Muraba Veil is a residential project by Muraba in Al Wasl, Dubai, with handover 31.12.2028, construction 7.2% complete per the DLD registry.
Payment plan 50/50
- Down payment15%
- During construction35%
- On handover50%
Construction progress
- Handover31.12.2028
- Status date18.06.2026
- DLD project number3106
Data from the Dubai Land Department project registry (updated 13.08.2026 09:55).
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: Muraba · District: Al Wasl
Recent transactions
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 10.07.2026 | 3 BR | 460.1 | 16 266 659 |
| 22.06.2026 | 3 BR | 460.1 | 17 149 254 |
| 22.06.2026 | 2 BR | 356.7 | 12 986 147 |
| 22.06.2026 | 2 BR | 356.7 | 12 986 147 |
| 22.06.2026 | 3 BR | 460.0 | 30 744 792 |
| 06.05.2026 | 4 BR | 921.5 | 42 954 629 |
| 27.04.2026 | 3 BR | 458.9 | 18 715 404 |
| 13.04.2026 | 2 BR | 356.6 | 13 658 036 |
| 13.04.2026 | 3 BR | 458.9 | 30 433 719 |
| 13.02.2026 | 2 BR | 356.6 | 20 554 669 |
| 17.12.2025 | 2 BR | 356.6 | 16 092 142 |
| 16.12.2025 | 3 BR | 458.9 | 18 015 762 |
| 15.12.2025 | 2 BR | 356.6 | 16 633 054 |
| 12.12.2025 | 3 BR | 458.9 | 16 966 301 |
| 24.11.2025 | 3 BR | 458.9 | 20 814 327 |
| 07.10.2025 | 3 BR | 458.9 | 22 913 251 |
| 01.10.2025 | 2 BR | 356.6 | 12 035 299 |
| 01.10.2025 | 3 BR | 458.9 | 16 966 301 |
| 03.09.2025 | 2 BR | 356.6 | 12 305 756 |
| 14.08.2025 | 2 BR | 356.6 | 14 986 912 |
Dubai Land Department transaction registry, updated 2026-08-12. Explore Dubai property transactions →
Places nearby
About the project
Muraba Veil is a residential and commercial tower project in Al Wasl by Muraba Properties, comprising apartments, duplexes and penthouses with two to five bedrooms. The project is active, with construction recorded at 7.16% complete. Completion is scheduled for 31 December 2028, corresponding with a Q4 2028 handover timeline.
The tower and its architecture
Muraba Veil is planned as a 5-basement, ground-floor, one-podium and 72-floor residential and commercial building. The design is by RCR Arquitectes and incorporates a porous stainless-steel mesh façade inspired by mashrabiya. This veil system is designed to provide shading and reflected light across the exterior. The tower is described as 380 metres high and 22.5 metres wide. Its design includes water elements, green garden terraces and desert-inspired landscaping at the base. Residential layouts are planned with rooms facing two directions, outdoor terraces and cross-ventilation. The project is located by Dubai Water Canal along Sheikh Zayed Road in Al Wasl.
Residences and unit collection
The residence collection includes apartments, duplexes and penthouses with two to five bedrooms. The development contains 135 units. The planned layouts extend across the width of the tower and include dual-aspect rooms and outdoor terraces. The two- to five-bedroom range gives buyers a choice of apartment, duplex and penthouse formats within the same project. A five-bedroom penthouse is included in the collection, while apartments and duplexes are offered across the wider two- to five-bedroom range. The project combines residential accommodation with commercial space within the building.
Wellness, leisure and shared spaces
Planned amenities include a swimming pool, gymnasium, spa, cinema, padel court, conference room and gathering areas. The wellness offering includes a sauna, steam room, treatment rooms and experiential pools. A rooftop lounge and rooftop restaurant form part of the dining and social spaces. The project also includes restaurants, retail outlets, a children’s play area and parks and leisure areas. Additional planned settings include meeting spaces, landscaped garden terraces, water features and a desert-inspired base with lounge areas and an amphitheatre. The amenities bring fitness, wellness, dining, recreation and meeting facilities together within the development.
Al Wasl setting and nearby destinations
Muraba Veil is in Al Wasl, a central Dubai district on the west side of Sheikh Zayed Road between Al Safa and Satwa. The district includes villa streets, boutique retail, canal-front projects and mixed-use developments. Safa Park is 0.9 km from Muraba Veil, while Action Park Business Bay is 1.3 km away. Dubai Bowling Center and Bay Avenue Mall & Park are each 1.4 km away, and Boxpark is 1.5 km away. Roxy Cinema at Boxpark is also 1.5 km away. Galleria Mall and its Vox Cinema are on or near Wasl Road, and City Walk is among the retail and leisure destinations serving the surrounding area.
Payment plan and completion timeline
The stated payment plan allocates 75% during construction through instalments and 25% on handover. Muraba Veil started on 1 December 2024 and has a scheduled completion date of 31 December 2028. Handover is scheduled for Q4 2028. Construction status is active, and the recorded completion ratio is 7.16%. The project’s completion information was updated on 22 June 2026, following an inspection dated 18 June 2026. The stated payment structure links the final 25% of the purchase price to completion and handover.
Muraba Properties
Muraba Properties was founded in 2013. Its earlier project, Muraba Residences on Palm Jumeirah East Crescent, comprises 46 units and was designed by RCR Arquitectes. Muraba Veil continues the developer’s collaboration with RCR Arquitectes. The developer’s name is associated with the Muraba Residences project and Muraba Veil in Dubai. Muraba Veil is registered as a 135-unit development in Al Wasl, with Muraba Properties L.L.C. named as developer. The project combines the developer’s residential focus with a building programme that also includes commercial space.
Registered transactions in Muraba Veil
Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.
The yearly figure compares the last 12 months with the 12 before them: calendar years would not work, the current one is unfinished. The district moved +3% over the same period, so the building lagged.
What buyers actually paid
| Type | Size, m² | Price, AED | Per m² | Deals |
|---|---|---|---|---|
| 2 bedrooms | 357 | 13 658 036 | 38 258 | 14 |
| 3 bedrooms | 459 | 20 814 327 | 45 347 | 23 |
Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.
Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.

























