by Shamal Holding in Downtown Dubai
Baccarat Hotel & Residences Dubai is a residential project by Shamal Holding in Downtown Dubai, Dubai, with prices from AED 20 155 607, handover Q2 2027, construction 18.1% complete per the DLD registry, 98 units.
Layouts and sizes
| Type | Size, sq.ft |
|---|---|
| 2 Bedroom | 2 142–2 970 |
| 3 Bedroom | 4 082–4 305 |
| 4 Bedroom | 5 511 |
| 4 Bedroom | 7 663–8 632 |
| 5 Bedroom | 9 181 |
| 4 Bedroom | 13 088 |
Floor plans
Payment plan 60/40
- Down payment5%
- During construction55%
- On handover40%
Construction progress
- StatusActive
- Construction started2023-03-20
- HandoverQ2 2027
- Status date02.06.2026
- Escrow bankEmirates NBD
- Scale2 bldg
- DLD project number2724
Data from the Dubai Land Department project registry (updated 07.08.2026 09:55).
Recent transactions
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 07.07.2026 | 3 BR | 422.9 | 19 500 000 |
| 06.07.2026 | 3 BR | 396.5 | 20 235 742 |
| 03.07.2026 | 3 BR | 421.9 | 19 986 189 |
| 17.06.2026 | 5 B/R | 875.8 | 53 000 000 |
| 01.06.2026 | 4 BR | 486.3 | 40 000 000 |
| 21.05.2026 | 3 BR | 383.7 | 28 300 000 |
| 18.05.2026 | 4 BR | 486.3 | 34 156 321 |
| 07.04.2026 | 4 BR | 934.5 | 57 448 926 |
| 06.04.2026 | 3 BR | 410.2 | 19 878 290 |
| 06.04.2026 | 3 BR | 425.4 | 19 458 191 |
| 06.04.2026 | 4 BR | 914.3 | 55 970 851 |
| 06.04.2026 | 3 BR | 433.7 | 19 243 741 |
| 02.04.2026 | 3 BR | 403.3 | 22 180 410 |
| 01.04.2026 | 4 BR | 820.1 | 45 506 000 |
| 01.04.2026 | 4 BR | 757.1 | 47 253 000 |
| 01.04.2026 | 4 BR | 1 230.8 | 121 841 000 |
| 01.04.2026 | 3 BR | 381.5 | 22 720 019 |
| 01.04.2026 | 3 BR | 384.7 | 24 030 475 |
| 31.03.2026 | 3 BR | 417.5 | 21 701 943 |
| 23.03.2026 | 5 B/R | 886.0 | 73 000 000 |
Dubai Land Department transaction registry, updated 2026-08-06. Explore Dubai property transactions →
Amenities
- Gymnasium
- Indoor Swimming Pool
- Hotel and Spa Facilities
- Yoga room
- Elegant Lobby
- Restaurants
- Children's Play Area
Places nearby
About the project
Baccarat Hotel & Residences Dubai is a two-building hotel and residences development in Downtown Dubai, developed by H&H Development with Shamal Holding. The 98-unit project is active, with construction recorded at 18.05% completion on 2 June 2026 and completion scheduled for 29 December 2026. It brings the Baccarat hotel and residence concept to Dubai, with architecture by Studio Libeskind and interiors by 1508 London.
The project and its architecture
Baccarat Hotel & Residences Dubai comprises two buildings configured as B2+G+44 and B2+G+27. The development combines a Baccarat hotel with private residences in Downtown Dubai. Studio Libeskind designed the architecture, using angular forms and glass façades that frame views of the Burj Khalifa. The design is intended to bring natural light into the building while establishing a distinct profile within the Downtown Dubai skyline. Baccarat Hotel & Residences Dubai is associated with Baccarat Hotels & Resorts, extending the Baccarat hospitality and residential concept to Dubai.
Interiors by 1508 London
The residences’ interiors are designed by 1508 London. The interior concept draws on Dubai’s cultural identity and the geometric architectural language of Studio Libeskind. Materials identified for the interiors include fabrics, marbles and crystal elements. The design combines a softer interior setting with the building’s angular exterior form. This approach forms part of the hotel-and-residences development, which places the Baccarat brand alongside architectural and interior design by separate specialist studios.
Downtown Dubai setting
The project is located in Downtown Dubai, the district centred on the Burj Khalifa and Dubai Mall. The development has views of the Burj Khalifa. The location map identifies Burj Khalifa, Dubai Opera, Emirates Towers, DIFC Gate Building, ICD Brookfield Place, Museum of the Future and Dubai Fountain among the area’s cultural and landmark destinations. Dubai Mall and CityWalk are identified as retail destinations, while Zuma, LPM Restaurant & Bar, La Cantine du Faubourg, Nammos and Coya are shown as dining destinations. Downtown Dubai also sits adjacent to Business Bay and within reach of DIFC.
Project scale and construction progress
The project has 98 units across its two buildings. Construction began on 20 March 2023. Its status is active, and the recorded construction completion ratio was 18.05% at the inspection dated 2 June 2026. The project completion date is 29 December 2026. The registered project area is 72,685.58 square metres. These details position Baccarat Hotel & Residences Dubai as an active development rather than a completed hotel and residence project.
Handover
Completion is scheduled for 29 December 2026. The project’s construction start date is 20 March 2023, and its active status was recorded alongside an 18.05% completion ratio on 2 June 2026. Buyers considering the project can assess it as a development under construction with a stated completion date in late 2026. The development includes 98 units distributed between two towers, one rising to 44 levels above ground and the other to 27 levels above ground, with two basement levels in each configuration.
The developer and project partners
H&H Development is identified as the developer of Baccarat Hotel & Residences Dubai, with Shamal Holding represented in the development. The project’s registered developer entity is BC Residences L.L.C. Studio Libeskind is responsible for the architecture and 1508 London for the interiors. Baccarat Hotels & Resorts is the hospitality brand associated with the hotel and residences concept. Together, these parties define the project’s development, architectural, interior and brand components.


































