Developer: Tarrad Development · DubaiLand Residence Complex
Celesto Tower 2 is a residential project by Tarrad Development in DubaiLand Residence Complex, Dubai, with handover 28.06.2028.
Data from the Dubai Land Department project registry (updated 19.08.2026 09:55).
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: Tarrad Development · District: DubaiLand Residence Complex
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 17.08.2026 | Studio | 29.1 | 514 150 |
| 13.08.2026 | 2 BR | 99.5 | 1 334 800 |
| 13.08.2026 | 2 BR | 99.5 | 1 334 550 |
| 10.08.2026 | 1 BR | 51.1 | 846 820 |
| 04.08.2026 | 1 BR | 56.1 | 905 000 |
| 03.08.2026 | 1 BR | 60.5 | 889 313 |
| 03.08.2026 | 1 BR | 56.1 | 843 922 |
| 03.08.2026 | 1 BR | 60.5 | 884 772 |
| 28.07.2026 | Studio | 29.2 | 590 000 |
| 28.07.2026 | Studio | 29.1 | 562 600 |
| 27.07.2026 | 1 BR | 51.4 | 837 233 |
| 27.07.2026 | Studio | 29.2 | 570 000 |
| 27.07.2026 | 1 BR | 51.1 | 779 706 |
| 24.07.2026 | 2 BR | 99.5 | 1 190 000 |
| 23.07.2026 | Studio | 29.1 | 529 200 |
| 23.07.2026 | 1 BR | 63.3 | 783 806 |
| 23.07.2026 | 1 BR | 63.3 | 783 806 |
| 22.07.2026 | 1 BR | 63.3 | 783 806 |
| 22.07.2026 | 1 BR | 63.3 | 783 806 |
| 21.07.2026 | 1 BR | 51.1 | 818 552 |
Dubai Land Department transaction registry, updated 2026-08-18. Explore Dubai property transactions →
Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.
| Type | Size, m² | Price, AED | Per m² | Deals |
|---|---|---|---|---|
| Studio | 30 | 560 500 | 18 683 | 18 |
| 1 bedroom | 53 | 806 714 | 15 221 | 30 |
| 2 bedrooms | 99 | 1 334 550 | 13 480 | 5 |
Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.
Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.

Celesto Tower 2 is a 231-unit residential project by Tarrad Development in DubaiLand Residence Complex, within Wadi Al Safa 5. The project is active, with a recorded construction start date of 28 January 2026, a completion ratio of 0.00, and completion dated 28 June 2028.
Celesto Tower 2 is registered under project number 4440 and has 231 total units. Its recorded total area is 10,952.57. Construction is dated to have started on 28 January 2026. The project holds active status, and its completion ratio is recorded at 0.00. Completion is dated 28 June 2028. These project details place Celesto Tower 2 among the newer residential construction activity in DubaiLand Residence Complex, a community that contains completed residential buildings as well as newer construction plots.
Celesto Tower 2 is located in DubaiLand Residence Complex, a residential community in the DubaiLand area within Wadi Al Safa 5. The community lies north-west of central Dubai and forms part of the wider DubaiLand cluster. Its built environment includes multiple residential buildings, mid-rise housing projects, newer construction plots, roads, pavements and landscaped roundabouts. Community green areas are distributed across the development. Main junction improvements and streetscaping are complete or in their final stages. The area contains a mix of established residential blocks and newer projects, with local road access linking the community to destinations across Dubai.
DubaiLand Residence Complex includes two mid-sized parks in each half of the community, together with smaller parks on the periphery. These outdoor areas include sports facilities and children’s play areas. Landscaped roundabouts and junctions add green coverage throughout the development. The Aquila School is 0.4 km from the community, while GEMS FirstPoint School is 0.6 km away. These school distances place both campuses close to the residential area. The community’s parks, sports spaces, play areas and nearby schools are part of the local setting surrounding Celesto Tower 2.
Road travel is the principal transport option from DubaiLand Residence Complex. Global Village is 7.6 km away. The Dubai Mall is 15.4 km away, Business Bay is 15.5 km away, and Burj Khalifa and Downtown Dubai are 15.7 km away. Dubai International Financial Centre is 16.5 km away. Dubai International Airport is 18.0 km away, while Mall of the Emirates is 18.1 km away. Dubai Marina is 24.0 km from the community. These distances place Celesto Tower 2 within the DubaiLand area while connecting it by road to major business, retail, leisure and airport destinations.
The nearest Green Line metro station is G30, located 14.6 km from DubaiLand Residence Complex. It is not within walking distance, so road connections serve as the main means of travel from the community. On-street parking within the community has been fully allocated, with a charge of AED 3 per hour where applicable. Residents may occasionally see aerobatic practice by the Fursan Al Emarat team above nearby desert areas. A mild sewage smell may be noticeable on some mornings, particularly when conditions are downwind from the Al Aweer Sewage Treatment Plant, which is 9 km to the north-east.
We will send floor plans, the payment plan and available units for this project.
Project data comes from the Dubai Land Department (DLD) registry.