Developer: Al Sayyah Group · Arjan

Butterfly Towers

Butterfly Towers is a residential project by Al Sayyah Group in Arjan, Dubai, with prices from AED 816 000, handover Q1 2029, construction 8.2% complete per the DLD registry, 570 apartments (+26 non-residential units), 198 sold to first buyers per the DLD register (as of 23 Nov 2026).

Price fromAED 816 000Our calculation
Unit typesStudio · 1 · 2 BR409–1 724 ft²Developer supplied
HandoverQ1 2029Developer supplied
Construction8.2%DLD registry · checked 04.11.2026

· price from DLD deals · DLD data as of 23 Nov

≈372 of 570 apartments still available · DLD, 23 Nov
★ 5.0 on Google · 7 reviews

Layouts and sizes

TypeSize, sq.ft
Studio409–501
1 Bedroom831–1 099
2 Bedroom1 350–1 724

Balcony or terrace per the DLD registry: almost every residential unit (100%). Typical size: Studio — ~67 sq.ft (6.2 m²); 1 Bedroom — ~191 sq.ft (18 m²); 2 Bedroom — ~235 sq.ft (22 m²). Median of registered units; for villas and townhouses the registry includes terraces and open areas.

Unit availability · DLD data as of 23 Nov 2026

≈372 of 570 apartments available

Sold to first buyers 198 (35%)Available ≈372

TypeTotalSoldAvailable
Studios20090110
1 bedroom27090180
2 bedrooms1001882
Total570198372

Sales data comes from the official Dubai Land Department (DLD) register. Please confirm actual availability with our sales team — leave a request.

Tap an apartment type in the table to add it to your request.

By submitting the form you agree to the processing of your contact details, including for advertising analytics.

“Available” means units without a registered sale; resales are excluded. Non-residential units (26) are not included.

Units left in every Dubai off-plan project →

Compare with similar projects

A broker will compare this project with 3 similar ones: prices, handover dates and payment plans.

Compare in WhatsApp

Handover date & construction progress

8.15%
  • StatusActive
  • Construction started01.01.2025
  • HandoverQ1 2029
  • Status date04.11.2026
  • Progress between DLD inspections+0.5% (21.05.2026 → 04.11.2026)
  • Escrow bankEmirates NBD
  • Scale2 bldg
  • DLD project number3060

Data from the Dubai Land Department project registry (updated 25.11.2026 05:55).

Inspection history 3
025507510002.07.202404.11.2026
Actual, per inspections

Pace: 0.09% per month. At this rate we do not project a completion date: it falls more than 10 years out.

The pace is calculated from the past year of inspections. It is an estimate, not a developer commitment. For reference: across 1,175 completed projects the median pace is 2.48% per month and the median build takes 40 months.

Construction progress 42
21.05.2026 7.65%
Butterfly Towers, Arjan construction progress — 21 May 2026, 7.65% complete, photo 1 of 28Butterfly Towers, Arjan construction progress — 21 May 2026, 7.65% complete, photo 2 of 28Butterfly Towers, Arjan construction progress — 21 May 2026, 7.65% complete, photo 3 of 28Butterfly Towers, Arjan construction progress — 21 May 2026, 7.65% complete, photo 4 of 28Butterfly Towers, Arjan construction progress — 21 May 2026, 7.65% complete, photo 5 of 28Butterfly Towers, Arjan construction progress — 21 May 2026, 7.65% complete, photo 6 of 28Butterfly Towers, Arjan construction progress — 21 May 2026, 7.65% complete, photo 7 of 28Butterfly Towers, Arjan construction progress — 21 May 2026, 7.65% complete, photo 8 of 28Butterfly Towers, Arjan construction progress — 21 May 2026, 7.65% complete, photo 9 of 28Butterfly Towers, Arjan construction progress — 21 May 2026, 7.65% complete, photo 10 of 28Butterfly Towers, Arjan construction progress — 21 May 2026, 7.65% complete, photo 11 of 28Butterfly Towers, Arjan construction progress — 21 May 2026, 7.65% complete, photo 12 of 28Butterfly Towers, Arjan construction progress — 21 May 2026, 7.65% complete, photo 13 of 28Butterfly Towers, Arjan construction progress — 21 May 2026, 7.65% complete, photo 14 of 28Butterfly Towers, Arjan construction progress — 21 May 2026, 7.65% complete, photo 15 of 28Butterfly Towers, Arjan construction progress — 21 May 2026, 7.65% complete, photo 16 of 28Butterfly Towers, Arjan construction progress — 21 May 2026, 7.65% complete, photo 17 of 28Butterfly Towers, Arjan construction progress — 21 May 2026, 7.65% complete, photo 18 of 28Butterfly Towers, Arjan construction progress — 21 May 2026, 7.65% complete, photo 19 of 28Butterfly Towers, Arjan construction progress — 21 May 2026, 7.65% complete, photo 20 of 28Butterfly Towers, Arjan construction progress — 21 May 2026, 7.65% complete, photo 21 of 28Butterfly Towers, Arjan construction progress — 21 May 2026, 7.65% complete, photo 22 of 28Butterfly Towers, Arjan construction progress — 21 May 2026, 7.65% complete, photo 23 of 28Butterfly Towers, Arjan construction progress — 21 May 2026, 7.65% complete, photo 24 of 28Butterfly Towers, Arjan construction progress — 21 May 2026, 7.65% complete, photo 25 of 28Butterfly Towers, Arjan construction progress — 21 May 2026, 7.65% complete, photo 26 of 28Butterfly Towers, Arjan construction progress — 21 May 2026, 7.65% complete, photo 27 of 28Butterfly Towers, Arjan construction progress — 21 May 2026, 7.65% complete, photo 28 of 28
02.07.2024 0.00%
Butterfly Towers, Arjan construction progress — 2 July 2024, 0.00% complete, photo 1 of 8Butterfly Towers, Arjan construction progress — 2 July 2024, 0.00% complete, photo 2 of 8Butterfly Towers, Arjan construction progress — 2 July 2024, 0.00% complete, photo 3 of 8Butterfly Towers, Arjan construction progress — 2 July 2024, 0.00% complete, photo 4 of 8Butterfly Towers, Arjan construction progress — 2 July 2024, 0.00% complete, photo 5 of 8Butterfly Towers, Arjan construction progress — 2 July 2024, 0.00% complete, photo 6 of 8Butterfly Towers, Arjan construction progress — 2 July 2024, 0.00% complete, photo 7 of 8Butterfly Towers, Arjan construction progress — 2 July 2024, 0.00% complete, photo 8 of 8

6 more photos in the DLD register

Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.

Registered transactions in Butterfly Towers

Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.

212DLD registrations incl. resales, since 2025
18 134AED per m², median
0%resale, the rest bought from the developer
-8%over the past year

The yearly figure compares the last 12 months with the 12 before them: calendar years would not work, the current one is unfinished. The district moved +2% over the same period, so the building lagged.

What buyers actually paid

TypeSize, m²Price, AEDPer m²Deals
Studio40836 77720 91990
1 bedroom801 410 98617 63790
2 bedrooms1272 148 77716 92018

Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.

Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.

Recent transactions

DateTypeSize, m²Price, AED
07.09.20261 BR81.81 417 777
02.09.20261 BR89.11 492 586
03.08.20262 BR125.42 091 625
28.07.2026Studio40.1828 777
03.07.202679.73 050 150
12.06.202683.53 197 795
05.06.20261 BR78.91 362 777
04.06.20261 BR78.91 271 786
04.06.2026Studio40.2847 777
25.05.20261 BR78.81 411 961
25.05.202637.81 351 638
14.05.2026Studio40.7851 938
06.05.2026Studio39.2788 777
21.04.2026Studio40.7887 777
21.04.20262 BR132.02 112 746
16.04.20261 BR87.81 410 986
16.04.20261 BR89.01 514 777
16.04.20261 BR79.41 282 601
16.04.20261 BR78.91 287 501
15.04.20261 BR88.51 368 746
01.04.2026Studio39.2854 777
01.04.20261 BR79.41 298 666
01.04.20261 BR78.81 357 226
19.03.20261 BR78.91 295 704
19.03.20261 BR88.51 400 000
18.03.20261 BR78.91 292 906
18.03.20261 BR87.81 433 443
13.03.20261 BR87.81 355 610
12.03.20261 BR88.51 433 521
12.03.20261 BR79.41 283 305
12.03.20261 BR78.81 437 441
12.03.2026Studio40.7893 777
12.03.20262 BR132.02 059 946
12.03.20261 BR87.81 426 661
10.03.20261 BR88.51 382 561
10.03.20261 BR81.81 439 777
09.03.20261 BR79.41 271 785
09.03.2026Studio40.1836 777
09.03.2026Studio40.2839 000
09.03.20261 BR79.21 452 844
09.03.2026Studio39.2845 777
09.03.2026Studio40.1845 777
09.03.20261 BR79.01 437 866
09.03.20261 BR78.81 420 586
09.03.2026Studio46.5920 777
06.03.20261 BR88.51 404 592
05.03.20261 BR78.81 322 863
03.03.2026Studio46.5881 777
03.03.2026Studio46.2921 385
03.03.20262 BR126.52 169 386

Dubai Land Department transaction registry, updated 24.11.2026. Explore Dubai property transactions →

Mortgage for this project

For UAE residents the down payment starts at 20% with terms up to 25 years. Indicative monthly payment for prices from 816 000 AED is 3 446 AED.

Calculate mortgage

Estimates only; not a bank approval.

Amenities

  • Gyms
  • Sauna
  • Steam room
  • Kids' swimming pool
  • Adult swimming pool
  • Kids' play area
  • Private balcony

What is nearby

  • Burj Khalifa20 мин
  • Dubai Hills Mall10 мин
  • Dubai International Airport25 мин
  • Dubai Miracle Garden5 мин
  • Global Village10 мин
  • Jumeirah Beach20 мин

Places nearby

Butterfly Towers

Your broker for this project

Olesia Kotova

Olesia Kotova

Broker · Continental Club Property · RERA ORN 31933

Answers questions about Butterfly Towers: current availability, payment plan, DLD registration. English and Russian.

Get the presentation and prices

We will send floor plans, the payment plan and available units for this project.

By submitting the form you agree to the processing of your contact details, including for advertising analytics.

Project data comes from the Dubai Land Department (DLD) registry.

Every figure carries its origin: “DLD registry” is taken from the Dubai Land Department register, “Developer supplied” is stated by the developer, “Our calculation” is computed by us from the first two. Developer prices change without notice — confirm before you commit. Methodology

About the project

Butterfly Towers is a two-tower residential development by Al Sayyah Group in Arjan, Dubai. The project contains 570 apartments (+26 non-residential units) and is structured as two buildings with 2 basement levels, a ground floor, 2 podium levels and 17 floors. It is active, with construction completion recorded at 7.65%, and handover is scheduled for Q1 2029.

Twin-tower design and project structure

Butterfly Towers comprises two residential towers, each planned with 285 residential homes. The overall project includes 570 apartments (+26 non-residential units). The buildings follow a 2B+G+2P+17 configuration, comprising two basement levels, a ground floor, two podium levels and 17 floors. The twin-tower design uses golden accents and a butterfly-inspired architectural concept. Floor-to-ceiling windows are specified throughout the residences, bringing natural light into the interiors and framing views towards Dubai Science Park, green parks and the Arjan neighbourhood. All residential units are fully furnished and include premium kitchen appliances.

Studios, one-bedroom and two-bedroom homes

The residential range at Butterfly Towers consists of furnished studios, one-bedroom apartments and two-bedroom apartments. Studios range from 408.5 to 500.7 square feet. One-bedroom apartments range from 830.7 to 1,098.8 square feet, while two-bedroom apartments range from 1,349.6 to 1,723.9 square feet. Interior specifications include Alicante Light Grey matt porcelain tiles, white wall and ceiling paint, black switches and sockets, chandeliers in main areas and metal detailing on skirtings. Kitchens are planned with integrated appliances, MR MDF cabinetry with a wood-grain melamine finish, Colonial White granite countertops and porcelain-tile backsplashes. Bedrooms include MDF wardrobes with wood-grain melamine, while bathrooms feature granite countertops, semi-recessed basins, walk-in showers with glazing and non-slip porcelain shower flooring.

Leisure and family amenities

Residents have access to two gyms, a sauna and a steam room for fitness and wellness use. The leisure provision includes an adult swimming pool and a separate kids’ swimming pool. A dedicated kids’ play area is also included within the project. Every residence has a private balcony. The development’s shared amenities combine pool, fitness, wellness and children’s facilities within the two-tower scheme. The floor-to-ceiling windows and private balconies are planned alongside views of Dubai Science Park, nearby green parks and the surrounding Arjan area. Retail forms part of the project, with 26 retail units included in the total unit count.

Arjan location and road access

Butterfly Towers is located in Arjan, with access via Sheikh Mohammed Bin Zayed Road and Umm Suqeim Street. Dubai Miracle Garden is 5 minutes away, while Global Village and Dubai Hills Mall are each 10 minutes away. Burj Khalifa and Jumeirah Beach are each 20 minutes away. Dubai International Airport is 25 minutes away. Within the nearby area, Arjan East Park is 0.2 km from the project and Dubai Science Park South Park is 0.3 km away. Dubai Miracle Garden is listed at 0.9 km, and Dubai Science Park Community Park is also 0.9 km away. Arabian Ranches Golf Club is 2.9 km away, while Cinepolis at Circle Mall is 3.1 km away.

Payment structure and handover

Handover for Butterfly Towers is scheduled for Q1 2029. The project’s recorded completion date is 31 January 2029. Its payment structure allocates 50% during construction, 10% on handover and 40% post-handover. Construction started on 1 January 2025. The project is active and has reached 7.65% completion. The two-building development is planned with a concrete structure and blockwork, together with internal and external finishes. The scheduled handover falls within the same quarter as the recorded completion date.

Al Sayyah Group

Butterfly Towers is developed by Al Sayyah Group. The group presents the project as a residential development in Arjan comprising twin towers and furnished studio, one-bedroom and two-bedroom homes. The project’s residential offering is supported by two gyms, sauna and steam facilities, adult and children’s pools, a kids’ play area and private balconies. The two towers contain 570 residential units in total, split equally between Tower A and Tower B, with 285 residential homes in each tower. A further 26 retail units bring the project-wide unit count to 596.

Service charge: what to expect

The building is still under construction, so it has no RERA-approved budget yet — that comes after handover. The figures below are what already-completed buildings in the area pay.

Area median15.57 AEDper sq ft per year · 168 AED/m²
Range in the area5.58 – 21.97AED per sq ft · 53 buildings
A 1,000 sq ft unit≈ 15,570 AEDper year at the median · ≈ $4,240
vs Dubai median▼ -2.8%Dubai 16.02 AED/sq ft

Check the charge for a specific building →

Median across 53 completed buildings in Arjan for 2026, from the DLD service charge index (Mollak). This is an area benchmark, not this project’s rate: RERA approves that after handover and it may land either side of the median.

Frequent questions

Who is the developer of Butterfly Towers?
Butterfly Towers is developed by Al Sayyah Group.
Where is Butterfly Towers located?
Butterfly Towers is located in Arjan, Dubai, with access via Sheikh Mohammed Bin Zayed Road and Umm Suqeim Street.
What types of properties are available at Butterfly Towers?
The project offers furnished studios, one-bedroom apartments and two-bedroom apartments. It also includes 26 retail units.
What are the apartment sizes at Butterfly Towers?
Studios range from 408.5 to 500.7 square feet, one-bedroom apartments from 830.7 to 1,098.8 square feet, and two-bedroom apartments from 1,349.6 to 1,723.9 square feet.
When is the Butterfly Towers handover date?
Butterfly Towers handover (completion) is scheduled for Q1 2029 (developer data). The DLD register lists 31 January 2029. Construction progress was 8.15% at the DLD inspection of 4 November 2026. The date and progress on this page are updated from the DLD register. For current availability, prices and resale (assignment) options, send an enquiry on this page.
What is the payment plan for Butterfly Towers?
The payment structure is 50% during construction, 10% on handover and 40% post-handover.
What is the construction status of Butterfly Towers?
Butterfly Towers is active and recorded at 7.65% completion.
How many units are in Butterfly Towers?
The project contains 570 apartments (+26 non-residential units), including 570 residential units and 26 retail units.
What amenities does Butterfly Towers offer?
Amenities include two gyms, a sauna, steam room, adult swimming pool, kids’ swimming pool, kids’ play area and private balconies.
What is near Butterfly Towers in Arjan?
Dubai Miracle Garden is 5 minutes away, while Global Village and Dubai Hills Mall are each 10 minutes away. Arjan East Park is 0.2 km away.
How many apartments are left in Butterfly Towers?
According to the Dubai Land Department (DLD) register, as of 23 Nov 2026 ≈372 of 570 apartments in Butterfly Towers have no registered sale; 198 have been sold to first buyers (35%). This is registry data, not a developer availability list: please confirm current availability and prices with our sales team — leave a request on this page.
How can I buy an apartment in Butterfly Towers?
Submit an enquiry via the form on this page or message us on WhatsApp — a Continental Club Property broker (RERA 31933) will help you choose a unit and send the brochure and payment plan.

Estimate a unit in this building from DLD sales

Based on 50 registered DLD sales in Butterfly Towers between 3 Mar 2026 and 7 Sep 2026: median 17 246 AED/m² (1 602 AED/sq ft); half of the deals fell between 16 212 and 20 540 AED/m². This is transaction statistics, not a valuation of a specific unit: floor, view, finish and condition move the price.

TypeIndicative priceDealsMedian AED/m²Median area, m²
StudioAED 840 0001420 89940.2
1 BRAED 1 298 0002916 34879.4
2 BRAED 2 113 000416 342129.3
Get an exact valuation

Source: Dubai Land Department open data, the latest up to 50 sales in the building; areas as registered; refreshed daily. Deals outside 3,000–200,000 AED/m² are excluded.

PDF shortlist · updated 1 November 2026

Arjan: new projects and prices

30 projects · prices from DLD and developers

  1. Elano by Oro24 Elano by Oro24 Arjan · Studio, 1–2 BR from AED 555,872
  2. Vincitore Volare Vincitore Volare Arjan · Studio, 1–2 BR from AED 597,000
  3. Gharbi 1 Residences Gharbi 1 Residences Arjan · Studio, 1–2 BR from AED 599,000

27 more in the PDF: prices, handover dates, payment plans

The PDF opens instantly. Refreshed monthly from DLD data.

How much is your property in Butterfly Towers worth?

198 of 570 apartments have been sold to first buyers per the DLD register. DLD registrations, including resales: 212 (since 2025). We compare your unit with sales of the same layout here, not with asking prices. Free, reply within 24 hours.

By submitting the form you agree to the processing of your contact details, including for advertising analytics.

Nearby projects

For AI agents and researchers

Machine-readable mirrors of this page: Markdown · JSON. They carry the same figures as this page, each with its origin labelled.

How to cite:Butterfly Towers — Continental Club Property, from Dubai Land Department registry and developer data, 2026-10-07, https://continentalclub.ae/project/butterfly-towers-arjan/

Where should we send the shortlist?

The PDF downloads right after you submit. A manager gets in touch only if you ask.