Developer: Emaar Properties · Green Gate
Lyvia by Palace is a residential project by Emaar Properties in Green Gate, Dubai, with prices from AED 1 980 000, handover Q3 2029, construction 4.8% complete per the DLD registry, 478 apartments (+3 non-residential units), 463 sold to first buyers per the DLD register (as of 25 Nov 2026).
· DLD data as of 25 Nov
| Type | Units | Typical size, sq.ft |
|---|---|---|
| 1 Bedroom | 230 | 756–914 |
| 2 Bedroom | 191 | 1 144–1 241 |
| 3 Bedroom | 57 | 1 835–3 239 |
| Other units | 3 | 6 672–12 423 |
Size range excludes the smallest and largest 5% of units of each type.
All units are freehold. Data from the DLD registry.
Balcony or terrace per the DLD registry: almost every residential unit (100%). Typical balcony size: 1 Bedroom — ~89 sq.ft (8.3 m²); 2 Bedroom — ~86 sq.ft (8.0 m²); 3 Bedroom — ~364 sq.ft (34 m²). Median of registered units; for villas and townhouses the registry includes terraces and open areas.
≈15 of 478 apartments available
Sold to first buyers 463 (97%)Available ≈15
| Type | Total | Sold | Available |
|---|---|---|---|
| 1 bedroom | 230 | 229 | 1 |
| 2 bedrooms | 191 | 180 | 11 |
| 3 bedrooms | 57 | 54 | 3 |
| Total | 478 | 463 | 15 |
Sales data comes from the official Dubai Land Department (DLD) register. Please confirm actual availability with our sales team — leave a request.
Tap an apartment type in the table to add it to your request.
“Available” means units without a registered sale; resales are excluded. Non-residential units (3) are not included.
The purchase price is split into these stages.
The exact schedule is confirmed in the sale agreement for the selected unit.
A broker will compare this project with 3 similar ones: prices, handover dates and payment plans.
All Dubai projects handing over in 2029 →
Data from the Dubai Land Department project registry (updated 27.11.2026 05:55).
Pace: 0.81% per month. At this rate 100% falls on 28.12.2035.
The pace is calculated from the past year of inspections. It is an estimate, not a developer commitment. For reference: across 1,175 completed projects the median pace is 2.48% per month and the median build takes 40 months.
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: Emaar Properties · District: Green Gate
Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.
The yearly figure compares the last 12 months with the 12 before them: calendar years would not work, the current one is unfinished. The district moved 0% over the same period, so the building matched it.
| Type | Size, m² | Price, AED | Per m² | Deals |
|---|---|---|---|---|
| 1 bedroom | 72 | 2 113 888 | 29 360 | 229 |
| 2 bedrooms | 106 | 3 112 888 | 29 367 | 180 |
| 3 bedrooms | 171 | 4 380 888 | 25 619 | 55 |
Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.
Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 10.09.2026 | 3 BR | 170.5 | 4 420 888 |
| 13.07.2026 | 2 BR | 106.3 | 3 141 888 |
| 16.06.2026 | 1 BR | 84.9 | 2 414 888 |
| 11.06.2026 | 1 BR | 84.9 | 2 341 332 |
| 15.05.2026 | 3 BR | 170.5 | 4 499 888 |
| 20.04.2026 | 2 BR | 106.3 | 2 951 888 |
| 17.04.2026 | 3 BR | 300.8 | 6 765 888 |
| 15.04.2026 | 3 BR | 301.0 | 6 766 888 |
| 09.04.2026 | 1 BR | 70.1 | 1 992 888 |
| 02.04.2026 | 1 BR | 84.9 | 2 494 888 |
| 02.04.2026 | 2 BR | 115.3 | 2 995 888 |
| 01.04.2026 | 2 BR | 106.3 | 2 951 888 |
| 31.03.2026 | 2 BR | 106.3 | 2 887 950 |
| 31.03.2026 | 2 BR | 106.3 | 3 062 390 |
| 30.03.2026 | 2 BR | 106.3 | 3 170 888 |
| 30.03.2026 | 2 BR | 106.3 | 2 934 888 |
| 26.03.2026 | 2 BR | 106.3 | 2 940 888 |
| 18.03.2026 | 2 BR | 106.3 | 2 887 950 |
| 18.03.2026 | 2 BR | 112.1 | 3 079 888 |
| 18.03.2026 | 1 BR | 84.9 | 2 419 888 |
| 18.03.2026 | 2 BR | 106.3 | 2 974 888 |
| 18.03.2026 | 2 BR | 106.3 | 2 940 888 |
| 11.03.2026 | 2 BR | 106.3 | 2 963 888 |
| 11.03.2026 | 2 BR | 115.3 | 3 070 888 |
| 10.03.2026 | 3 BR | 170.5 | 4 182 888 |
| 23.02.2026 | 3 BR | 170.5 | 4 174 888 |
| 23.02.2026 | 2 BR | 106.3 | 3 055 888 |
| 23.02.2026 | 2 BR | 106.3 | 2 997 888 |
| 23.02.2026 | 1 BR | 84.9 | 2 410 888 |
| 18.02.2026 | 2 BR | 115.3 | 3 156 888 |
| 09.02.2026 | 1 BR | 84.9 | 2 424 888 |
| 09.02.2026 | 2 BR | 106.3 | 3 193 888 |
| 04.02.2026 | 1 BR | 84.9 | 2 405 888 |
| 04.02.2026 | 2 BR | 106.3 | 2 957 888 |
| 04.02.2026 | 2 BR | 112.1 | 3 091 888 |
| 04.02.2026 | 2 BR | 115.3 | 3 225 888 |
| 03.02.2026 | 2 BR | 115.3 | 3 006 888 |
| 03.02.2026 | 2 BR | 115.3 | 3 254 888 |
| 03.02.2026 | 2 BR | 106.3 | 3 130 888 |
| 03.02.2026 | 2 BR | 112.1 | 3 265 888 |
| 03.02.2026 | 1 BR | 70.2 | 2 115 888 |
| 03.02.2026 | 1 BR | 70.1 | 1 987 888 |
| 03.02.2026 | 1 BR | 70.7 | 1 981 888 |
| 30.01.2026 | 2 BR | 115.3 | 3 023 888 |
| 29.01.2026 | 1 BR | 70.7 | 1 989 888 |
| 29.01.2026 | 1 BR | 72.0 | 2 017 888 |
| 27.01.2026 | 2 BR | 106.3 | 2 969 888 |
| 23.01.2026 | 2 BR | 115.3 | 3 243 888 |
| 23.01.2026 | 1 BR | 73.0 | 2 073 888 |
| 23.01.2026 | 3 BR | 301.0 | 6 766 888 |
Dubai Land Department transaction registry, updated 26.11.2026. Explore Dubai property transactions →
For UAE residents the down payment starts at 20% with terms up to 25 years. Indicative monthly payment for prices from 1 980 000 AED is 8 361 AED.
Estimates only; not a bank approval.


Boniface Anyange
Broker · Continental Club Property · RERA ORN 31933
Answers questions about Lyvia by Palace: current availability, payment plan, DLD registration. English and Russian.
We will send floor plans, the payment plan and available units for this project.
Project data comes from the Dubai Land Department (DLD) registry.
Every figure carries its origin: “DLD registry” is taken from the Dubai Land Department register, “Developer supplied” is stated by the developer, “Our calculation” is computed by us from the first two. Developer prices change without notice — confirm before you commit. Methodology
Lyvia by Palace is a Palace-branded residential development by Emaar Properties in Green Gate, Dubai Creek Harbour. The project is active, with a reported completion ratio of 4.77%, and handover is scheduled for Q3 2029. It comprises one building with 478 apartments (+3 non-residential units), including 478 residential units.
Lyvia by Palace is planned as a residential building in Green Gate, a sub-community within Dubai Creek Harbour. The building configuration includes a basement, ground floor, two podium levels and 47 further floors. The development has 478 apartments (+3 non-residential units), while 478 are identified as residential units. It is presented as a Palace-branded residence, with a waterfront setting in Dubai Creek Harbour. Planned outlooks include the creek, the city skyline and the golf course. The project’s scheduled completion date is 31 July 2029, which falls within the stated Q3 2029 handover period.
The residential offering includes one-, two- and three-bedroom apartments. The homes are positioned within the Green Gate district of Dubai Creek Harbour and are associated with views of the creek, city skyline and golf course. The project has 478 residential units within a total count of 478 apartments (+3 non-residential units). A starting price of AED 1.98 million is stated for Lyvia by Palace. Buyers considering the available layouts can compare one-, two- and three-bedroom apartment configurations within this single-building development. The project is scheduled to hand over in Q3 2029.
The planned facilities include Green Gate Park, Central Plaza and Landscaped Links, together with green zen spaces and an event lawn. Active amenities include multi-sport courts, a football field, running track, skate park, climbing wall, table tennis and badminton facilities. A yoga deck is also included. Family-focused facilities comprise a kids’ pool and play area. Lawn and barbecue areas, an outdoor cinema, and retail and food-and-beverage spaces form part of the amenity programme. These facilities place sports, open spaces, children’s recreation and outdoor gathering areas within the Green Gate setting.
Lyvia by Palace is located in Green Gate, Dubai Creek Harbour. Dubai Downtown is stated to be 10 minutes away, while Dubai International Airport is stated to be 15 minutes away and Al Maktoum International Airport 40 minutes away. Creek Island Central Park and Creekside Park Dubai Creek Harbour are each listed at 1.4 km. Al Badia Golf Club is listed at 1.2 km, and Imagine at Dubai Festival City at 2.0 km. Other nearby destinations include Jameel Arts Centre at 3.3 km, Ras Al Khor Wildlife Sanctuary at 3.8 km and Dubai Creek Golf & Yacht Club at 5.0 km.
Lyvia by Palace is offered on an 80/20 payment plan. The payment structure begins with a 10% down payment on booking. A further 70% is payable during construction across the first to seventh instalments, with the final 20% due on handover. The stated handover period is Q3 2029, and the scheduled completion date is 31 July 2029. The project began on 7 November 2025 and is active, with a reported completion ratio of 4.77%. This gives buyers a payment structure tied to booking, the construction period and project completion.
Lyvia by Palace is developed by Emaar Properties. Emaar Properties was founded in 1997. The project combines the Emaar Properties developer name with Palace branding and is located in Green Gate at Dubai Creek Harbour. Its planned residential collection comprises one-, two- and three-bedroom apartments, supported by sports facilities, outdoor recreation areas, retail and food-and-beverage spaces. The project is a single-building development with 478 apartments (+3 non-residential units) and 478 residential units, with handover scheduled for Q3 2029.
Compare with other projects under construction: new off-plan launches in Dubai — completion data from the DLD register, prices and handover dates.
Dubai market as a whole: prices, transactions and trends (DLD data) →
The building is still under construction, so it has no RERA-approved budget yet — that comes after handover. The figures below are what already-completed buildings in the area pay.
Check the charge for a specific building →
Median across 19 completed buildings in Green Gate for 2026, from the DLD service charge index (Mollak). This is an area benchmark, not this project’s rate: RERA approves that after handover and it may land either side of the median.
Based on 50 registered DLD sales in Lyvia by Palace between 23 Jan 2026 and 10 Sep 2026: median 27 957 AED/m² (2 597 AED/sq ft); half of the deals fell between 27 223 and 28 426 AED/m². This is transaction statistics, not a valuation of a specific unit: floor, view, finish and condition move the price.
| Type | Indicative price | Deals | Median AED/m² | Median area, m² |
|---|---|---|---|---|
| 1 BR | AED 2 241 000 | 14 | 28 407 | 78.9 |
| 2 BR | AED 2 958 000 | 29 | 27 831 | 106.3 |
| 3 BR | AED 4 175 000 | 7 | 24 486 | 170.5 |
Source: Dubai Land Department open data, the latest up to 50 sales in the building; areas as registered; refreshed daily. Deals outside 3,000–200,000 AED/m² are excluded.
PDF shortlist · updated 1 November 2026
Dubai new projects AED 1–2 million
30 projects · prices from DLD and developers
Luminous Coastal Living Dubai Islands · 1–3 BR
from AED 1,622,000
Vedaire Residences Nad Al Sheba 1 · 1–2 BR
from AED 1,363,000
Lacina Ghaf Woods · 1–3 BR
from AED 1,366,000
27 more in the PDF: prices, handover dates, payment plans
The PDF opens instantly. Refreshed monthly from DLD data.
463 of 478 apartments have been sold to first buyers per the DLD register. DLD registrations, including resales: 464 (since 2025). We compare your unit with sales of the same layout here, not with asking prices. Free, reply within 24 hours.