Developer: Damac Properties · Al Wasl

Damac City

Damac City is a residential project by Damac Properties in Al Wasl, Dubai, with prices from AED 1 811 000, planned handover 30.12.2025, construction 72.8% complete per the DLD registry, 511 units, 613 DLD-registered sales since 2022.

Price fromAED 1 811 000Our calculation
Unit types1–5 BR837–9 200 ft²DLD registry
Planned handover30.12.2025DLD registry
Construction72.8%DLD registry · checked 30.09.2026

· price from DLD deals

Prices, floor plans and payment

Layouts and sizes

TypeUnitsTypical size, sq.ft
1 Bedroom205837–839
2 Bedroom2491 230–2 749
3 Bedroom451 982–4 581
4 Bedroom82 860–6 256
5 Bedroom28 984–9 200
Other units2743–1 201

Size range excludes the smallest and largest 5% of units of each type.

All units are freehold. Data from the DLD registry.

Balcony or terrace per the DLD registry: almost every residential unit (100%). Typical size: 1 Bedroom — ~145 sq.ft (14 m²); 2 Bedroom — ~260 sq.ft (24 m²); 3 Bedroom — ~794 sq.ft (74 m²); 4 Bedroom — ~837 sq.ft (78 m²). Median of registered units; for villas and townhouses the registry includes terraces and open areas.

Mortgage for this project

For UAE residents the down payment starts at 20% with terms up to 25 years. Indicative monthly payment for prices from 1 811 000 AED is 7 647 AED.

Calculate mortgage

Estimates only; not a bank approval.

Compare with similar projects

A broker will compare this project with 3 similar ones: prices, handover dates and payment plans.

Compare in WhatsApp

Handover and construction

Dubai Land Department registry and construction progress checks

Handover date & construction progress

72.8%
  • Construction started01.06.2022
  • Planned handover (DLD register)30.12.2025
  • Status date30.09.2026
  • Progress between DLD inspections+4.14% (15.07.2026 → 30.09.2026)
  • Escrow bankEmirates NBD
  • Scale2 bldg
  • DLD project number2374

Data from the Dubai Land Department project registry (updated 24.11.2026 05:55).

Inspection history 13
025507510026.09.202230.09.2026
Actual, per inspections

Pace: 2.93% per month. At this rate 100% falls on 09.07.2027.

The pace is calculated from the past year of inspections. It is an estimate, not a developer commitment. For reference: across 1,175 completed projects the median pace is 2.48% per month and the median build takes 40 months.

Construction progress 120
30.09.2026 72.80%
Damac City, Al Wasl construction progress — 30 September 2026, 72.80% complete, photo 1 of 10Damac City, Al Wasl construction progress — 30 September 2026, 72.80% complete, photo 2 of 10Damac City, Al Wasl construction progress — 30 September 2026, 72.80% complete, photo 3 of 10Damac City, Al Wasl construction progress — 30 September 2026, 72.80% complete, photo 4 of 10Damac City, Al Wasl construction progress — 30 September 2026, 72.80% complete, photo 5 of 10Damac City, Al Wasl construction progress — 30 September 2026, 72.80% complete, photo 6 of 10Damac City, Al Wasl construction progress — 30 September 2026, 72.80% complete, photo 7 of 10Damac City, Al Wasl construction progress — 30 September 2026, 72.80% complete, photo 8 of 10Damac City, Al Wasl construction progress — 30 September 2026, 72.80% complete, photo 9 of 10Damac City, Al Wasl construction progress — 30 September 2026, 72.80% complete, photo 10 of 10
15.07.2026 68.66%
Damac City, Al Wasl construction progress — 15 July 2026, 68.66% complete, photo 1 of 12Damac City, Al Wasl construction progress — 15 July 2026, 68.66% complete, photo 2 of 12Damac City, Al Wasl construction progress — 15 July 2026, 68.66% complete, photo 3 of 12Damac City, Al Wasl construction progress — 15 July 2026, 68.66% complete, photo 4 of 12Damac City, Al Wasl construction progress — 15 July 2026, 68.66% complete, photo 5 of 12Damac City, Al Wasl construction progress — 15 July 2026, 68.66% complete, photo 6 of 12Damac City, Al Wasl construction progress — 15 July 2026, 68.66% complete, photo 7 of 12Damac City, Al Wasl construction progress — 15 July 2026, 68.66% complete, photo 8 of 12Damac City, Al Wasl construction progress — 15 July 2026, 68.66% complete, photo 9 of 12Damac City, Al Wasl construction progress — 15 July 2026, 68.66% complete, photo 10 of 12Damac City, Al Wasl construction progress — 15 July 2026, 68.66% complete, photo 11 of 12Damac City, Al Wasl construction progress — 15 July 2026, 68.66% complete, photo 12 of 12
24.03.2026 58.83%
Damac City, Al Wasl construction progress — 24 March 2026, 58.83% complete, photo 1 of 9Damac City, Al Wasl construction progress — 24 March 2026, 58.83% complete, photo 2 of 9Damac City, Al Wasl construction progress — 24 March 2026, 58.83% complete, photo 3 of 9Damac City, Al Wasl construction progress — 24 March 2026, 58.83% complete, photo 4 of 9Damac City, Al Wasl construction progress — 24 March 2026, 58.83% complete, photo 5 of 9Damac City, Al Wasl construction progress — 24 March 2026, 58.83% complete, photo 6 of 9Damac City, Al Wasl construction progress — 24 March 2026, 58.83% complete, photo 7 of 9Damac City, Al Wasl construction progress — 24 March 2026, 58.83% complete, photo 8 of 9Damac City, Al Wasl construction progress — 24 March 2026, 58.83% complete, photo 9 of 9
15.11.2025 42.06%
Damac City, Al Wasl construction progress — 15 November 2025, 42.06% complete, photo 1 of 5Damac City, Al Wasl construction progress — 15 November 2025, 42.06% complete, photo 2 of 5Damac City, Al Wasl construction progress — 15 November 2025, 42.06% complete, photo 3 of 5Damac City, Al Wasl construction progress — 15 November 2025, 42.06% complete, photo 4 of 5Damac City, Al Wasl construction progress — 15 November 2025, 42.06% complete, photo 5 of 5

84 more photos in the DLD register

Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.

Buying a ready unit: pre-purchase inspection

Damac City is completed. Buying a ready unit here? Before you pay the deposit we check 110 points: finishes, plumbing, electrics and A/C, with a photo report within 24 hours. Fixed price from 749 AED.

Snagging inspection: prices and scope

Demand and transaction prices

Registered DLD transactions only — not listings

Registered transactions in Damac City

Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.

613deals since 2022
24 223AED per m², median
0%resale, the rest bought from the developer
+1%over the past year

The yearly figure compares the last 12 months with the 12 before them: calendar years would not work, the current one is unfinished. The district moved +1% over the same period, so the building matched it.

What buyers actually paid

TypeSize, m²Price, AEDPer m²Deals
1 bedroom781 873 00024 013263
2 bedrooms1173 082 00026 342295
3 bedrooms1975 482 12027 82850

Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.

How the price per square metre moved

From 2022 to 2025 — +5% on the price per square metre in this building. The district moved +50% over the same period, so the building lagged the market.

23 9052022——
26 1052023——
22 2852024——
25 1742025——
24 0282026*——

Top to bottom: purchase price per m², year, annual rent per m², gross yield.

All figures are medians. Years with fewer than eight deals are skipped; rent is shown where there are at least twenty contracts. The yield is gross — service charges are not published in the register.

* 2026 is still in progress and its bar covers part of the year. The growth figure above uses completed years.

Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.

Recent transactions

DateTypeSize, m²Price, AED
12.10.20261 BR77.91 811 000
12.10.20261 BR78.01 873 000
09.10.20261 BR108.42 896 320
01.09.20263 BR196.95 369 000
09.06.20261 BR77.92 303 000
08.06.20261 BR78.01 839 000
18.05.20261 BR77.92 320 000
18.05.20262 BR158.34 592 000
14.05.20262 BR201.74 555 240
14.05.20261 BR77.92 141 790
14.05.20262 BR148.54 273 000
05.05.20261 BR77.92 233 910
04.05.20261 BR78.01 873 000
28.04.20261 BR78.02 722 790
20.04.20262 BR256.49 714 740
15.04.20261 BR77.92 303 000
09.04.20262 BR229.16 682 560
07.04.20262 BR237.26 737 280
30.03.20262 BR144.03 284 498
30.03.20262 BR315.411 100 000
27.03.20262 BR183.64 122 338
27.03.20261 BR78.01 873 000
27.03.20262 BR169.73 757 372
27.03.20262 BR181.14 088 356
27.03.20261 BR78.01 873 000
27.03.20261 BR78.01 873 000
27.03.20262 BR203.44 368 184
27.03.20262 BR199.24 266 000
27.03.20261 BR77.91 812 000
27.03.20261 BR78.01 873 000
27.03.20261 BR77.91 811 000
27.03.20261 BR77.91 811 000
27.03.20261 BR77.91 811 000
27.03.20261 BR78.01 873 000
27.03.20262 BR165.43 897 000
27.03.20262 BR134.13 162 000
09.03.20261 BR77.91 856 000
05.03.20263 BR449.118 256 735
02.03.20262 BR166.94 183 000
18.02.20264 BR265.77 894 000
10.02.20262 BR158.34 227 000
04.02.20262 BR114.32 900 000
27.01.20262 BR94.62 571 500
12.01.20261 BR77.91 700 000
18.12.20252 BR256.29 966 600
17.12.20252 BR166.94 183 000
08.12.20253 BR449.017 336 130
05.11.20251 BR78.01 839 000
30.10.20252 BR157.74 304 000
29.10.20252 BR115.22 600 000

Dubai Land Department transaction registry, updated 24.11.2026. Explore Dubai property transactions →

Estimate a unit in this building from DLD sales

Building median

24 028 AED/m²

2 232 AED/sq ft

half of the deals 23 259 – 28 748 AED/m²

50 DLD sales from 29 Oct 2025 to 12 Oct 2026

This is transaction statistics, not a valuation of a specific unit: floor, view, finish and condition move the price.

Estimate your unit

Indicative figure from DLD sales:
AED 1 872 000
range AED 1 825 000 – 2 111 000, based on 23 deals
Get an exact valuation from a broker

Source: Dubai Land Department open data, the latest up to 50 sales in the building; areas as registered; refreshed daily. Deals outside 3,000–200,000 AED/m² are excluded.

Building and neighbourhood

Amenities

  • Shared Pool
  • Shared Gym
  • Shared Spa
  • Security
  • Covered Parking
  • Lobby in Building
  • Children's Play Area
  • Children's Pool
  • Barbecue Area
  • Concierge
Damac City

Ask about this project

Availability, prices and payment plan — answered by the project broker

Your broker for this project

Olesia Kotova

Olesia Kotova

Broker · Continental Club Property · RERA ORN 31933

Answers questions about Damac City: current availability, payment plan, DLD registration. English and Russian.

PDF shortlist · updated 1 November 2026

Al Wasl: new projects and prices

11 projects · prices from DLD and developers

  1. City Walk Northline 2 City Walk Northline 2 Al Wasl · 1–3 BR from AED 1,077,000
  2. Damac City 2 Damac City 2 Al Wasl · Studio, 1–4 BR from AED 1,266,000
  3. Safa One de Grisogno Safa One de Grisogno Al Wasl from AED 1,620,000

8 more in the PDF: prices, handover dates, payment plans

The PDF opens instantly. Refreshed monthly from DLD data.

Get the presentation and prices

We will send floor plans, the payment plan and available units for this project.

By submitting the form you agree to the processing of your contact details, including for advertising analytics.

Project data comes from the Dubai Land Department (DLD) registry.

Every figure carries its origin: “DLD registry” is taken from the Dubai Land Department register, “Developer supplied” is stated by the developer, “Our calculation” is computed by us from the first two. Developer prices change without notice — confirm before you commit. Methodology

About the project

About the project

Damac City is a residential development by J A Parks in Al Wasl, Dubai. The project comprises two towers and 511 units across a reported total area of 70,342.70. It is active, with a reported construction completion ratio of 68.66%.

Project configuration

Damac City consists of two residential towers. Tower A is configured as G+4P+57, while Tower B is configured as G+4P+40. Together, the development contains 511 units. The reported total project area is 70,342.70. The project started on 1 June 2022, and its stated completion date is 30 December 2025. Its status is recorded as Active.

Structure and building form

The two towers are designed with a concrete structure and blockwork, with internal and external finishes. Tower A has a ground level, four parking levels and 57 further levels in its recorded configuration. Tower B has a ground level, four parking levels and 40 further levels. The development is classified as residential, with both towers forming a single 511-unit project in Al Wasl.

Construction status

Damac City has a reported completion ratio of 68.66%. The project is classified as Active. The listed project start date is 1 June 2022 and the stated completion date is 30 December 2025. The latest listed inspection date is 15 July 2026, and the project update is dated 24 July 2026. These project-status details apply to the two-tower development as a whole.

Al Wasl location

Damac City is located in Al Wasl, a district on the west side of Sheikh Zayed Road between Al Safa and Satwa. Al Wasl includes villa streets, retail areas and mixed-use developments, with City Walk, Galleria Mall and Boxpark located within or near the district. The district is 2.3 km by road from Burj Khalifa and Downtown Dubai, 2.8 km from The Dubai Mall, 2.6 km from Business Bay and 2.9 km from DIFC. Dubai International Airport is 12.4 km away by road.

Transport and district connections

The nearest metro access for Al Wasl is on the Red Line, at station code R25, 1,721 m from the district centre. By road, Mall of the Emirates is 11.2 km away, Palm Jumeirah is 15.6 km away and Dubai Marina is 18.1 km away. Within the wider area, City Walk provides retail and residential space, while Galleria Mall is located on Wasl Road and Boxpark forms a retail strip nearby. Al Wasl also has established schools including Al Safa High School, Horizon School, JSS Private School, Al Maktoum Boys School and Al Rays Girls School.

Developer

J A Parks is the developer of Damac City. The development is located in Al Wasl and comprises two residential towers with 511 units. The project began on 1 June 2022 and is listed with a completion date of 30 December 2025. Its reported completion ratio is 68.66%, with the project remaining Active.

Frequent questions

Who is the developer of Damac City?
Damac City is developed by J A Parks.
Where is Damac City located?
Damac City is located in Al Wasl, Dubai, on the west side of Sheikh Zayed Road between Al Safa and Satwa.
How many units are in Damac City?
The development has 511 units across two residential towers.
What is the configuration of the towers at Damac City?
Tower A is configured as G+4P+57, and Tower B is configured as G+4P+40.
What is the completion status of Damac City?
Damac City is Active, with a reported completion ratio of 68.66%.
When is the Damac City handover date?
The planned handover (completion) date of Damac City in the DLD register was 30 December 2025. Construction progress was 72.8% at the DLD inspection of 30 September 2026. The date and progress on this page are updated from the DLD register. For current availability, prices and resale (assignment) options, send an enquiry on this page.
What is near Damac City in Al Wasl?
Al Wasl is close to City Walk, Galleria Mall and Boxpark. Downtown Dubai is 2.3 km away by road, while The Dubai Mall is 2.8 km away.
How can I buy an apartment in Damac City?
Submit an enquiry via the form on this page or message us on WhatsApp — a Continental Club Property broker (RERA 31933) will help you choose a unit and send the brochure and payment plan.

For owners in Damac City

How much is your property in Damac City worth?

DLD has recorded 613 sales in this building since 2022. We compare your unit with sales of the same layout here, not with asking prices. Free, reply within 24 hours.

By submitting the form you agree to the processing of your contact details, including for advertising analytics.

For AI agents and researchers

Machine-readable mirrors of this page: Markdown · JSON. They carry the same figures as this page, each with its origin labelled.

How to cite:Damac City — Continental Club Property, from Dubai Land Department registry and developer data, 2026-10-17, https://continentalclub.ae/project/damac-city-al-wasl/

Where should we send the shortlist?

The PDF downloads right after you submit. A manager gets in touch only if you ask.