Belgravia Gardens is a residential project by Ellington Properties in Liwan, Dubai, with handover 30.09.2028, construction 3.1% complete per the DLD registry.

Construction3.1%

Payment plan 70/30

20%50%30%
  • Down payment20%
  • During construction50%
  • On handover30%

Construction progress

3.08%
  • Handover30.09.2028
  • Status date04.06.2026
  • DLD project number3512

Data from the Dubai Land Department project registry (updated 09.08.2026 09:55).

Construction progress 10
4 June 2026 3.08%
Belgravia Gardens, Liwan construction progress — 4 June 2026, 3.08% complete, photo 1 of 4Belgravia Gardens, Liwan construction progress — 4 June 2026, 3.08% complete, photo 2 of 4Belgravia Gardens, Liwan construction progress — 4 June 2026, 3.08% complete, photo 3 of 4Belgravia Gardens, Liwan construction progress — 4 June 2026, 3.08% complete, photo 4 of 4

Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.

Recent transactions

DateTypeSize, m²Price, AED
06.08.20261 BR71.51 307 828
03.08.20262 BR99.21 610 000
16.07.20263 BR158.42 689 828
15.07.20262 BR115.71 886 828
15.07.20261 BR73.91 376 828
15.07.20262 BR130.91 947 828
15.07.20262 BR115.71 941 828
13.07.20263 BR211.13 510 829
02.07.2026Studio46.1814 828
30.06.20261 BR72.81 299 828
25.06.20262 BR119.11 595 828
19.06.20262 BR102.71 800 007
15.06.20262 BR148.52 558 828
09.06.20262 BR110.71 988 828
09.06.20263 BR158.42 645 828
09.06.20263 BR164.42 895 828
22.05.20261 BR71.01 272 828
18.05.20261 BR73.81 355 828
15.05.20261 BR71.91 265 828
08.05.20262 BR103.91 762 828

Dubai Land Department transaction registry, updated 2026-08-08. Explore Dubai property transactions →

About the project

Belgravia Gardens is a 743-unit project in Liwan by Ellington Karma Developers. It is active, with construction recorded at 3.08% at the inspection dated 4 June 2026, and its scheduled completion date is 30 September 2028.

Project layout

Belgravia Gardens has 743 units across a development area recorded as 72,548.75. The project description sets out four buildings configured as basement, ground and six floors, together with one building configured as basement, ground and one floor. The project started on 31 January 2025. Its scheduled completion date is 30 September 2028. The building configuration combines four mid-rise blocks with a separate lower-rise building within the same project.

Construction status and completion

Belgravia Gardens is active. Construction progress was recorded at 3.08% on the inspection date of 4 June 2026. The project began on 31 January 2025 and is scheduled for completion on 30 September 2028. The project is identified by number 3512. The recorded unit count is 743, matching the project’s stated total number of units.

Liwan setting

Belgravia Gardens is located in Liwan, a mixed-use freehold township within the DubaiLand masterplan. Liwan sits at the junction of Emirates Road and Al Ain Road, across from Academic City and Dubai Silicon Oasis. The community covers roughly 13 million square feet and was planned with residential enclaves, mixed-use plots, lakes and parkland. Its masterplan is divided into Golden Gate District and Park, The Ridge, Downtown and The Suburb. Residential development in Liwan is focused on mid-rise buildings, while the original masterplan also includes commercial and business activity plots.

Connections and recorded distances

Liwan is an inland DubaiLand community with road connections through Emirates Road and Al Ain Road. Recorded distances place Global Village 7.4 km away, Downtown Dubai and Burj Khalifa 13.5 km away, The Dubai Mall 13.1 km away, and Business Bay 13.3 km away. DIFC is listed at 14.2 km, while Dubai International Airport is listed at 16.0 km. The nearest identified Dubai Metro station is Green Line station G30, at a straight-line distance of 12,357 metres; it is not walkable from the community.

The surrounding development area

Liwan contains completed buildings and ongoing construction phases across adjacent plots. Recorded nearby schemes include Albero by ORO24, Confident Lancaster, Al Salam Residence Shams and Al Manal View. Multiple Al Mazaya developments are also identified in the vicinity, including Farah Tower 1, Farah Tower 2, Farah Tower 4, Farah Tower 5, and blocks titled Mazaya 1, 10A, 10B, 11, 12 and 13. More than forty schemes are registered near Liwan, reflecting the number of plotted developments and developers active across the wider area.

Developer

Belgravia Gardens is developed by Ellington Karma Developers. The project’s start date is 31 January 2025, and its scheduled completion date is 30 September 2028. Ellington Karma Developers is named as the developer for project number 3512, which is located in Liwan. The project comprises 743 units and has an active construction status, with 3.08% completion recorded at the 4 June 2026 inspection.

Registered transactions in Belgravia Gardens

Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.

706deals since 2025
17 107AED per m², median
0%resale, the rest bought from the developer
0%over the past year

The yearly figure compares the last 12 months with the 12 before them: calendar years would not work, the current one is unfinished. The district moved +8% over the same period, so the building lagged.

What buyers actually paid

TypeSize, m²Price, AEDPer m²Deals
Studio46774 82816 84425
1 bedroom721 266 82817 595286
2 bedrooms1011 729 82817 127330
3 bedrooms1602 693 82816 83664

Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.

Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.

FAQ

Who is the developer of Belgravia Gardens?
Belgravia Gardens is developed by Ellington Karma Developers.
Where is Belgravia Gardens located?
Belgravia Gardens is located in Liwan, within the DubaiLand masterplan.
What is the completion date for Belgravia Gardens?
The scheduled completion date is 30 September 2028.
What is the construction status of Belgravia Gardens?
The project is active. Construction progress was recorded at 3.08% on 4 June 2026.
How many units are planned at Belgravia Gardens?
Belgravia Gardens has 743 units.
What is the building configuration at Belgravia Gardens?
The project includes four buildings configured as basement, ground and six floors, plus one basement, ground and one-floor building.
When did construction start at Belgravia Gardens?
The project start date is 31 January 2025.
What is near Belgravia Gardens?
Liwan is across from Academic City and Dubai Silicon Oasis. Global Village is listed at 7.4 km from the community.
How can I buy an apartment in Belgravia Gardens?
Submit an enquiry via the form on this page or message us on WhatsApp — a Continental Club Property broker (RERA 31933) will help you choose a unit and send the brochure and payment plan.