Developer: Deyaar Development · Dubai Production City
Ember At Park Five is a residential project by Deyaar in Dubai Production City, Dubai, with handover 01.06.2027, construction 13.4% complete per the DLD registry.
Data from the Dubai Land Department project registry (updated 14.08.2026 09:55).
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: Deyaar · District: Dubai Production City
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 12.08.2026 | 2 BR | 131.0 | 1 572 363 |
| 14.07.2026 | 2 BR | 53.4 | 675 066 |
| 18.06.2026 | 1 BR | 75.9 | 1 176 068 |
| 17.06.2026 | 3 BR | 165.1 | 2 255 574 |
| 12.05.2026 | 1 BR | 64.0 | 932 371 |
| 11.05.2026 | 1 BR | 75.2 | 1 056 204 |
| 11.05.2026 | 1 BR | 76.6 | 1 075 173 |
| 20.04.2026 | 1 BR | 63.8 | 943 323 |
| 16.04.2026 | 3 BR | 169.7 | 2 365 016 |
| 16.04.2026 | 1 BR | 75.5 | 1 171 502 |
| 10.04.2026 | 3 BR | 169.7 | 2 378 309 |
| 10.04.2026 | 1 BR | 63.8 | 1 001 757 |
| 09.04.2026 | 1 BR | 75.2 | 1 178 351 |
| 08.04.2026 | 1 BR | 75.5 | 1 060 220 |
| 07.04.2026 | 1 BR | 63.8 | 992 625 |
| 02.04.2026 | 1 BR | 75.2 | 1 167 283 |
| 30.03.2026 | 1 BR | 76.6 | 1 180 296 |
| 26.03.2026 | 1 BR | 87.6 | 1 154 898 |
| 26.03.2026 | 1 BR | 78.1 | 1 124 943 |
| 25.03.2026 | 1 BR | 75.9 | 1 066 594 |
Dubai Land Department transaction registry, updated 2026-08-13. Explore Dubai property transactions →
Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.
The yearly figure compares the last 12 months with the 12 before them: calendar years would not work, the current one is unfinished. The district moved +9% over the same period, so the building matched it.
| Type | Size, m² | Price, AED | Per m² | Deals |
|---|---|---|---|---|
| Studio | 40 | 686 109 | 17 153 | 10 |
| 1 bedroom | 75 | 1 069 370 | 14 258 | 114 |
| 2 bedrooms | 113 | 1 430 075 | 12 656 | 55 |
| 3 bedrooms | 170 | 2 384 955 | 14 029 | 12 |
Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.
Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.

Ember At Park Five is a 205-unit residential project by Deyaar Development in Dubai Production City. The development comprises one tower configured as basement, ground, podium, 11 residential floors and a roof level. It is active, with construction recorded at 13.43% completion following an inspection dated 29 June 2026, and completion scheduled for 1 June 2027.
Ember At Park Five is planned as a single residential building in Dubai Production City, within Me’Aisem First. The tower configuration comprises a basement level, ground floor, podium level, 11 upper floors and a roof level. Its 205 units are contained within this one-building scheme. Communal facilities are distributed between the podium and roof, combining indoor leisure space, outdoor recreation areas and landscaped elements. The project began on 1 April 2025 and has a scheduled completion date of 1 June 2027. As of the latest recorded inspection on 29 June 2026, it was classified as active and had reached 13.43% completion.
The development has 205 units in total. Ember At Park Five is a residential tower rather than a multi-building community, with all homes and shared facilities incorporated into the B+G+P+11+R structure. The podium floors include several of the project’s leisure and family-oriented areas, while the roof incorporates a green lawn. The project occupies a recorded total area of 19,010.44 square metres. Its location in Dubai Production City places it within a mixed-use district containing residential towers in its eastern section and warehouse and office buildings in its western section.
The amenity programme includes a fully equipped cinema room and gym. Residents will have access to a swimming pool, a separate children’s swimming pool and plunge pools. Outdoor facilities include a landscaped barbecue area, a children’s play area and a sand pit play area at the podium level. A sand sports area provides spaces for volleyball, football and basketball hoop activities. The roof level is planned with a green lawn. These shared facilities are part of the single-tower development, with the podium and roof used for outdoor and recreation-focused spaces.
Ember At Park Five is located in Dubai Production City, a mixed-use district in the wider DubaiLand corridor. The district sits at the junction of Sheikh Mohammed Bin Zayed Road and Al Khail Road. Its western side contains warehouses and offices, while its eastern side includes residential high-rises and associated amenities. Lakes and a running track form central elements of the district’s masterplan. City Centre Me’aisem serves as a local retail destination, with a large supermarket alongside convenience outlets and service providers. Dubai Production City also includes a five-star hotel that opened in 2017.
Road connections are a defining feature of Dubai Production City due to its position beside Sheikh Mohammed Bin Zayed Road and Al Khail Road. The nearest recorded Red Line reference point, station code R73, is 3,245 metres from the district. Typical off-peak driving times from Dubai Production City are 25 minutes to Dubai Mall, 19 minutes to Palm Jumeirah, 21 minutes to Burj Al Arab, 22 minutes to The Walk at JBR, 41 minutes to Dubai International Airport and 33 minutes to Al Maktoum International Airport. There is no metro service running through Dubai Production City.
Construction at Ember At Park Five started on 1 April 2025. The project is active, and the latest inspection dated 29 June 2026 recorded a completion ratio of 13.43%. The scheduled completion date is 1 June 2027. The development is identified under project number 3344. It consists of one building and 205 units, with the cinema room, gym, pools, barbecue area, children’s facilities, sand sports area and roof lawn included in the planned shared amenity provision.
Deyaar Development is the developer of Ember At Park Five. The company is developing the project as a single 205-unit residential tower in Dubai Production City. The scheme’s planned configuration of basement, ground, podium, 11 floors and roof incorporates communal leisure, fitness, pool and outdoor recreation facilities. The project commenced in April 2025 and is scheduled for completion in June 2027.
We will send floor plans, the payment plan and available units for this project.
Project data comes from the Dubai Land Department (DLD) registry.