Developer: H&H Development · Jumeirah 2

Aman Residences Dubai

Aman Residences Dubai is a residential project by H&H Development in Jumeirah 2, Dubai, with handover Q4 2028, construction 0.9% complete per the DLD registry, 82 units, 32 DLD-registered sales since 2025.

Unit types2–6 BR3 824–36 627 ft²DLD registry
HandoverQ4 2028Developer supplied
Construction0.9%DLD registry · checked 10.08.2026

Layouts and sizes

TypeUnitsTypical size, sq.ft
2 Bedroom283 824–3 826
3 Bedroom275 944
4 Bedroom117 208–8 601
5 Bedroom149 884–36 627
6 Bedroom231 201

Size range excludes the smallest and largest 5% of units of each type.

All units are freehold. Data from the DLD registry.

Mortgage for this project

For UAE residents the down payment starts at 20% with terms up to 25 years. Estimate your payment and purchase costs for your budget.

Calculate mortgage

Estimates only; not a bank approval.

Handover date & construction progress

0.92%
  • Construction started12.07.2025
  • HandoverQ4 2028
  • Status date10.08.2026
  • Progress between DLD inspections+0.9% (24.04.2026 → 10.08.2026)
  • Escrow bankEmirates NBD
  • Scale3 bldg
  • DLD project number3461

Data from the Dubai Land Department project registry (updated 16.10.2026 09:55).

Inspection history 2
025507510024.04.202610.08.2026
Actual, per inspections

Pace: 0.25% per month. At this rate 100% falls on 27.02.2059.

The pace is calculated from the past year of inspections. It is an estimate, not a developer commitment. For reference: across 1,175 completed projects the median pace is 2.48% per month and the median build takes 40 months.

Construction progress 11
10.08.2026 0.92%
Aman Residences Dubai, Jumeirah 2 construction progress — 10 August 2026, 0.92% complete, photo 1 of 5Aman Residences Dubai, Jumeirah 2 construction progress — 10 August 2026, 0.92% complete, photo 2 of 5Aman Residences Dubai, Jumeirah 2 construction progress — 10 August 2026, 0.92% complete, photo 3 of 5Aman Residences Dubai, Jumeirah 2 construction progress — 10 August 2026, 0.92% complete, photo 4 of 5Aman Residences Dubai, Jumeirah 2 construction progress — 10 August 2026, 0.92% complete, photo 5 of 5
24.04.2026 0.02%
Aman Residences Dubai, Jumeirah 2 construction progress — 24 April 2026, 0.02% complete, photo 1 of 6Aman Residences Dubai, Jumeirah 2 construction progress — 24 April 2026, 0.02% complete, photo 2 of 6Aman Residences Dubai, Jumeirah 2 construction progress — 24 April 2026, 0.02% complete, photo 3 of 6Aman Residences Dubai, Jumeirah 2 construction progress — 24 April 2026, 0.02% complete, photo 4 of 6Aman Residences Dubai, Jumeirah 2 construction progress — 24 April 2026, 0.02% complete, photo 5 of 6Aman Residences Dubai, Jumeirah 2 construction progress — 24 April 2026, 0.02% complete, photo 6 of 6

Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.

Recent transactions

DateTypeSize, m²Price, AED
10.08.20262 BR355.357 555 304
10.08.20262 BR355.554 736 514
22.07.20265 B/R931.0166 077 188
29.04.20263 BR552.283 188 690
27.04.20262 BR355.549 074 116
21.04.20263 BR552.370 041 472
10.04.20265 B/R931.0171 036 254
09.04.20262 BR355.554 250 000
06.04.20264 BR552.270 238 323
06.04.20262 BR355.358 253 515
02.04.20263 BR552.279 496 805
30.03.20262 BR355.355 668 244
27.03.20263 BR552.370 041 472
27.03.20263 BR552.276 801 998
26.03.20266 B/R2 898.6356 232 500
18.03.20262 BR355.348 120 008
09.03.20262 BR355.553 167 196
05.03.20266 B/R2 898.6422 000 000
02.02.20263 BR552.371 563 574
02.02.20262 BR355.350 670 521
23.12.20252 BR355.348 827 957
04.12.20254 BR799.0144 764 122
25.11.20253 BR552.280 840 333
03.09.20253 BR552.283 490 836
28.07.20255 B/R931.0167 754 736
28.07.20255 B/R931.0173 640 867
25.07.20253 BR552.272 888 825
09.06.20253 BR552.374 214 077
09.06.20253 BR552.376 864 579
09.06.20254 BR787.1125 797 699
09.06.20252 BR355.549 749 239
09.06.20253 BR552.275 539 328

Dubai Land Department transaction registry, updated 15.10.2026. Explore Dubai property transactions →

Registered transactions in Aman Residences Dubai

Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.

32deals since 2025
145 586AED per m², median
0%resale, the rest bought from the developer
+4%over the past year

What buyers actually paid

TypeSize, m²Price, AEDPer m²Deals
2 bedrooms35553 167 196149 76711
3 bedrooms55276 801 998139 13412

Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.

Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.

How much is your property in Aman Residences Dubai worth?

DLD has recorded 32 sales in this building since 2025. We compare your unit with sales of the same layout here, not with asking prices. Free, reply within 24 hours.

By submitting the form you agree to the processing of your contact details, including for advertising analytics.

Places nearby

🧸 Small World Nursery · 1.2 km🧸 The Little Dreamers Nursery · 1.8 km🧸 Royal Beach Nursery · 1.8 km🧸 Ladybird Nursery · 2.2 km🧸 Green Grass Nursery Jumeirah · 2.2 km
Aman Residences Dubai

About the project

Aman Residences Dubai is an 82-unit residential project by H&H Development in Jumeirah 2. The development combines two residential towers with four villas. It is active, with a reported completion ratio of 2% following an inspection dated 24 April 2026, and completion is scheduled for 31 December 2028.

The project configuration

Aman Residences Dubai is planned as a two-tower and villa development in Jumeirah 2. The current project total is 82 units across a site area of 61,908.92. Tower 1 is configured as B+G+P+30+R and includes 38 units plus one penthouse. Tower 2 is configured as B+G+P+26+R and includes 30 units plus one penthouse. The project also includes four villas, each configured as G+3. This brings tower residences, penthouses and villas together within one development in a district otherwise characterised predominantly by villas and low-rise housing.

Towers, penthouses and villas

The residential configuration at Aman Residences Dubai provides three distinct building components: Tower 1, Tower 2 and four villas. Tower 1 rises to 30 levels above its B+G+P structure, while Tower 2 rises to 26 levels above its B+G+P structure. Each tower includes a rooftop level denoted by R and one penthouse. The villas form a separate part of the project and are designed over ground plus three floors. The specified tower inventory comprises 38 units and one penthouse in Tower 1, alongside 30 units and one penthouse in Tower 2.

Jumeirah 2 setting

Aman Residences Dubai is located in Jumeirah 2, a residential subcommunity within the wider Jumeirah district. Jumeirah 2 is defined by established streets, villa-led development and low-rise residential compounds rather than clusters of high-rise towers. The Dubai Water Canal runs through the southern part of the district. Jumeirah Street and Wasl Road run north to south through the area, providing road connections as well as retail and service frontages. Independent shops, cafés and clinics are located along the main roads, while the district occupies a central position between Old Dubai and New Dubai.

Road access and city destinations

Jumeirah Street and Wasl Road provide direct road access from Jumeirah 2. Business Bay is 2.7 km away, while Burj Khalifa and Downtown Dubai are 3.3 km away. The Dubai Mall is 3.9 km from the district and DIFC is 4.4 km away. Mall of the Emirates is 9.7 km away, Palm Jumeirah is 13.9 km away and Dubai International Airport is 14.0 km away. Al Maktoum International Airport is 34.4 km from Jumeirah 2. These distances place the project’s district close to central business, retail and airport destinations by road.

Local services and schools

The established streets of Jumeirah 2 include independent shops, cafés and clinics along Jumeirah Street and Wasl Road. The Dubai Water Canal forms part of the district’s southern area. JSS Private School LLC is 1.2 km from Jumeirah 2, and Horizon English School Dubai is 1.3 km away. The district’s prevailing housing pattern is made up of individual villas and small residential compounds, with spacious plots and mature streets. Aman Residences Dubai introduces a two-tower and villa configuration within this low-density setting.

Public transport access

The nearest metro access from the centre of Jumeirah 2 is Red Line station R26, located 2,028 metres away. The station is beyond comfortable walking distance for daily commuting. Jumeirah Street and Wasl Road are the principal north-to-south roads serving the district, supporting access by car or taxi. The project’s location in Jumeirah 2 also places it 3.3 km from Downtown Dubai, 3.9 km from The Dubai Mall and 2.7 km from Business Bay. These road-linked destinations sit within the wider central Dubai area.

Construction status and completion

Construction at Aman Residences Dubai started on 12 July 2025. The project is active and had reached a completion ratio of 2% at the inspection dated 24 April 2026. Its scheduled completion date is 31 December 2028. The development is registered under project number 3461. The current project information identifies 82 total units and a total area of 61,908.92. H&H Development is the developer of Aman Residences Dubai.

Frequent questions

Who is the developer of Aman Residences Dubai?
Aman Residences Dubai is being developed by H&H Development.
Where is Aman Residences Dubai located?
The project is located in Jumeirah 2, within the wider Jumeirah district of Dubai.
What is the completion status of Aman Residences Dubai?
The project is active and had a reported completion ratio of 2% at the inspection dated 24 April 2026.
When is Aman Residences Dubai scheduled for completion?
The scheduled completion date is 31 December 2028.
How many units are planned at Aman Residences Dubai?
The project has 82 total units.
What buildings are included in Aman Residences Dubai?
The development includes two residential towers and four G+3 villas. Each tower includes one penthouse.
How close is Jumeirah 2 to Downtown Dubai?
Downtown Dubai and Burj Khalifa are 3.3 km from Jumeirah 2. The Dubai Mall is 3.9 km away.
What schools are near Jumeirah 2?
JSS Private School LLC is 1.2 km away and Horizon English School Dubai is 1.3 km away.
What is the nearest metro station to Jumeirah 2?
Red Line station R26 is the nearest metro access, located 2,028 metres from the centre of Jumeirah 2.
How can I buy an apartment in Aman Residences Dubai?
Submit an enquiry via the form on this page or message us on WhatsApp — a Continental Club Property broker (RERA 31933) will help you choose a unit and send the brochure and payment plan.

Nearby projects

Get the presentation and prices

We will send floor plans, the payment plan and available units for this project.

By submitting the form you agree to the processing of your contact details, including for advertising analytics.

Project data comes from the Dubai Land Department (DLD) registry.

Every figure carries its origin: “DLD registry” is taken from the Dubai Land Department register, “Developer supplied” is stated by the developer, “Our calculation” is computed by us from the first two. Developer prices change without notice — confirm before you commit. Methodology

For AI agents and researchers

Machine-readable mirrors of this page: Markdown · JSON. They carry the same figures as this page, each with its origin labelled.

How to cite:Aman Residences Dubai — Continental Club Property, from Dubai Land Department registry and developer data, 2026-10-01, https://continentalclub.ae/project/aman-residences-dubai-jumeirah-2/