Developer: OMNIYAT · Maritime City
Anwa Aria By Omniyat is a residential project by OMNIYAT in Maritime City, Dubai, with prices from AED 1 243 000, planned handover 31.01.2026, construction 84.9% complete per the DLD registry, 192 units, 163 DLD-registered sales since 2019.
| Type | Units | Typical size, sq.ft |
|---|---|---|
| Studio | 43 | 387–487 |
| 1 Bedroom | 66 | 828–976 |
| 2 Bedroom | 63 | 1 451–1 680 |
| 3 Bedroom | 17 | 2 408–6 553 |
| 4 Bedroom | 2 | 4 740–4 772 |
| Other units | 1 | 3 569 |
Size range excludes the smallest and largest 5% of units of each type.
All units are freehold. Data from the DLD registry.
The purchase price is split into these stages.
The exact schedule is confirmed in the sale agreement for the selected unit.
For UAE residents the down payment starts at 20% with terms up to 25 years. Indicative monthly payment for prices from 1 243 000 AED is 5 249 AED.
Estimates only; not a bank approval.
All Dubai projects handing over in 2026 →
Data from the Dubai Land Department project registry (updated 16.10.2026 09:55).
Pace: 3.61% per month. At this rate 100% falls on 04.02.2027.
The pace is calculated from the past year of inspections. It is an estimate, not a developer commitment. For reference: across 1,175 completed projects the median pace is 2.48% per month and the median build takes 40 months.
84 more photos in the DLD register
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: OMNIYAT · District: Maritime City
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 05.10.2026 | 2 BR | 154.4 | 4 322 880 |
| 05.10.2026 | 1 BR | 87.0 | 2 426 990 |
| 03.08.2026 | 2 BR | 144.6 | 4 291 280 |
| 23.06.2026 | 1 BR | 88.7 | 2 409 984 |
| 22.05.2026 | 2 BR | 147.1 | 4 416 860 |
| 12.05.2026 | 2 BR | 140.1 | 3 807 214 |
| 21.04.2026 | 2 BR | 156.4 | 4 648 000 |
| 21.04.2026 | 2 BR | 156.1 | 4 473 700 |
| 20.04.2026 | 2 BR | 154.4 | 4 544 000 |
| 03.04.2026 | 2 BR | 156.1 | 4 601 000 |
| 24.03.2026 | 2 BR | 154.4 | 4 525 000 |
| 18.02.2026 | 2 BR | 134.9 | 4 397 000 |
| 09.01.2026 | 2 BR | 154.4 | 4 488 400 |
| 12.12.2025 | Studio | 41.4 | 1 100 000 |
| 15.10.2025 | Studio | 35.5 | 1 243 913 |
| 07.10.2025 | 2 BR | 154.0 | 4 489 650 |
| 17.09.2025 | 2 BR | 147.3 | 4 551 000 |
| 15.08.2025 | 2 BR | 140.1 | 4 377 000 |
| 15.08.2025 | 1 BR | 90.6 | 2 998 000 |
| 29.07.2025 | 2 BR | 154.4 | 4 562 000 |
| 29.07.2025 | 2 BR | 144.6 | 4 481 000 |
| 29.07.2025 | 1 BR | 84.6 | 2 887 000 |
| 23.07.2025 | 2 BR | 156.1 | 4 619 000 |
| 26.06.2025 | Studio | 28.5 | 960 888 |
| 25.06.2025 | 2 BR | 154.6 | 4 605 000 |
| 19.06.2025 | Studio | 43.7 | 1 601 000 |
| 18.06.2025 | Studio | 42.8 | 1 190 000 |
| 16.06.2025 | Studio | 43.8 | 1 350 000 |
| 26.05.2025 | 1 BR | 87.3 | 2 570 740 |
| 26.05.2025 | 1 BR | 81.7 | 2 717 000 |
| 26.05.2025 | 1 BR | 82.2 | 2 638 000 |
| 14.05.2025 | Studio | 43.8 | 1 603 000 |
| 09.05.2025 | 1 BR | 84.6 | 2 909 000 |
| 05.05.2025 | 1 BR | 84.1 | 2 877 000 |
| 02.05.2025 | Studio | 41.0 | 1 477 000 |
| 22.04.2025 | 2 BR | 139.0 | 3 664 357 |
| 21.04.2025 | 1 BR | 87.6 | 2 706 000 |
| 21.04.2025 | 1 BR | 90.7 | 2 929 220 |
| 21.04.2025 | 2 BR | 154.6 | 4 815 488 |
| 18.04.2025 | 1 BR | 87.0 | 2 648 805 |
| 18.04.2025 | 1 BR | 90.7 | 2 815 540 |
| 18.04.2025 | 1 BR | 82.2 | 2 680 300 |
| 16.04.2025 | 1 BR | 84.2 | 2 512 143 |
| 10.04.2025 | 1 BR | 90.6 | 2 025 000 |
| 09.04.2025 | 2 BR | 145.0 | 4 645 000 |
| 24.03.2025 | 2 BR | 144.6 | 4 390 042 |
| 04.03.2025 | 1 BR | 82.2 | 2 361 294 |
| 04.03.2025 | 1 BR | 84.1 | 2 889 314 |
| 04.03.2025 | 1 BR | 77.3 | 2 094 152 |
| 04.03.2025 | Studio | 39.3 | 1 268 741 |
Dubai Land Department transaction registry, updated 15.10.2026. Explore Dubai property transactions →
Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.
The yearly figure compares the last 12 months with the 12 before them: calendar years would not work, the current one is unfinished. The district moved -1% over the same period, so the building matched it.
| Type | Size, m² | Price, AED | Per m² | Deals |
|---|---|---|---|---|
| Studio | 43 | 1 201 328 | 27 938 | 48 |
| 1 bedroom | 87 | 2 409 984 | 27 701 | 70 |
| 2 bedrooms | 143 | 4 322 880 | 30 230 | 44 |
Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.
From 2024 to 2026 — +7% on the price per square metre in this building. The district moved +30% over the same period, so the building lagged the market.
Top to bottom: purchase price per m², year, annual rent per m², gross yield.
All figures are medians. Years with fewer than eight deals are skipped; rent is shown where there are at least twenty contracts. The yield is gross — service charges are not published in the register.
* 2026 is still in progress and its bar covers part of the year. The growth figure above uses completed years.
Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.
DLD has recorded 163 sales in this building since 2019, 1 of them resales. We compare your unit with sales of the same layout here, not with asking prices. Free, reply within 24 hours.

Anwa Aria By Omniyat is a one-building residential tower project in Maritime City, with retail included in its planned configuration. OMNIYAT is the developer. The project is active and recorded at 84.86% completion following an inspection dated 30 September 2026.
Anwa Aria By Omniyat is registered as a 192-unit development in Maritime City. The project consists of one building and has a recorded total area of 24,862.94. Its start date is 14 August 2023, and its scheduled completion date is 31 January 2026. The development is active, with a completion ratio of 84.86% recorded on 30 September 2026. Maritime City is a purpose-built peninsula between Port Rashid and Dubai Dry Docks, developed as a maritime-focused commercial, industrial and residential district.
The planned building configuration is a tower comprising ground level, four podium levels and 32 floors, with retail within the project. The structure is designed as concrete construction with blockwork and internal and external finishes. The registered development comprises 192 units in a single building. This tower format places the project within Maritime City’s developing commercial and residential precinct, where residential and mixed-use towers are being delivered alongside retail, office and promenade elements.
Construction began on 14 August 2023. The project is recorded as active, and the completion ratio stands at 84.86% based on the 30 September 2026 inspection. The scheduled project completion date is 31 January 2026. The development’s active status and recorded progress relate to the project as a whole, which is registered as one building containing 192 units. Anwa Aria By Omniyat is identified under project number 2726.
Maritime City occupies a reclaimed peninsula between Port Rashid and Dubai Dry Docks. The district was launched in 2004 and covers 2.3 million square metres. It was planned as a specialised maritime cluster incorporating marine services, marine management, product marketing, marine research and education, recreation, and ship design and manufacturing. The district is divided between an operational Industrial Precinct and a Commercial Precinct that is being developed in phases. The Industrial Precinct includes ship lifts, ship repair plots, warehouses, workshops, retail and showrooms. The Commercial Precinct is intended to include retail, residences, offices and a promenade.
From Maritime City, Downtown Dubai and Dubai Mall are each 7.8 km away by road. Dubai International Financial Centre is 6.3 km away, Business Bay is 9.0 km away and Dubai International Airport is 10.1 km away. Mall of the Emirates is 17.8 km away, Palm Jumeirah is 21.4 km away and Dubai Marina is 24.2 km away. The nearest metro access is Green Line station G24, located 2,331 m from the centre of Maritime City. Reference driving times include 18 minutes to Dubai Mall, 20 minutes to Dubai International Airport, 30 minutes to Palm Jumeirah, 29 minutes to Burj Al Arab and 34 minutes to The Walk JBR.
Maritime City’s infrastructure programme includes underground sewerage, stormwater, water, fire, irrigation and telecom networks, with more than 90% of these utilities completed. The Industrial Precinct is complete and operational. Residential and mixed-use development in the wider district includes Coral Reef and Harbour Lights by Damac Properties, Nautica One and Nautica Two by Select Group, Oceanz by Danube, Riva Residence by Vakson Group, The Pier Residence by LMD Continental Investments, LIV Maritime, Franck Muller Yachting by London Gate and Hilton Residences Dubai Maritime City by Prestige One Developments.
OMNIYAT is the developer of Anwa Aria By Omniyat. The project is registered as a single-building, 192-unit development in Maritime City. Its project number is 2726, and the recorded construction start date is 14 August 2023. The scheduled completion date is 31 January 2026, while the latest stated inspection recorded 84.86% completion on 30 September 2026.
Dubai market as a whole: prices, transactions and trends (DLD data) →
We will send floor plans, the payment plan and available units for this project.
Project data comes from the Dubai Land Department (DLD) registry.
Every figure carries its origin: “DLD registry” is taken from the Dubai Land Department register, “Developer supplied” is stated by the developer, “Our calculation” is computed by us from the first two. Developer prices change without notice — confirm before you commit. Methodology
Machine-readable mirrors of this page: Markdown · JSON. They carry the same figures as this page, each with its origin labelled.
How to cite:Anwa Aria By Omniyat — Continental Club Property, from Dubai Land Department registry and developer data, 2026-10-01, https://continentalclub.ae/project/anwa-aria-by-omniyat-maritime-city/