Developer: Tarrad Development · DubaiLand Residence Complex

Celesto Tower

Celesto Tower is a residential project by Tarrad Development in DubaiLand Residence Complex, Dubai, with prices from AED 567 000, handover Q4 2027, construction 3.9% complete per the DLD registry, 271 units, 154 DLD-registered sales since 2025.

Price fromAED 567 000Developer supplied
HandoverQ4 2027Developer supplied
Construction3.9%DLD registry · checked 18 Jun 2026
Units271DLD registry
DLD sales154 since 2025DLD registry
Median sale priceAED 15 227/m²Our calculation
Mortgage~AED 2 390/moOur calculation

Every figure carries its origin: “DLD registry” is taken from the Dubai Land Department register, “Developer supplied” is stated by the developer, “Our calculation” is computed by us from the first two. Developer prices change without notice — confirm before you commit. Methodology

Layouts and sizes

TypeSize, sq.ft
Studio350
1 Bedroom590
2 Bedroom927

Payment plan 50/50

The purchase price is split into these stages.

120%Down payment
230%During construction
350%On handover

The exact schedule is confirmed in the sale agreement for the selected unit.

Mortgage for this project

For UAE residents the down payment starts at 20% with terms up to 25 years. Indicative monthly payment for prices from 567 000 AED is 2 394 AED.

Calculate mortgage

Estimates only; not a bank approval.

Handover date & construction progress

3.89%
  • StatusActive
  • Construction started2025-11-01
  • HandoverQ4 2027
  • Status date18.06.2026
  • Progress between DLD inspections+1.87% (2026-03-23 → 2026-06-18)
  • Escrow bankMashreq Bank
  • DLD project number4106

Data from the Dubai Land Department project registry (updated 04.10.2026 09:55).

Construction progress 12
18 June 2026 3.89%
Celesto Tower, DubaiLand Residence Complex construction progress — 18 June 2026, 3.89% complete, photo 1 of 4Celesto Tower, DubaiLand Residence Complex construction progress — 18 June 2026, 3.89% complete, photo 2 of 4Celesto Tower, DubaiLand Residence Complex construction progress — 18 June 2026, 3.89% complete, photo 3 of 4Celesto Tower, DubaiLand Residence Complex construction progress — 18 June 2026, 3.89% complete, photo 4 of 4

Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.

Recent transactions

DateTypeSize, m²Price, AED
15.09.20262 BR86.41 198 870
14.09.2026Studio34.0550 000
07.09.20261 BR66.1926 966
01.09.2026Studio48.2652 800
24.08.2026Studio36.7587 370
11.08.2026Studio33.2542 864
11.08.20261 BR66.1981 225
05.08.20261 BR57.2803 183
05.08.20261 BR57.1743 404
04.08.20261 BR67.9834 730
04.08.20261 BR57.2842 688
29.07.2026Studio33.1542 435
27.07.2026Studio33.1531 476
27.07.2026Studio37.4577 000
27.07.20261 BR77.8938 636
22.07.2026Studio48.2646 000
21.07.2026Studio39.6650 199
13.07.20261 BR69.9985 492
07.07.20262 BR86.41 179 425
07.07.2026Studio34.0527 315

Dubai Land Department transaction registry, updated 2026-10-03. Explore Dubai property transactions →

Registered transactions in Celesto Tower

Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.

154deals since 2025
15 227AED per m², median
0%resale, the rest bought from the developer

What buyers actually paid

TypeSize, m²Price, AEDPer m²Deals
Studio36576 05616 00296
1 bedroom58825 04414 22548
2 bedrooms861 179 42513 71410

Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.

Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.

How much is your property in Celesto Tower worth?

DLD has recorded 154 sales in this building since 2025. We compare your unit with sales of the same layout here, not with asking prices. Free, reply within 24 hours.

By submitting the form you agree to the processing of your contact details.

Amenities

  • Landscaped Gardens
  • Gymnasium
  • Restaurants
  • Indoor Swimming Pool
  • CCTV Security
  • Barbecue Area
  • Children's Play Area
Celesto Tower

About the project

Celesto Tower is a one-building residential development by Tarrad Development in DubaiLand Residence Complex, within Wadi Al Safa 5. It comprises 271 homes across a basement, ground floor, three podium levels, 13 residential floors and a rooftop. The project is active, with construction recorded at 3.89% completion and handover scheduled for Q4 2027.

The building and its design

Celesto Tower is configured as a residential building with a basement, ground floor, three podium levels, 13 residential floors and a rooftop level. The project has a total recorded area of 12,754.98. Its exterior design incorporates modern lines, curved surfaces and transparent glass used on windows and balcony railings. Spacious balconies are included in the design, with greenery forming part of the proposed building character. The tower is planned as a single building in DubaiLand Residence Complex, a residential community within the wider DubaiLand area. Its 271-unit scale combines homes and shared components within the same vertical building arrangement.

Apartment types and interior layout

The residence includes studios, one-bedroom apartments and two-bedroom apartments. Homes are described as fully furnished and designed with smart-home features. The layouts follow an open-concept arrangement, combining living, dining and kitchen spaces. Living rooms include large windows, while bedrooms have direct balcony access. Interior palettes are described as elegant and neutral, with the layout intended to connect indoor rooms with the balcony areas. The apartment selection spans three home types, allowing buyers to consider a studio, one-bedroom or two-bedroom configuration within the same building and location.

Podium and rooftop common areas

Shared areas are planned across the podium levels and the rooftop. The building structure places the three podium levels between the ground level and the 13 residential floors, while the rooftop forms the uppermost shared component of the development. Greenery is incorporated into the design of the spacious balconies, and the podium and rooftop are identified as common areas within the tower. These levels sit alongside the residential accommodation rather than forming separate buildings, as Celesto Tower is registered as one building.

DubaiLand Residence Complex setting

Celesto Tower is located in DubaiLand Residence Complex, within Wadi Al Safa 5 and north-west of central Dubai. The community contains multiple residential buildings, construction plots, parks and street infrastructure. Community-scale green areas are distributed through the neighbourhood, including landscaped roundabouts and junctions. The Aquila School is recorded 0.4 km away, while GEMS FirstPoint School is 0.6 km away. DubaiLand Residence Complex forms part of the wider DubaiLand cluster and includes residential projects at different stages of development. Road connections are the principal transport option for the community.

Parks, attractions and leisure destinations

Several green spaces are close to Celesto Tower. DLRC North Park is 0.2 km away, DRC Mixed Use West Park is 0.3 km away and DRC Central Community Hub is 0.5 km away. IMG Worlds of Adventure is 6.1 km from the tower, while Global Village is 7.8 km away and Ras Al Khor Wildlife Sanctuary is 11.6 km away. The Track Meydan Golf is 9.8 km away, and Dubai Hills Golf Club is 11.7 km away. Novo Cinema at IMG Worlds of Adventure is 6.1 km from the project, while Novo Cinema at Dragon Mall is 9.4 km away.

Prices, payment plan and construction progress

Prices at Celesto Tower start from AED 567,000. The payment plan is structured as 50/50: 20% is due on booking, 30% is payable during construction at 1% monthly, and the remaining 50% is due on handover. Construction started on 1 November 2025. The project is active and its recorded completion ratio is 3.89%. The scheduled completion date is 31 December 2027, corresponding with the stated Q4 2027 handover. The development contains 271 units, matching the registered total for the project.

Service charge: what to expect

The building is still under construction, so it has no RERA-approved budget yet — that comes after handover. The figures below are what already-completed buildings in the area pay.

Area median13.86 AEDper sq ft per year · 149 AED/m²
Range in the area4.51 – 19.01AED per sq ft · 28 buildings
A 1,000 sq ft unit≈ 13,860 AEDper year at the median · ≈ $3,774
vs Dubai median▼ -13.4%Dubai 16.01 AED/sq ft

Check the charge for a specific building →

Median across 28 completed buildings in DubaiLand Residence Complex for 2026, from the DLD service charge index (Mollak). This is an area benchmark, not this project’s rate: RERA approves that after handover and it may land either side of the median.

Frequent questions

Who is the developer of Celesto Tower?
Celesto Tower is developed by Tarrad Development. The company was founded in 2024.
Where is Celesto Tower located?
Celesto Tower is in DubaiLand Residence Complex, within Wadi Al Safa 5. The community is part of the wider DubaiLand area.
What apartment types are available at Celesto Tower?
The project includes studios, one-bedroom apartments and two-bedroom apartments. The homes are described as fully furnished and smart homes.
How many units are in Celesto Tower?
Celesto Tower has 271 units. It is registered as one building.
What is the starting price at Celesto Tower?
Prices start from AED 567,000.
What is the Celesto Tower payment plan?
The plan is 50/50, with 20% on booking, 30% during construction at 1% monthly, and 50% on handover.
When is Celesto Tower scheduled for handover?
Handover is scheduled for Q4 2027. The recorded project completion date is 31 December 2027.
What is the construction status of Celesto Tower?
Celesto Tower is active and recorded at 3.89% completion. Construction started on 1 November 2025.
What is near Celesto Tower?
DLRC North Park is 0.2 km away, IMG Worlds of Adventure is 6.1 km away, and Global Village is 7.8 km away.
How can I buy an apartment in Celesto Tower?
Submit an enquiry via the form on this page or message us on WhatsApp — a Continental Club Property broker (RERA 31933) will help you choose a unit and send the brochure and payment plan.

Nearby projects

Get the presentation and prices

We will send floor plans, the payment plan and available units for this project.

By submitting the form you agree to the processing of your contact details.

Project data comes from the Dubai Land Department (DLD) registry.

For AI agents and researchers

Machine-readable mirrors of this page: Markdown · JSON. They carry the same figures as this page, each with its origin labelled.

How to cite:Celesto Tower — Continental Club Property, from Dubai Land Department registry and developer data, 2026-10-01, https://continentalclub.ae/project/celesto-tower-dubailand-residence-complex/