Developer: Sikanta Developments · Dubai South Residential District
Myra Residences is a residential project by Sikanta Developments in Dubai South Residential District, Dubai, with prices from AED 560 000, handover Q1 2027, construction 13.9% complete per the DLD registry, 64 units.
Every figure carries its origin: “DLD registry” is taken from the Dubai Land Department register, “Developer supplied” is stated by the developer, “Our calculation” is computed by us from the first two. Developer prices change without notice — confirm before you commit. Methodology
| Type | Units | Typical size, sq.ft |
|---|---|---|
| Studio | 20 | 419–546 |
| 1 Bedroom | 12 | 935–953 |
| 2 Bedroom | 32 | 1 028–1 159 |
Size range excludes the smallest and largest 5% of units of each type.
All units are freehold. Data from the DLD registry.
The purchase price is split into these stages.
The exact schedule is confirmed in the sale agreement for the selected unit.
For UAE residents the down payment starts at 20% with terms up to 25 years. Indicative monthly payment for prices from 560 000 AED is 2 365 AED.
Estimates only; not a bank approval.
All Dubai projects handing over in 2027 →
Data from the Dubai Land Department project registry (updated 07.10.2026 09:55).
Pace: 2.32% per month. At this rate 100% falls on 20.08.2029.
The pace is calculated from the past year of inspections. It is an estimate, not a developer commitment. For reference: across 1,175 completed projects the median pace is 2.48% per month and the median build takes 40 months.
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: Sikanta Developments · District: Dubai South Residential District
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 05.10.2026 | Studio | 50.8 | 674 906 |
| 22.06.2026 | 2 BR | 106.8 | 1 431 769 |
| 08.06.2026 | Studio | 44.9 | 676 317 |
| 18.05.2026 | 2 BR | 95.5 | 1 211 055 |
| 30.04.2026 | Studio | 39.0 | 587 106 |
| 13.04.2026 | 2 BR | 102.3 | 1 359 917 |
| 20.02.2026 | Studio | 44.9 | 676 317 |
| 21.01.2026 | Studio | 39.0 | 587 106 |
| 21.01.2026 | Studio | 39.0 | 587 106 |
| 21.01.2026 | Studio | 39.0 | 587 106 |
| 08.01.2026 | 2 BR | 106.9 | 1 432 037 |
| 06.01.2026 | Studio | 44.8 | 674 660 |
| 05.01.2026 | Studio | 44.8 | 674 660 |
| 16.12.2025 | Studio | 44.7 | 674 208 |
| 08.12.2025 | Studio | 44.7 | 674 208 |
Dubai Land Department transaction registry, updated 06.10.2026. Explore Dubai property transactions →

Myra Residences is a G+4+R residential building in Dubai South Residential District, comprising 64 homes. Sikanta Developments is developing the project, which offers studios and one- and two-bedroom residences. The project is active, with a reported completion ratio of 13.89% and completion scheduled for Q1 2027.
Myra Residences is a boutique collection of 64 homes within one G+4+R residential building in Dubai South. Its design combines tropical landscaping, interconnected pools and landscaped courtyard areas. The architecture uses terraces and landscaped setbacks, with warm stone, textured plaster and glass forming the stated material palette. The building is planned around natural light, open views and indoor-outdoor living, while water features and planted areas are integrated through the development. Arrival areas include a lobby, and the rooftop is arranged as a leisure setting with a pool and deck. The development’s shared spaces extend across the landscaped ground-level areas and the roof plane.
The residence collection comprises studios, one-bedroom apartments and two-bedroom apartments. There are 64 homes in total, giving Myra Residences a limited-scale residential format. The project presents layouts across these three apartment categories, including studio living areas and kitchens, one-bedroom living rooms, kitchens, bedrooms and bathrooms, and two-bedroom living rooms, kitchens, master bedrooms, bedrooms and bathrooms. Balconies are included in the project’s residential concept, with outlooks referenced towards the skyline. The available unit information identifies the apartment types but does not assign individual sizes or prices to each layout.
The amenity programme includes a rooftop pool, rooftop deck and rooftop kids pool. Residents also have access to a gym and locker room. Tropical landscaping and interconnected pools form part of the wider outdoor setting, alongside landscaped courtyards and water features. Smart-living provisions include Google Nest and digital key access. Security and operations features include 24/7 CCTV on every floor and facilities management. The rooftop deck is positioned as a social and leisure area, while the separate kids pool adds a dedicated water facility for younger residents. These facilities are contained within the 64-home development.
Myra Residences is located in Dubai South Residential District, within the wider Dubai South masterplan. The district is positioned to serve Al Maktoum International Airport and Dubai South’s aviation, logistics and economic precincts. Al Maktoum International Airport (DWC) is listed at one minute from the project. Expo City and District 2020 are each listed at 15 minutes, while Dubai Hills Mall, Ibn Battuta Mall and Dubai Marina are each listed at 20 minutes. Marina Beach is listed at 22 minutes, Jebel Ali Freezone at 26 minutes, and Dubai International Airport (DXB), Burj Khalifa and Burj Al Arab at 30 minutes. Five educational institutions, including GEMS Founders School – Dubai South, are identified within a 10 km radius.
The starting price for Myra Residences is AED 560,000. The payment plan is structured as 60/40: 10% is due on booking, 50% is payable during construction through the first to third instalments, and 40% is due on handover. Handover is scheduled for Q1 2027. The project completion date is 31 March 2027, which falls within the stated handover quarter. The project start date is 1 November 2025. This payment structure places 60% of the purchase price before handover and the remaining 40% on completion.
Myra Residences is developed by Sikanta Developments. The project has 64 units and a total area of 5,245.40. Its current status is active, with a completion ratio of 13.89%. The development is recorded as one residential building with a G+4+R configuration, and its scheduled completion date is 31 March 2027. Sikanta Developments presents Myra Residences as a Dubai South collection of studio, one-bedroom and two-bedroom homes. The project combines residential apartments with rooftop facilities, landscaped areas, pools, a gym and smart-living systems.
Dubai market as a whole: prices, transactions and trends (DLD data) →
The building is still under construction, so it has no RERA-approved budget yet — that comes after handover. The figures below are what already-completed buildings in the area pay.
Check the charge for a specific building →
Median across 41 completed buildings in Dubai South Residential District for 2026, from the DLD service charge index (Mollak). This is an area benchmark, not this project’s rate: RERA approves that after handover and it may land either side of the median.
We will send floor plans, the payment plan and available units for this project.
Project data comes from the Dubai Land Department (DLD) registry.
Machine-readable mirrors of this page: Markdown · JSON. They carry the same figures as this page, each with its origin labelled.
How to cite:Myra Residences — Continental Club Property, from Dubai Land Department registry and developer data, 2026-10-06, https://continentalclub.ae/project/myra-residences-dubai-south-residential-district/