Developer: Deyaar · Dubai Production City
Ember At Park Five is a residential project by Deyaar in Dubai Production City, Dubai, with prices from AED 966 000, handover Q2 2027, construction 18.2% complete per the DLD registry, 200 apartments (+5 non-residential units), 196 sold to first buyers per the DLD register (as of 13 Nov 2026).
| Type | Units | Typical size, sq.ft |
|---|---|---|
| Studio | 11 | 432–433 |
| 1 Bedroom | 116 | 687–828 |
| 2 Bedroom | 53 | 1 149–1 410 |
| 3 Bedroom | 20 | 1 777–1 838 |
| Other units | 5 | 1 304–1 860 |
Size range excludes the smallest and largest 5% of units of each type.
All units are freehold. Data from the DLD registry.
Balcony or terrace per the DLD registry: almost every residential unit (100%). Typical size: Studio — ~83 sq.ft (7.7 m²); 1 Bedroom — ~110 sq.ft (10 m²); 2 Bedroom — ~168 sq.ft (16 m²); 3 Bedroom — ~376 sq.ft (35 m²). Median of registered units; for villas and townhouses the registry includes terraces and open areas.
fewer than 10 of 200 apartments available
Sold to first buyers 196 (98%)Available fewer than 10
| Type | Total | Sold | Available |
|---|---|---|---|
| Studios | 11 | 10 | 1 |
| 1 bedroom | 116 | 115 | 1 |
| 2 bedrooms | 53 | 53 | 0 |
| 3 bedrooms | 20 | 18 | 2 |
| Total | 200 | 196 | 4 |
Sales data comes from the official Dubai Land Department (DLD) register. Please confirm actual availability with our sales team — leave a request.
Tap an apartment type in the table to add it to your request.
“Available” means units without a registered sale; resales are excluded. Non-residential units (5) are not included.
Source: Dubai Land Department registrations (include off-plan resales). Ask us for current availability.
The purchase price is split into these stages.
The exact schedule is confirmed in the sale agreement for the selected unit.
Price, handover, payment plan and DLD deals side by side with the 3 closest projects — one table, no sign-up.
All Dubai projects handing over in 2027 →
Data from the Dubai Land Department project registry (updated 16.11.2026 05:55).
Pace: 1.83% per month. At this rate 100% falls on 07.06.2030.
The pace is calculated from the past year of inspections. It is an estimate, not a developer commitment. For reference: across 1,175 completed projects the median pace is 2.48% per month and the median build takes 40 months.
27 more photos in the DLD register
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: Deyaar · District: Dubai Production City
Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.
The yearly figure compares the last 12 months with the 12 before them: calendar years would not work, the current one is unfinished. The district moved +4% over the same period, so the building grew faster.
| Type | Size, m² | Price, AED | Per m² | Deals |
|---|---|---|---|---|
| Studio | 40 | 686 109 | 17 153 | 10 |
| 1 bedroom | 75 | 1 069 370 | 14 258 | 115 |
| 2 bedrooms | 113 | 1 436 374 | 12 711 | 54 |
| 3 bedrooms | 170 | 2 371 662 | 13 951 | 18 |
Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.
Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 07.09.2026 | 3 BR | 190.0 | 2 342 518 |
| 07.09.2026 | 3 BR | 165.1 | 2 379 469 |
| 07.09.2026 | 3 BR | 165.1 | 2 262 031 |
| 02.09.2026 | 3 BR | 165.1 | 2 370 655 |
| 02.09.2026 | 1 BR | 76.7 | 1 120 722 |
| 02.09.2026 | 3 BR | 165.1 | 2 344 070 |
| 02.09.2026 | 3 BR | 165.1 | 2 361 793 |
| 12.08.2026 | 2 BR | 131.0 | 1 572 363 |
| 18.06.2026 | 1 BR | 75.9 | 1 176 068 |
| 17.06.2026 | 3 BR | 165.1 | 2 255 574 |
| 12.05.2026 | 1 BR | 64.0 | 932 371 |
| 11.05.2026 | 1 BR | 75.2 | 1 056 204 |
| 11.05.2026 | 1 BR | 76.6 | 1 075 173 |
| 20.04.2026 | 1 BR | 63.8 | 943 323 |
| 16.04.2026 | 1 BR | 75.5 | 1 171 502 |
| 16.04.2026 | 3 BR | 169.7 | 2 365 016 |
| 10.04.2026 | 3 BR | 169.7 | 2 378 309 |
| 10.04.2026 | 1 BR | 63.8 | 1 001 757 |
| 09.04.2026 | 1 BR | 75.2 | 1 178 351 |
| 08.04.2026 | 1 BR | 75.5 | 1 060 220 |
| 07.04.2026 | 1 BR | 63.8 | 992 625 |
| 02.04.2026 | 1 BR | 75.2 | 1 167 283 |
| 30.03.2026 | 1 BR | 76.6 | 1 180 296 |
| 26.03.2026 | 1 BR | 78.1 | 1 124 943 |
| 26.03.2026 | 1 BR | 87.6 | 1 154 898 |
| 25.03.2026 | 1 BR | 75.9 | 1 066 594 |
| 24.03.2026 | 3 BR | 169.7 | 2 427 049 |
| 24.03.2026 | 1 BR | 75.2 | 1 176 405 |
| 24.03.2026 | 1 BR | 76.6 | 1 088 339 |
| 24.03.2026 | 1 BR | 81.3 | 1 039 320 |
| 24.03.2026 | 1 BR | 76.7 | 1 193 691 |
| 24.03.2026 | 3 BR | 165.1 | 2 352 931 |
| 17.03.2026 | 1 BR | 87.4 | 1 151 789 |
| 16.03.2026 | 1 BR | 63.8 | 966 149 |
| 09.03.2026 | 1 BR | 75.9 | 1 194 688 |
| 09.03.2026 | 1 BR | 75.9 | 1 092 839 |
| 24.02.2026 | 1 BR | 75.9 | 1 185 378 |
| 24.02.2026 | 1 BR | 75.2 | 1 187 662 |
| 24.02.2026 | 1 BR | 77.5 | 1 120 374 |
| 13.02.2026 | 1 BR | 76.6 | 1 089 962 |
| 13.02.2026 | 1 BR | 75.9 | 1 079 546 |
| 13.02.2026 | 1 BR | 76.6 | 1 081 756 |
| 13.02.2026 | 3 BR | 169.7 | 2 418 187 |
| 10.02.2026 | 1 BR | 75.2 | 1 028 100 |
| 10.02.2026 | 1 BR | 76.7 | 1 043 475 |
| 10.02.2026 | 1 BR | 75.5 | 1 180 724 |
| 10.02.2026 | 1 BR | 76.7 | 1 122 766 |
| 10.02.2026 | 3 BR | 169.7 | 2 384 955 |
| 10.02.2026 | 1 BR | 75.9 | 1 185 736 |
| 10.02.2026 | 1 BR | 75.2 | 1 093 508 |
Dubai Land Department transaction registry, updated 16.11.2026. Explore Dubai property transactions →
For UAE residents the down payment starts at 20% with terms up to 25 years. Indicative monthly payment for prices from 966 000 AED is 4 079 AED.
Estimates only; not a bank approval.


Vladimir Malin
Senior Broker · Continental Club Property · RERA ORN 31933
Answers questions about Ember At Park Five: current availability, payment plan, DLD registration. English and Russian.
We will send floor plans, the payment plan and available units for this project.
Project data comes from the Dubai Land Department (DLD) registry.
Every figure carries its origin: “DLD registry” is taken from the Dubai Land Department register, “Developer supplied” is stated by the developer, “Our calculation” is computed by us from the first two. Developer prices change without notice — confirm before you commit. Methodology
Ember At Park Five is a 200-apartment residential project by Deyaar Development in Dubai Production City. The development comprises one tower configured as basement, ground, podium, 11 residential floors and a roof level. It is active, with construction recorded at 13.43% completion following an inspection dated 29 June 2026, and completion scheduled for 1 June 2027.
Ember At Park Five is planned as a single residential building in Dubai Production City, within Me’Aisem First. The tower configuration comprises a basement level, ground floor, podium level, 11 upper floors and a roof level. Its 200 apartments (+5 non-residential units) are contained within this one-building scheme. Communal facilities are distributed between the podium and roof, combining indoor leisure space, outdoor recreation areas and landscaped elements. The project began on 1 April 2025 and has a scheduled completion date of 1 June 2027. As of the latest recorded inspection on 29 June 2026, it was classified as active and had reached 13.43% completion.
The development has 200 apartments (+5 non-residential units) in total. Ember At Park Five is a residential tower rather than a multi-building community, with all homes and shared facilities incorporated into the B+G+P+11+R structure. The podium floors include several of the project’s leisure and family-oriented areas, while the roof incorporates a green lawn. The project occupies a recorded total area of 19,010.44 square metres. Its location in Dubai Production City places it within a mixed-use district containing residential towers in its eastern section and warehouse and office buildings in its western section.
The amenity programme includes a fully equipped cinema room and gym. Residents will have access to a swimming pool, a separate children’s swimming pool and plunge pools. Outdoor facilities include a landscaped barbecue area, a children’s play area and a sand pit play area at the podium level. A sand sports area provides spaces for volleyball, football and basketball hoop activities. The roof level is planned with a green lawn. These shared facilities are part of the single-tower development, with the podium and roof used for outdoor and recreation-focused spaces.
Ember At Park Five is located in Dubai Production City, a mixed-use district in the wider DubaiLand corridor. The district sits at the junction of Sheikh Mohammed Bin Zayed Road and Al Khail Road. Its western side contains warehouses and offices, while its eastern side includes residential high-rises and associated amenities. Lakes and a running track form central elements of the district’s masterplan. City Centre Me’aisem serves as a local retail destination, with a large supermarket alongside convenience outlets and service providers. Dubai Production City also includes a five-star hotel that opened in 2017.
Road connections are a defining feature of Dubai Production City due to its position beside Sheikh Mohammed Bin Zayed Road and Al Khail Road. The nearest recorded Red Line reference point, station code R73, is 3,245 metres from the district. Typical off-peak driving times from Dubai Production City are 25 minutes to Dubai Mall, 19 minutes to Palm Jumeirah, 21 minutes to Burj Al Arab, 22 minutes to The Walk at JBR, 41 minutes to Dubai International Airport and 33 minutes to Al Maktoum International Airport. There is no metro service running through Dubai Production City.
Construction at Ember At Park Five started on 1 April 2025. The project is active, and the latest inspection dated 29 June 2026 recorded a completion ratio of 13.43%. The scheduled completion date is 1 June 2027. The development is identified under project number 3344. It consists of one building and 200 apartments (+5 non-residential units), with the cinema room, gym, pools, barbecue area, children’s facilities, sand sports area and roof lawn included in the planned shared amenity provision.
Deyaar Development is the developer of Ember At Park Five. The company is developing the project as a single 200-apartment residential tower in Dubai Production City. The scheme’s planned configuration of basement, ground, podium, 11 floors and roof incorporates communal leisure, fitness, pool and outdoor recreation facilities. The project commenced in April 2025 and is scheduled for completion in June 2027.
Resale prices in this area: Dubai Production City Apartments: Resale Market Report H1 2026 — 344 DLD resale deals, median AED 1,009/sq ft.
Dubai market as a whole: prices, transactions and trends (DLD data) →
Based on 50 registered DLD sales in Ember At Park Five between 10 Feb 2026 and 7 Sep 2026: median 14 330 AED/m² (1 331 AED/sq ft); half of the deals fell between 14 044 and 15 478 AED/m². This is transaction statistics, not a valuation of a specific unit: floor, view, finish and condition move the price.
| Type | Indicative price | Deals | Median AED/m² | Median area, m² |
|---|---|---|---|---|
| 1 BR | AED 1 107 000 | 36 | 14 591 | 75.9 |
| 3 BR | AED 2 344 000 | 13 | 14 196 | 165.1 |
Source: Dubai Land Department open data, the latest up to 50 sales in the building; areas as registered; refreshed daily. Deals outside 3,000–200,000 AED/m² are excluded.
PDF shortlist · updated 1 November 2026
Dubai Production City: new projects and prices
25 projects · prices from DLD and developers
Eden 2 by Meraki Dubai Production City
from AED 500,000
Samana Lake Views Dubai Production City · Studio, 1–2 BR
from AED 577,000
Binghatti Elite Dubai Production City · Studio, 1 BR
from AED 600,000
22 more in the PDF: prices, handover dates, payment plans
The PDF opens instantly. Refreshed monthly from DLD data.
196 of 200 apartments have been sold to first buyers per the DLD register. DLD registrations, including resales: 198 (since 2025). We compare your unit with sales of the same layout here, not with asking prices. Free, reply within 24 hours.
Machine-readable mirrors of this page: Markdown · JSON. They carry the same figures as this page, each with its origin labelled.
How to cite:Ember At Park Five — Continental Club Property, from Dubai Land Department registry and developer data, 2026-10-17, https://continentalclub.ae/project/ember-at-park-five-dubai-production-city/