Developer: Al Habtoor Group · Business Bay
Al Habtoor Tower is a residential project by Al Habtoor Group in Business Bay, Dubai, with prices from AED 2 433 000, handover Q4 2026, construction 90% complete per the DLD registry, 1,739 apartments, 1,297 sold to first buyers per the DLD register (as of 13 Nov 2026).
| Type | Units | Typical size, sq.ft |
|---|---|---|
| 1 Bedroom | 1034 | 866–1 277 |
| 2 Bedroom | 554 | 1 411–2 277 |
| 3 Bedroom | 150 | 1 845–4 077 |
| 5 Bedroom | 1 | 9 081 |
Size range excludes the smallest and largest 5% of units of each type.
All units are freehold. Data from the DLD registry.
Balcony or terrace per the DLD registry: almost every residential unit (98%). Typical size: 1 Bedroom — ~135 sq.ft (13 m²); 2 Bedroom — ~138 sq.ft (13 m²); 3 Bedroom — ~149 sq.ft (14 m²). Median of registered units; for villas and townhouses the registry includes terraces and open areas.
AED 2,400,000 · 1 bedroom
≈442 of 1,739 apartments available
Sold to first buyers 1,297 (75%)Available ≈442
| Type | Total | Sold | Available |
|---|---|---|---|
| 1 bedroom | 1,034 | 825 | 209 |
| 2 bedrooms | 554 | 396 | 158 |
| 3 bedrooms | 150 | 76 | 74 |
| 4+ bedrooms | 1 | 0 | 1 |
| Total | 1,739 | 1,297 | 442 |
Sales data comes from the official Dubai Land Department (DLD) register. Please confirm actual availability with our sales team — leave a request.
Tap an apartment type in the table to add it to your request.
“Available” means units without a registered sale; resales are excluded.
Source: Dubai Land Department registrations (include off-plan resales). Ask us for current availability.
The purchase price is split into these stages.
The exact schedule is confirmed in the sale agreement for the selected unit.
Price, handover, payment plan and DLD deals side by side with the 3 closest projects — one table, no sign-up.
All Dubai projects handing over in 2026 →
Data from the Dubai Land Department project registry (updated 16.11.2026 05:55).
Pace: 2.83% per month. At this rate 100% falls on 16.12.2026.
The pace is calculated from the past year of inspections. It is an estimate, not a developer commitment. For reference: across 1,175 completed projects the median pace is 2.48% per month and the median build takes 40 months.
84 more photos in the DLD register
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: Al Habtoor Group · District: Business Bay
Planned handover of Al Habtoor Tower: Q4 2026. Before you sign the handover form we check 110 points, send a photo report within 24 hours and file the defect list with the developer. Fixed price from 749 AED.
Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.
The yearly figure compares the last 12 months with the 12 before them: calendar years would not work, the current one is unfinished. The district moved +3% over the same period, so the building grew faster.
| Type | Size, m² | Price, AED | Per m² | Deals |
|---|---|---|---|---|
| 1 bedroom | 91 | 2 516 461 | 27 653 | 836 |
| 2 bedrooms | 142 | 4 084 532 | 28 764 | 401 |
| 3 bedrooms | 173 | 6 640 893 | 38 387 | 76 |
Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.
From 2023 to 2025 — -5% on the price per square metre in this building. The district moved +20% over the same period, so the building lagged the market.
Top to bottom: purchase price per m², year, annual rent per m², gross yield.
All figures are medians. Years with fewer than eight deals are skipped; rent is shown where there are at least twenty contracts. The yield is gross — service charges are not published in the register.
* 2026 is still in progress and its bar covers part of the year. The growth figure above uses completed years.
Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 13.11.2026 | 3 BR | 212.1 | 5 636 468 |
| 13.11.2026 | 2 BR | 179.4 | 4 950 889 |
| 05.11.2026 | 1 BR | 90.9 | 3 236 068 |
| 05.11.2026 | 2 BR | 140.7 | 5 303 183 |
| 02.11.2026 | 2 BR | 136.2 | 4 108 023 |
| 28.10.2026 | 1 BR | 93.1 | 2 000 000 |
| 23.10.2026 | 1 BR | 97.0 | 3 086 659 |
| 07.10.2026 | 1 BR | 93.0 | 2 420 000 |
| 21.09.2026 | 2 BR | 134.2 | 3 788 854 |
| 18.09.2026 | 1 BR | 93.0 | 2 835 838 |
| 17.09.2026 | 2 BR | 188.0 | 4 926 355 |
| 08.09.2026 | 2 BR | 143.7 | 3 614 866 |
| 20.08.2026 | 1 BR | 93.3 | 2 870 774 |
| 18.08.2026 | 2 BR | 136.0 | 3 858 509 |
| 18.08.2026 | 2 BR | 136.2 | 3 938 795 |
| 04.08.2026 | 2 BR | 187.3 | 4 896 014 |
| 04.08.2026 | 1 BR | 94.7 | 2 356 727 |
| 30.07.2026 | 1 BR | 88.3 | 2 270 992 |
| 24.07.2026 | 2 BR | 131.5 | 4 348 551 |
| 23.07.2026 | 2 BR | 125.5 | 2 770 486 |
| 23.07.2026 | 3 BR | 212.1 | 5 215 618 |
| 23.07.2026 | 3 BR | 212.1 | 5 243 226 |
| 23.07.2026 | 3 BR | 212.1 | 5 270 834 |
| 23.07.2026 | 1 BR | 81.1 | 2 650 412 |
| 23.07.2026 | 1 BR | 105.7 | 3 635 139 |
| 23.07.2026 | 1 BR | 81.1 | 2 191 234 |
| 14.07.2026 | 1 BR | 89.5 | 2 610 809 |
| 06.07.2026 | 1 BR | 93.1 | 2 000 000 |
| 30.06.2026 | 1 BR | 104.8 | 1 132 683 |
| 29.06.2026 | 2 BR | 136.0 | 3 954 572 |
| 24.06.2026 | 1 BR | 97.0 | 2 968 914 |
| 11.06.2026 | 3 BR | 212.1 | 6 344 873 |
| 11.06.2026 | 1 BR | 97.0 | 2 979 405 |
| 11.06.2026 | 1 BR | 97.0 | 3 798 231 |
| 11.06.2026 | 2 BR | 125.5 | 4 872 346 |
| 10.06.2026 | 1 BR | 108.2 | 2 888 289 |
| 08.06.2026 | 1 BR | 97.0 | 3 804 043 |
| 08.06.2026 | 2 BR | 150.0 | 4 801 372 |
| 05.06.2026 | 2 BR | 146.6 | 4 008 368 |
| 04.06.2026 | 1 BR | 93.0 | 2 794 235 |
| 20.05.2026 | 2 BR | 143.4 | 3 813 573 |
| 20.05.2026 | 2 BR | 143.5 | 3 597 899 |
| 20.05.2026 | 2 BR | 187.9 | 5 080 753 |
| 20.05.2026 | 1 BR | 82.7 | 2 433 519 |
| 19.05.2026 | 1 BR | 81.1 | 2 292 660 |
| 18.05.2026 | 2 BR | 136.0 | 3 685 038 |
| 18.05.2026 | 2 BR | 143.5 | 3 643 605 |
| 18.05.2026 | 1 BR | 105.7 | 3 429 459 |
| 18.05.2026 | 1 BR | 105.7 | 3 400 000 |
| 15.05.2026 | 1 BR | 93.3 | 2 879 280 |
Dubai Land Department transaction registry, updated 16.11.2026. Explore Dubai property transactions →
For UAE residents the down payment starts at 20% with terms up to 25 years. Indicative monthly payment for prices from 2 433 000 AED is 10 274 AED.
Estimates only; not a bank approval.


Vladimir Malin
Senior Broker · Continental Club Property · RERA ORN 31933
Answers questions about Al Habtoor Tower: current availability, payment plan, DLD registration. English and Russian.
We will send floor plans, the payment plan and available units for this project.
Project data comes from the Dubai Land Department (DLD) registry.
Every figure carries its origin: “DLD registry” is taken from the Dubai Land Department register, “Developer supplied” is stated by the developer, “Our calculation” is computed by us from the first two. Developer prices change without notice — confirm before you commit. Methodology
Al Habtoor Tower is an active high-rise residential and commercial project on Sheikh Zayed Road in Business Bay. It is being developed by Al Habtoor City Real Estate Development (Br. Of Dubai National Investment Co. Construction was 90.01% complete at the inspection dated 31 August 2026, with a recorded completion date of 31 December 2026.
Al Habtoor Tower is described as an 82-floor high-rise residential building with commercial uses included in its approved configuration. Its approved building profile is recorded as three basement levels, a ground floor, seven podium levels and 77 floors. The project has a concrete structure with blockwork, internal finishes and external finishes. It is located on Sheikh Zayed Road, within Business Bay. The project registration identifies two buildings, while the development is presented under the single Al Habtoor Tower project name. Its vertical form places it among the high-rise residential and mixed-use developments that characterise the Business Bay and Sheikh Zayed Road corridor.
Al Habtoor Tower has 1,739 apartments and a recorded total area of 401,157.11. The project combines residential and commercial components within its approved configuration. The development started on 1 October 2022. Business Bay itself is a mixed-use district containing office towers, residential high-rises and waterfront developments along the Dubai Canal corridor. The district has developed as both a commercial address and a residential area, with tall buildings forming much of its built environment. Al Habtoor Tower’s recorded unit count and high-rise structure make it a substantial project within this central Dubai district.
The project status is active. Construction progress was recorded at 90.01% on 31 August 2026. The project start date is 1 October 2022, and the recorded completion date is 31 December 2026. These dates provide the current recorded construction timetable for Al Habtoor Tower. The project’s approved form includes its structural works, blockwork and internal and external finishes. The development remains under construction as of the latest recorded inspection, with the completion ratio providing a dated measure of progress toward the stated completion date.
Al Habtoor Tower is in Business Bay, a large mixed-use district along the Dubai Canal and immediately southwest of Downtown Dubai. Business Bay is positioned on central Dubai’s urban spine and is characterised by office towers, residential high-rises, waterfront promenades, internal roads and landscaped public spaces. Sheikh Zayed Road borders the district, while the local road network also links Business Bay with Al Khail Road. The area includes the canal-side Marasi Business Bay precinct, which contains waterfront residences, a marina and promenades. Al Habtoor City is also located on the Sheikh Zayed Road waterfront along the waterway. Business Bay has continued to add residential projects alongside its established commercial stock.
Business Bay is served by the Dubai Metro Red Line. Station R26 is 551 metres from the district point of reference. The district is 1.5 km from Burj Khalifa and Downtown Dubai, and The Dubai Mall is 1.9 km away. Dubai International Airport is 12.6 km away, while Al Maktoum International Airport is 34.0 km away. Other listed destinations include Mall of the Emirates at 10.0 km, Palm Jumeirah at 15.1 km, Dubai Marina at 17.2 km and JBR Beach at 17.9 km. Sheikh Zayed Road and the local arterial network form the principal road connections for the district.
Al Habtoor City Real Estate Development (Br. Of Dubai National Investment Co is the developer of Al Habtoor Tower. The company is associated with a project in Business Bay that began construction on 1 October 2022 and has a recorded completion date of 31 December 2026. The project is configured as an 82-floor high-rise with residential and commercial uses. Its latest recorded construction progress is 90.01%, based on the inspection dated 31 August 2026. The development comprises 1,739 apartments and has a recorded total area of 401,157.11.
Resale prices in this area: Business Bay Apartments: Resale Market Report H1 2026 — 1,009 DLD resale deals, median AED 1,862/sq ft.
Dubai market as a whole: prices, transactions and trends (DLD data) →
Based on 50 registered DLD sales in Al Habtoor Tower between 15 May 2026 and 13 Nov 2026: median 28 321 AED/m² (2 631 AED/sq ft); half of the deals fell between 25 789 and 30 854 AED/m². This is transaction statistics, not a valuation of a specific unit: floor, view, finish and condition move the price.
| Type | Indicative price | Deals | Median AED/m² | Median area, m² |
|---|---|---|---|---|
| 1 BR | AED 2 821 000 | 26 | 30 263 | 93.2 |
| 2 BR | AED 3 903 000 | 20 | 27 470 | 142.1 |
| 3 BR | AED 5 257 000 | 4 | 24 787 | 212.1 |
Source: Dubai Land Department open data, the latest up to 50 sales in the building; areas as registered; refreshed daily. Deals outside 3,000–200,000 AED/m² are excluded.
PDF shortlist · updated 1 November 2026
Business Bay: new projects and prices
30 projects · prices from DLD and developers
Chic Tower by de Grisogono Business Bay · Studio, 1–4 BR
from AED 823,000
Binghatti Skyrise Business Bay · Studio, 1–3 BR
from AED 975,000
Binghatti Skyhall Business Bay · Studio, 1 BR
from AED 985,000
27 more in the PDF: prices, handover dates, payment plans
The PDF opens instantly. Refreshed monthly from DLD data.
1,297 of 1,739 apartments have been sold to first buyers per the DLD register. DLD registrations, including resales: 1,313 (since 2023). We compare your unit with sales of the same layout here, not with asking prices. Free, reply within 24 hours.
Machine-readable mirrors of this page: Markdown · JSON. They carry the same figures as this page, each with its origin labelled.
How to cite:Al Habtoor Tower — Continental Club Property, from Dubai Land Department registry and developer data, 2026-11-16, https://continentalclub.ae/project/al-habtoor-tower-business-bay/