by Deyaar in Maritime City
Mar Casa is a residential project by Deyaar in Maritime City, Dubai, with handover 31.10.2026, construction 56.5% complete per the DLD registry.
Construction progress
- Handover31.10.2026
- Status date04.08.2026
- DLD project number2589
Data from the Dubai Land Department project registry (updated 08.08.2026 10:48).
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: Deyaar · District: Maritime City
Recent transactions
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 14.07.2026 | 1 BR | 71.3 | 1 400 000 |
| 13.07.2026 | 1 BR | 70.4 | 1 590 000 |
| 10.07.2026 | Studio | 35.6 | 808 535 |
| 30.06.2026 | 3 BR | 191.0 | 3 580 000 |
| 25.06.2026 | 2 BR | 114.7 | 2 590 000 |
| 13.04.2026 | 1 BR | 69.5 | 1 500 000 |
| 18.03.2026 | 1 BR | 68.8 | 1 600 000 |
| 25.02.2026 | 2 BR | 107.2 | 2 236 000 |
| 17.02.2026 | 2 BR | 116.5 | 2 407 872 |
| 10.02.2026 | 3 BR | 180.2 | 3 100 000 |
| 05.02.2026 | 3 BR | 348.0 | 3 000 000 |
| 03.02.2026 | 4 BR | 541.4 | 14 000 000 |
| 14.01.2026 | 2 BR | 108.7 | 2 200 000 |
| 24.12.2025 | 2 BR | 104.5 | 2 450 000 |
| 24.12.2025 | 2 BR | 108.2 | 1 986 860 |
| 15.12.2025 | 2 BR | 129.4 | 2 700 000 |
| 01.12.2025 | Studio | 35.6 | 890 000 |
| 25.11.2025 | 3 BR | 285.5 | 5 813 600 |
| 21.11.2025 | 1 BR | 70.4 | 1 500 000 |
| 21.11.2025 | 1 BR | 71.0 | 1 520 000 |
Dubai Land Department transaction registry, updated 2026-08-07. Explore Dubai property transactions →
Places nearby
About the project
Mar Casa is a retail and residential building development by Deyaar Development in Maritime City. The single-building project has 585 units and is active, with a recorded completion ratio of 48.23% as of 4 May 2026. Its completion date is 31 October 2026.
A single-building residential development
Mar Casa is planned as one building with retail and residential components. The building configuration is G+M+4P+an amenities floor+46 floors+roof, creating a vertically arranged development with dedicated levels for parking and resident facilities. The project has a recorded total area of 61,389.03 and contains 585 units. Construction began on 1 September 2023, and the project remains active. The development sits within Maritime City, a purpose-built peninsula between Port Rashid and Dubai Dry Docks. Maritime City combines industrial, commercial and residential uses, with its commercial precinct continuing to develop in phases.
Building layout and project scale
The development’s stated structure begins with a ground level and mezzanine, followed by four parking levels. An amenities floor sits below 46 further floors and a roof level. This layout places the project’s resident facilities within the building rather than in a separate amenity structure. Mar Casa contains 585 units in total, all within its single building. The project’s retail and residential format forms part of the growing commercial and residential side of Maritime City, where completed and under-construction towers are being developed alongside the established industrial precinct.
Resident amenities
Mar Casa includes a swimming pool, gymnasium, multipurpose sports court and residents lounge. These facilities are incorporated into the project’s amenities provision, with a dedicated amenities floor included in the building configuration. The swimming pool and gymnasium provide on-site leisure and fitness facilities, while the multipurpose sports court adds a separate activity space. The residents lounge is planned as a communal indoor facility. Retail is also included within the building’s development type, alongside the residential component.
Maritime City setting
Mar Casa is located in Maritime City, a maritime-focused commercial and industrial zone built on reclaimed land. The district lies between Port Rashid and Dubai Dry Docks and covers 2.3 million square metres. Its masterplan identifies marine services, marine management, product marketing, marine research and education, recreation, and ship design and manufacturing as target sectors. Maritime City is divided between an operational Industrial Precinct and a Commercial Precinct that is being developed in phases. The Industrial Precinct contains ship lifts, ship repair plots, warehouses, workshops, supporting retail and showrooms. The Commercial Precinct is intended to include retail, residential space, offices and a promenade.
Connections from Maritime City
Reference driving distances from the centre of Maritime City place Burj Khalifa and Downtown Dubai at 7.8 km, with The Dubai Mall also at 7.8 km. Dubai International Financial Centre is 6.3 km away, Business Bay is 9.0 km away and Dubai International Airport is 10.1 km away. Mall of the Emirates is 17.8 km away, Palm Jumeirah is 21.4 km away and Dubai Marina is 24.2 km away. The nearest Dubai Metro station is Green Line station G24, 2,331 m from the centre of Maritime City. It is not considered walkable from the development’s centre.
Construction progress and completion
Mar Casa started on 1 September 2023 and has a completion date of 31 October 2026. The project was recorded as active, with construction at 48.23% complete following an inspection dated 4 May 2026. The development consists of one building and 585 units. Its planned completion date aligns with the recorded project end date of 31 October 2026. The building’s programme includes its ground level, mezzanine, four parking levels, amenities floor, 46 floors and roof level.
The developer
Mar Casa is developed by Deyaar Development. The company is named as the developer for the 585-unit project in Maritime City. Deyaar Development’s Mar Casa is a single-building retail and residential development with a swimming pool, gymnasium, multipurpose sports court and residents lounge. Construction commenced on 1 September 2023, and the project’s completion date is set for 31 October 2026.





























