Developer: Binghatti Developers · Arjan

Binghatti Hillcrest

Binghatti Hillcrest is a residential project by Binghatti Developers in Arjan, Dubai, with handover Q4 2026, construction 50.2% complete per the DLD registry.

HandoverQ4 2026Developer supplied
Construction50.2%DLD registry · checked 31 Jul 2026

Every figure carries its origin: “DLD registry” is taken from the Dubai Land Department register, “Developer supplied” is stated by the developer, “Our calculation” is computed by us from the first two. Developer prices change without notice — confirm before you commit. Methodology

Residence types

  • Studio Apt.
  • 1-Bed Apt.
  • 2-Bed Apt.

Payment plan 70/30

The purchase price is split into these stages.

120%Down payment
250%During construction
330%On handover

The exact schedule is confirmed in the sale agreement for the selected unit.

Handover date & construction progress

50.23%
  • StatusActive
  • HandoverQ4 2026
  • Status date31.07.2026
  • Progress between DLD inspections+40.97% (2025-09-24 → 2026-07-31)
  • DLD project number4105

Data from the Dubai Land Department project registry (updated 21.09.2026 09:55).

Construction progress 24
31 July 2026 50.23%
Binghatti Hillcrest, Arjan construction progress — 31 July 2026, 50.23% complete, photo 1 of 16Binghatti Hillcrest, Arjan construction progress — 31 July 2026, 50.23% complete, photo 2 of 16Binghatti Hillcrest, Arjan construction progress — 31 July 2026, 50.23% complete, photo 3 of 16Binghatti Hillcrest, Arjan construction progress — 31 July 2026, 50.23% complete, photo 4 of 16Binghatti Hillcrest, Arjan construction progress — 31 July 2026, 50.23% complete, photo 5 of 16Binghatti Hillcrest, Arjan construction progress — 31 July 2026, 50.23% complete, photo 6 of 16Binghatti Hillcrest, Arjan construction progress — 31 July 2026, 50.23% complete, photo 7 of 16Binghatti Hillcrest, Arjan construction progress — 31 July 2026, 50.23% complete, photo 8 of 16Binghatti Hillcrest, Arjan construction progress — 31 July 2026, 50.23% complete, photo 9 of 16Binghatti Hillcrest, Arjan construction progress — 31 July 2026, 50.23% complete, photo 10 of 16Binghatti Hillcrest, Arjan construction progress — 31 July 2026, 50.23% complete, photo 11 of 16Binghatti Hillcrest, Arjan construction progress — 31 July 2026, 50.23% complete, photo 12 of 16Binghatti Hillcrest, Arjan construction progress — 31 July 2026, 50.23% complete, photo 13 of 16Binghatti Hillcrest, Arjan construction progress — 31 July 2026, 50.23% complete, photo 14 of 16Binghatti Hillcrest, Arjan construction progress — 31 July 2026, 50.23% complete, photo 15 of 16Binghatti Hillcrest, Arjan construction progress — 31 July 2026, 50.23% complete, photo 16 of 16

Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.

Recent transactions

DateTypeSize, m²Price, AED
17.09.2026Studio33.9813 999
17.09.20261 BR66.31 100 000
17.09.20261 BR93.01 175 000
09.09.20261 BR66.81 309 999
09.09.2026Studio33.8819 999
09.09.2026Studio34.0824 999
09.09.2026Studio33.5808 999
09.09.2026Studio33.8819 999
09.09.20261 BR66.81 311 999
09.09.20261 BR76.31 492 999
31.08.2026Studio33.6815 999
28.08.2026Studio34.6606 000
19.08.2026Studio33.8824 999
17.08.20261 BR65.81 200 000
12.08.2026Studio34.0832 999
12.08.2026Studio33.8824 999
12.08.20261 BR81.81 200 000
27.07.2026Studio33.6811 999
27.07.2026Studio35.7831 999
22.07.2026Studio33.6813 999

Dubai Land Department transaction registry, updated 2026-09-20. Explore Dubai property transactions →

Registered transactions in Binghatti Hillcrest

Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.

226deals since 2025
23 650AED per m², median
0%resale, the rest bought from the developer

What buyers actually paid

TypeSize, m²Price, AEDPer m²Deals
Studio34828 99924 382110
1 bedroom671 348 99920 134105

Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.

Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.

Amenities

  • Yoga area
  • Adult pool
  • Kids pool
  • Jogging track
  • Kids play area
  • Sunken seating
  • Green spaces
  • Seating areas
  • Concierge services
  • Gym

Places nearby

Binghatti Hillcrest

About the project

Binghatti Hillcrest is a residential and retail development in Arjan by Binghatti Developers. The building is configured as basement, ground floor, four residential floors and a roof, with 322 residential units and 28 retail shops on the ground floor. The project is active; its completion ratio was 50.23% at the inspection dated 31 July 2026, and its recorded completion date is 31 December 2026.

A low-rise residential and retail address

Binghatti Hillcrest is planned as a low-rise building on a 11,090.47-square-metre plot. Its residential component comprises 180 studios, 138 one-bedroom apartments and four two-bedroom apartments, for a total of 322 homes. A further 28 retail shops are positioned on the ground floor. The project’s listed configuration is basement, ground floor, four residential floors and a roof. The development combines homes and street-level retail within one address in Arjan, an Al Barsha South neighbourhood that includes apartment communities, retail plots and leisure attractions. The project’s total area is recorded as 23,639.05 square metres, with 396 total units recorded for the wider project.

Curved facade and residential interiors

The design is defined by a curved facade, expansive windows and clean lines. The facade is engineered to maximise natural sunlight and to strengthen the building’s connection with its surroundings. Hillcrest is designed as a low-rise residence with green spaces in the neighbourhood forming part of its outlook. Interior materials specified for the residences include megagreige, verde alplumen, cream paint, accent fabric, walnut savanah, metallic glass, leather, fabric, brass and glass. The residences include smart-home features and AI-driven technology. Dedicated safety measures include 24-hour security and advanced surveillance systems. Concierge services and Binghatti Bespoke services are also included in the project’s stated residential offering.

Pools, recreation and green spaces

The amenity programme includes an adult pool, a children’s pool and Aqua Joy. Residents will also have access to a yoga area, jogging track and children’s play area. Green spaces, seating areas and sunken seating form part of the outdoor facilities. Walkways and benches are included within the landscaped areas, while a central family sitting zone provides a shared communal setting. The facilities bring water-based recreation, outdoor activity and children’s play into the project’s common areas. The selection of pool areas, a jogging track, yoga space, play facilities, seating and landscaped zones is designed as part of the building’s family-oriented amenity provision.

Arjan setting and road connections

Binghatti Hillcrest is located in Arjan, a mixed-use residential and leisure neighbourhood within Al Barsha South. Arjan sits near the junction of Sheikh Mohammed Bin Zayed Road and Umm Suqeim Road. Hillcrest has access to Sheikh Mohammed Bin Zayed Road, Sheikh Zayed Road, Umm Suqeim Road and Hessa Street. Dubai Science Park, Motor City, Dubai Hills and Jumeirah Village Circle are identified as connected areas. Arjan Community Park North is 0.2 km from the project, Diamond Park Arjan is 0.5 km away and Arjan Community Park is 0.6 km away. Dubai Miracle Garden is 1.3 km away. Cinepolis at Circle Mall is 1.8 km away, while Arabian Ranches Golf Club and The Els Golf Club are each 3.9 km away.

Construction progress and scheduled completion

Binghatti Hillcrest is recorded as active. Construction began on 1 October 2025. At the inspection dated 31 July 2026, the project had reached a 50.23% completion ratio. The recorded completion date is 31 December 2026. The project record was updated on 4 August 2026. The development’s building description is basement, ground floor, four residential floors and a roof. Its scheduled completion date places the project among Arjan’s active development pipeline, alongside a mix of established apartment buildings, retail plots and leisure destinations in the surrounding neighbourhood.

Binghatti Developers

Binghatti Developers is a vertically integrated real estate developer founded in 2008, with origins as a contractor before moving into full-scale development. Its operations cover design, development, construction and delivery. The company has a portfolio exceeding 80 projects valued at more than AED 80 billion, has delivered more than 50 projects and maintains a pipeline of 30 million square feet of sellable area. Its development range includes affordable housing, mid-market homes, premium residences and ultra-luxury branded residences. Binghatti identifies energy-efficient technologies, responsible material selection and long-term value creation as elements of its development approach. At Hillcrest, this is reflected in the stated use of energy-efficient building practices and sustainable, high-end materials.

Frequent questions

Who is the developer of Binghatti Hillcrest?
Binghatti Hillcrest is developed by Binghatti Developers. The developer was founded in 2008 and operates across design, development, construction and delivery.
Where is Binghatti Hillcrest located?
Binghatti Hillcrest is in Arjan, within the Al Barsha South area of Dubai. Arjan is near the junction of Sheikh Mohammed Bin Zayed Road and Umm Suqeim Road.
What types of homes are available at Binghatti Hillcrest?
The project includes 180 studios, 138 one-bedroom apartments and four two-bedroom apartments. It has 322 residential units in total.
What is the completion status of Binghatti Hillcrest?
The project is active and had reached 50.23% completion at the inspection dated 31 July 2026. Construction started on 1 October 2025.
When is Binghatti Hillcrest scheduled for completion?
The recorded completion date is 31 December 2026.
What amenities are planned at Binghatti Hillcrest?
Amenities include adult and children’s pools, Aqua Joy, a yoga area, jogging track, children’s play area, green spaces, seating areas and sunken seating. The project also includes 24-hour security and advanced surveillance systems.
What is near Binghatti Hillcrest?
Arjan Community Park North is 0.2 km away, and Dubai Miracle Garden is 1.3 km away. Cinepolis at Circle Mall is 1.8 km away.
How many retail units are in Binghatti Hillcrest?
There are 28 retail shops on the ground floor. The project combines these shops with its 322 residential units.
What is the payment plan for Binghatti Hillcrest?
Payment-plan terms are not included here.
How can I buy an apartment in Binghatti Hillcrest?
Submit an enquiry via the form on this page or message us on WhatsApp — a Continental Club Property broker (RERA 31933) will help you choose a unit and send the brochure and payment plan.

Nearby projects

Get the presentation and prices

We will send floor plans, the payment plan and available units for this project.

By submitting the form you agree to the processing of your contact details.

Project data comes from the Dubai Land Department (DLD) registry.

For AI agents and researchers

Machine-readable mirrors of this page: Markdown · JSON. They carry the same figures as this page, each with its origin labelled.

How to cite:Binghatti Hillcrest — Continental Club Property, from Dubai Land Department registry and developer data, 2026-09-13, https://continentalclub.ae/project/binghatti-hillcrest-arjan/