprises 173 residential units across two mid-rise buildings. It reached 100% completion on 7 March 2023.

Surf at Dubai Creek Harbour

Surf forms part of the Creek Beach residential cluster within Dubai Creek Harbour. The project is identified as Phase 2 residential mid-rise development and contains two buildings with a combined 173 residential units. Building 1 is configured as ground, mezzanine, seven floors and roof, with 75 residential units. Building 2 is configured as ground, mezzanine, nine floors and roof, with 93 residential units. The project started on 24 September 2019 and was completed on 7 March 2023. Surf is located in Al Khairan First within the wider Dubai Creek Harbour masterplan.

Two-building residential configuration

The 173 residences at Surf are distributed between two separate mid-rise buildings. Building 1 contains 75 residential units and rises through a ground floor, mezzanine level, seven upper floors and a roof level. Building 2 contains 93 residential units and has a ground floor, mezzanine level, nine upper floors and a roof level. This arrangement makes Surf a two-building residential cluster rather than a single-tower project. The development’s recorded total area is 336,531.98. Its project number is 2168, which is also the development’s Dubai Land Department project number.

Dubai Creek Harbour setting

Dubai Creek Harbour is a waterfront masterplan on Dubai Creek at The Lagoons. It combines high-rise residential clusters, waterfront promenades and large-scale urban facilities. The district sits beside the Ras Al Khor Wildlife Sanctuary, a protected wetland reserve known for its flamingo population and natural habitat. Dubai Creek Harbour includes completed, under-construction and planned residential, retail and public-realm elements. The wider masterplan features waterfront areas with outlooks towards Dubai Creek and the Dubai skyline. Surf sits within this waterfront district in Al Khairan First.

The wider masterplan

Dubai Creek Harbour is being developed by Emaar in partnership with Dubai Holding. The masterplan is planned as a city within a city and covers waterfront and reclaimed land beside Dubai Creek. Its planned components include residential towers, waterfront promenades, public spaces, retail and leisure facilities. The Square is conceived as a major retail and leisure destination within the masterplan. Other named projects in Dubai Creek Harbour include Oria Tower, Creek Haven, Aeon Towers, Address Residences Dubai Creek Harbour, Palace Residences Creek Blue and Creek Bay. A new high-rise is under construction as a future landmark on the Creek skyline.

Transport and future metro plans

Public-transport access to the immediate Dubai Creek Harbour area is currently limited. The nearest current Dubai Metro station is Green Line station G30, which is 2,367 metres from the district. The Dubai Metro Blue Line is planned to improve connections to the Creek area, with a completion target of 2029. Plans for the line include Emaar Properties Station, which is designed by Skidmore, Owings & Merrill. The planned station is intended to stand 74 metres tall and cover 11,000 square metres. The Blue Line and Emaar Properties Station are planned infrastructure rather than completed transport facilities.

Completion status and project dates

Surf has a finished status and a recorded completion ratio of 100.00%. Its inspection date and completion date are both 7 March 2023. Construction began on 24 September 2019. The project is therefore a completed development rather than an under-construction phase. There are 173 units in total, matching the 75 units in Building 1 and 93 units in Building 2. Surf is identified as Creek Beach – Surf under project number 2168. The project’s two residential buildings are configured as mid-rise structures with ground, mezzanine and roof levels.

Emaar Properties

Emaar Properties is the developer of Surf. Emaar is also the principal developer of Dubai Creek Harbour, where the project is located. The company develops the waterfront masterplan in partnership with Dubai Holding. Dubai Creek Harbour includes residential clusters, waterfront promenades, public spaces and planned retail and leisure components. The masterplan sits beside the Ras Al Khor Wildlife Sanctuary and includes projects such as Dubai Creek Residences, Oria Tower, Creek Haven, Aeon Towers, Address Residences Dubai Creek Harbour, Palace Residences Creek Blue and Creek Bay. Surf is one of the completed residential developments within this wider district.

FAQ

Who is the developer of Surf?
Surf is developed by Emaar Properties. Emaar is also the principal developer of Dubai Creek Harbour.
Where is Surf located?
Surf is located in Dubai Creek Harbour, in Al Khairan First. The district is on Dubai Creek at The Lagoons, beside the Ras Al Khor Wildlife Sanctuary.
Is Surf completed?
Yes. Surf has finished status and a recorded completion ratio of 100.00%.
When was Surf completed?
Surf was completed on 7 March 2023. Its inspection date is also recorded as 7 March 2023.
How many units are there at Surf?
Surf contains 173 residential units across two buildings. Building 1 has 75 units and Building 2 has 93 units.
How many buildings does Surf have?
Surf comprises two mid-rise residential buildings. Building 1 is G+M+7+R, while Building 2 is G+M+9+R.
What is near Surf in Dubai Creek Harbour?
Dubai Creek Harbour is beside the Ras Al Khor Wildlife Sanctuary and includes waterfront promenades. Named projects in the district include Dubai Creek Residences, Oria Tower, Creek Haven and Address Residences Dubai Creek Harbour.
What are the nearest metro connections to Dubai Creek Harbour?
Green Line station G30 is 2,367 metres from Dubai Creek Harbour. The Dubai Metro Blue Line is planned to serve the Creek area, with a completion target of 2029.
How can I buy an apartment in Surf?
Submit an enquiry via the form on this page or message us on WhatsApp — a Continental Club Property broker (RERA 31933) will help you choose a unit and send the brochure and payment plan.

Nearby projects

Request
Request