Developer: Wadi Hills City Real Estate Development · DubaiLand Residence Complex

Wadi Hills

Wadi Hills is a residential project by Wadi Hills City Real Estate Development in DubaiLand Residence Complex, Dubai, with prices from AED 682 000, handover Q1 2028, construction 7.7% complete per the DLD registry, 131 apartments, 59 sold to first buyers per the DLD register (as of 19 Nov 2026).

Price fromAED 682 000Our calculation
Unit typesStudio · 1–3 BR372–1 477 ft²Developer supplied
HandoverQ1 2028Developer supplied
Construction7.7%DLD registry · checked 14.09.2026
≈72 of 131 apartments still available · DLD, 19 Nov
★ 5.0 on Google · 7 reviews

Layouts and sizes

TypeBedroomsSize, sq.ft
Studiostudio372–418
One-bedroom apartments1667–734
Two-bedroom apartments21 093
Three-bedroom apartments31 423–1 477

Balcony or terrace per the DLD registry: almost every residential unit (100%). Typical size: Studio — ~67 sq.ft (6.2 m²); 1 Bedroom — ~105 sq.ft (9.8 m²); 3 Bedroom — ~394 sq.ft (37 m²). Median of registered units; for villas and townhouses the registry includes terraces and open areas.

Unit availability · DLD data as of 19 Nov 2026

≈72 of 131 apartments available

Sold to first buyers 59 (45%)Available ≈72

TypeTotalSoldAvailable
Studios482226
1 bedroom591742
2 bedrooms101
3 bedrooms23203
Total1315972

Sales data comes from the official Dubai Land Department (DLD) register. Please confirm actual availability with our sales team — leave a request.

Tap an apartment type in the table to add it to your request.

By submitting the form you agree to the processing of your contact details, including for advertising analytics.

“Available” means units without a registered sale; resales are excluded.

Compare with similar projects

A broker will compare this project with 3 similar ones: prices, handover dates and payment plans.

Compare in WhatsApp

Handover date & construction progress

7.72%
  • Construction started01.11.2025
  • HandoverQ1 2028
  • Status date14.09.2026
  • Progress between DLD inspections+5.11% (04.06.2026 → 14.09.2026)
  • Escrow bankSharjah Islamic Bank
  • DLD project number4100

Data from the Dubai Land Department project registry (updated 20.11.2026 05:55).

Inspection history 4
025507510022.09.202514.09.2026
Actual, per inspections

Pace: 0.66% per month. At this rate we do not project a completion date: it falls more than 10 years out.

The pace is calculated from the past year of inspections. It is an estimate, not a developer commitment. For reference: across 1,175 completed projects the median pace is 2.48% per month and the median build takes 40 months.

Construction progress 80
14.09.2026 7.72%
Wadi Hills, DubaiLand Residence Complex construction progress — 14 September 2026, 7.72% complete, photo 1 of 20Wadi Hills, DubaiLand Residence Complex construction progress — 14 September 2026, 7.72% complete, photo 2 of 20Wadi Hills, DubaiLand Residence Complex construction progress — 14 September 2026, 7.72% complete, photo 3 of 20Wadi Hills, DubaiLand Residence Complex construction progress — 14 September 2026, 7.72% complete, photo 4 of 20Wadi Hills, DubaiLand Residence Complex construction progress — 14 September 2026, 7.72% complete, photo 5 of 20Wadi Hills, DubaiLand Residence Complex construction progress — 14 September 2026, 7.72% complete, photo 6 of 20Wadi Hills, DubaiLand Residence Complex construction progress — 14 September 2026, 7.72% complete, photo 7 of 20Wadi Hills, DubaiLand Residence Complex construction progress — 14 September 2026, 7.72% complete, photo 8 of 20Wadi Hills, DubaiLand Residence Complex construction progress — 14 September 2026, 7.72% complete, photo 9 of 20Wadi Hills, DubaiLand Residence Complex construction progress — 14 September 2026, 7.72% complete, photo 10 of 20Wadi Hills, DubaiLand Residence Complex construction progress — 14 September 2026, 7.72% complete, photo 11 of 20Wadi Hills, DubaiLand Residence Complex construction progress — 14 September 2026, 7.72% complete, photo 12 of 20Wadi Hills, DubaiLand Residence Complex construction progress — 14 September 2026, 7.72% complete, photo 13 of 20Wadi Hills, DubaiLand Residence Complex construction progress — 14 September 2026, 7.72% complete, photo 14 of 20Wadi Hills, DubaiLand Residence Complex construction progress — 14 September 2026, 7.72% complete, photo 15 of 20Wadi Hills, DubaiLand Residence Complex construction progress — 14 September 2026, 7.72% complete, photo 16 of 20Wadi Hills, DubaiLand Residence Complex construction progress — 14 September 2026, 7.72% complete, photo 17 of 20Wadi Hills, DubaiLand Residence Complex construction progress — 14 September 2026, 7.72% complete, photo 18 of 20Wadi Hills, DubaiLand Residence Complex construction progress — 14 September 2026, 7.72% complete, photo 19 of 20Wadi Hills, DubaiLand Residence Complex construction progress — 14 September 2026, 7.72% complete, photo 20 of 20
04.06.2026 2.61%
Wadi Hills, DubaiLand Residence Complex construction progress — 4 June 2026, 2.61% complete, photo 1 of 16Wadi Hills, DubaiLand Residence Complex construction progress — 4 June 2026, 2.61% complete, photo 2 of 16Wadi Hills, DubaiLand Residence Complex construction progress — 4 June 2026, 2.61% complete, photo 3 of 16Wadi Hills, DubaiLand Residence Complex construction progress — 4 June 2026, 2.61% complete, photo 4 of 16Wadi Hills, DubaiLand Residence Complex construction progress — 4 June 2026, 2.61% complete, photo 5 of 16Wadi Hills, DubaiLand Residence Complex construction progress — 4 June 2026, 2.61% complete, photo 6 of 16Wadi Hills, DubaiLand Residence Complex construction progress — 4 June 2026, 2.61% complete, photo 7 of 16Wadi Hills, DubaiLand Residence Complex construction progress — 4 June 2026, 2.61% complete, photo 8 of 16Wadi Hills, DubaiLand Residence Complex construction progress — 4 June 2026, 2.61% complete, photo 9 of 16Wadi Hills, DubaiLand Residence Complex construction progress — 4 June 2026, 2.61% complete, photo 10 of 16Wadi Hills, DubaiLand Residence Complex construction progress — 4 June 2026, 2.61% complete, photo 11 of 16Wadi Hills, DubaiLand Residence Complex construction progress — 4 June 2026, 2.61% complete, photo 12 of 16Wadi Hills, DubaiLand Residence Complex construction progress — 4 June 2026, 2.61% complete, photo 13 of 16Wadi Hills, DubaiLand Residence Complex construction progress — 4 June 2026, 2.61% complete, photo 14 of 16Wadi Hills, DubaiLand Residence Complex construction progress — 4 June 2026, 2.61% complete, photo 15 of 16Wadi Hills, DubaiLand Residence Complex construction progress — 4 June 2026, 2.61% complete, photo 16 of 16

44 more photos in the DLD register

Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.

Registered transactions in Wadi Hills

Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.

61DLD registrations incl. resales, since 2025
16 644AED per m², median
3%resale, the rest bought from the developer

What buyers actually paid

TypeSize, m²Price, AEDPer m²Deals
Studio36726 00020 16722
1 bedroom661 064 28016 12517
3 bedrooms1371 595 00011 64220

Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.

Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.

Recent transactions

DateTypeSize, m²Price, AED
25.06.20261 BR65.71 064 280
25.06.20263 BR137.31 558 200
25.06.20263 BR137.31 644 000
24.06.20263 BR132.21 572 000
23.06.20263 BR137.31 715 000
23.06.20263 BR137.31 764 000
23.06.2026Studio37.1734 000
23.06.2026Studio37.1732 000
23.06.20263 BR137.31 636 000
23.06.20263 BR137.51 552 000
23.06.20263 BR137.31 588 580
23.06.20263 BR137.31 612 000
23.06.20263 BR137.31 605 000
22.06.20263 BR132.21 595 000
22.06.20263 BR132.21 543 410
22.06.20263 BR137.31 596 000
18.05.20263 BR132.21 553 000
28.04.20263 BR132.21 564 000
23.04.20263 BR132.21 604 000
10.04.20263 BR132.21 548 000
30.03.20263 BR132.21 611 000
30.03.20263 BR132.21 580 000
30.03.20263 BR132.21 588 000
17.03.2026Studio36.2716 000
17.03.20261 BR61.81 074 000
16.03.2026Studio39.0763 420
09.03.20261 BR65.91 127 000
25.02.20261 BR65.91 089 000
25.02.20261 BR65.91 096 000
25.02.20261 BR68.3975 100
25.02.2026Studio34.3682 000
25.02.2026Studio34.3664 440
05.02.20261 BR61.81 032 000
29.01.2026Studio39.0776 000
29.01.20261 BR68.31 031 000
29.01.20261 BR68.31 005 000
29.01.2026Studio39.0770 000
29.01.2026Studio36.2712 000
29.01.20261 BR63.41 090 000
29.01.2026Studio34.3685 000
29.01.2026Studio37.3744 000
29.01.20261 BR61.81 036 000
29.01.2026Studio34.3676 000
29.01.20261 BR68.31 016 260
20.01.20261 BR68.3987 000
05.01.2026Studio36.2726 000
23.12.20251 BR65.91 102 000
22.12.2025Studio37.3745 000
22.12.2025Studio34.3687 000
22.12.20251 BR65.91 109 790

Dubai Land Department transaction registry, updated 20.11.2026. Explore Dubai property transactions →

Mortgage for this project

For UAE residents the down payment starts at 20% with terms up to 25 years. Indicative monthly payment for prices from 682 000 AED is 2 880 AED.

Calculate mortgage

Estimates only; not a bank approval.

Amenities

  • Rooftop pool
  • Gym and wellness area
  • Concierge and lobby
  • Smart-home entry

Your broker for this project

Vladimir Malin

Vladimir Malin

Senior Broker · Continental Club Property · RERA ORN 31933

Answers questions about Wadi Hills: current availability, payment plan, DLD registration. English and Russian.

Get the presentation and prices

We will send floor plans, the payment plan and available units for this project.

By submitting the form you agree to the processing of your contact details, including for advertising analytics.

Project data comes from the Dubai Land Department (DLD) registry.

Every figure carries its origin: “DLD registry” is taken from the Dubai Land Department register, “Developer supplied” is stated by the developer, “Our calculation” is computed by us from the first two. Developer prices change without notice — confirm before you commit. Methodology

About the project

Wadi Hills is an active residential development by Wadi Hills City Real Estate Development in DubaiLand Residence Complex, within Wadi Al Safa 5. The project comprises one residential building configured as basement, ground floor and 11 upper floors. Its recorded completion stood at 7.72% on 14 September 2026, with completion scheduled for 31 January 2028.

Project configuration

Wadi Hills is planned as a single residential building with a basement, ground floor and 11 upper floors. The project is identified by project number 4100 and has a reported total area of 8,818.88. It is located in DubaiLand Residence Complex, which is a residential community within the Wadi Al Safa 5 area. The development’s planned start date is 1 November 2025 and its scheduled completion date is 31 January 2028. The wider community contains multiple residential buildings as well as newer construction plots, placing the project within an established and expanding residential setting in the wider DubaiLand cluster.

DubaiLand Residence Complex setting

DubaiLand Residence Complex is a planned residential development in DubaiLand, administered within Wadi Al Safa 5. It lies north-west of central Dubai at coordinates 25.091311, 55.378277. The community combines mid-rise residential projects with landscaped areas, road improvements and pavements. Community green areas and landscaped roundabouts form part of the district’s public realm. Wadi Hills is therefore positioned in a residential neighbourhood rather than in a standalone development zone. The district also includes a mix of existing apartment buildings and plots under development, with road connections serving the wider DubaiLand area.

Parks and outdoor facilities in the community

DubaiLand Residence Complex includes two mid-sized parks in each half of the community, together with smaller parks on its periphery. These park areas include sports facilities and children’s play areas. Landscaped roundabouts and junctions contribute further green coverage across the district. The community’s public spaces are distributed through its central and peripheral areas, alongside its residential buildings and road network. These facilities form part of the wider DubaiLand Residence Complex setting for Wadi Hills. The project’s location also places it within a community where landscaping, local parks and organised streets are established features of the neighbourhood.

Nearby destinations

Global Village is 7.6 km from DubaiLand Residence Complex. The Dubai Mall is 15.4 km away, while Business Bay is 15.5 km away. Burj Khalifa and Downtown Dubai are 15.7 km from the community, and Dubai International Financial Centre is 16.5 km away. Dubai International Airport is 18.0 km away, with Mall of the Emirates at 18.1 km. Dubai Marina is 24.0 km from the district. These distances place Wadi Hills within the DubaiLand area while maintaining road connections to major retail, business, leisure and airport destinations across Dubai.

Schools and road travel

The Aquila School is 0.4 km from DubaiLand Residence Complex, and GEMS FirstPoint School is 0.6 km away. Road travel is the main transport option for the community. The nearest Green Line metro station, G30, is 14.6 km away and is not within walking distance. Within the community, on-street parking has been fully allocated, with a charge of AED 3 per hour where applicable. Main junction and streetscape improvements in the district are complete or in their final stages. The road layout, local schools and community facilities form part of the immediate setting around Wadi Hills.

Construction status and scheduled completion

Wadi Hills is recorded as active. Its construction completion ratio was 7.72% at the inspection dated 14 September 2026. The project schedule begins on 1 November 2025 and sets completion for 31 January 2028. The status and completion ratio were retained in the update dated 12 June 2026. The development has 131 apartments. Its project number is 4100, which is also used for its development record. These dates and progress figures provide the current recorded construction position and the scheduled completion point for the project.

Residences and amenities

HRE presents Wadi Hills as a residential building in Wadi Al Safa 5, within Dubailand Residence Complex, with studios and one- to three-bedroom apartments from about 369 to 1,436 sq ft. Residents get a rooftop pool, a gym and wellness area, a concierge lobby and smart-home entry. At launch, the developer listed prices from about AED 659,000. According to HRE, Arabian Ranches and Nad Al Sheba are about 7 minutes away by car, Meydan about 12 minutes, Downtown Dubai about 15 minutes and Dubai International Airport about 18 minutes. The developer gives Q1 2028 for handover. For current prices and the payment plan, contact a Continental Club Property broker (RERA 31933).

Service charge: what to expect

The building is still under construction, so it has no RERA-approved budget yet — that comes after handover. The figures below are what already-completed buildings in the area pay.

Area median13.86 AEDper sq ft per year · 149 AED/m²
Range in the area4.51 – 19.01AED per sq ft · 28 buildings
A 1,000 sq ft unit≈ 13,860 AEDper year at the median · ≈ $3,774
vs Dubai median▼ -13.5%Dubai 16.02 AED/sq ft

Check the charge for a specific building →

Median across 28 completed buildings in DubaiLand Residence Complex for 2026, from the DLD service charge index (Mollak). This is an area benchmark, not this project’s rate: RERA approves that after handover and it may land either side of the median.

Frequent questions

Who is the developer of Wadi Hills?
Wadi Hills is developed by Wadi Hills City Real Estate Development.
Where is Wadi Hills located?
The project is in DubaiLand Residence Complex, within Wadi Al Safa 5 in the wider DubaiLand area.
What is the building configuration at Wadi Hills?
The project is planned as one residential building with a basement, ground floor and 11 upper floors.
When is the Wadi Hills handover date?
Wadi Hills handover (completion) is scheduled for Q1 2028 (developer data). The DLD register lists 31 January 2028. Construction progress was 7.72% at the DLD inspection of 14 September 2026. The date and progress on this page are updated from the DLD register. For current availability, prices and resale (assignment) options, send an enquiry on this page.
What is the construction status of Wadi Hills?
The project is active. Completion was recorded at 7.72% on 14 September 2026.
How many units does Wadi Hills have?
The development has 131 apartments.
What is near Wadi Hills?
Global Village is 7.6 km away, while The Aquila School and GEMS FirstPoint School are 0.4 km and 0.6 km from the community respectively.
How far is Downtown Dubai from Wadi Hills?
Burj Khalifa and Downtown Dubai are 15.7 km from DubaiLand Residence Complex.
What public transport is closest to the project?
The nearest Green Line metro station, G30, is 14.6 km from the community.
How many apartments are left in Wadi Hills?
According to the Dubai Land Department (DLD) register, as of 19 Nov 2026 ≈72 of 131 apartments in Wadi Hills have no registered sale; 59 have been sold to first buyers (45%). This is registry data, not a developer availability list: please confirm current availability and prices with our sales team — leave a request on this page.
How can I buy an apartment in Wadi Hills?
Submit an enquiry via the form on this page or message us on WhatsApp — a Continental Club Property broker (RERA 31933) will help you choose a unit and send the brochure and payment plan.

Estimate a unit in this building from DLD sales

Based on 50 registered DLD sales in Wadi Hills between 22 Dec 2025 and 25 Jun 2026: median 15 646 AED/m² (1 454 AED/sq ft); half of the deals fell between 11 957 and 19 655 AED/m². This is transaction statistics, not a valuation of a specific unit: floor, view, finish and condition move the price.

TypeIndicative priceDealsMedian AED/m²Median area, m²
StudioAED 717 0001519 80036.2
1 BRAED 1 097 0001516 64465.9
3 BRAED 1 597 0002011 859134.7
Get an exact valuation

Source: Dubai Land Department open data, the latest up to 50 sales in the building; areas as registered; refreshed daily. Deals outside 3,000–200,000 AED/m² are excluded.

PDF shortlist · updated 1 November 2026

DubaiLand Residence Complex: new projects and prices

30 projects · prices from DLD and developers

  1. Ag 7even Ag 7even DubaiLand Residence Complex · Studio, 1–2 BR from AED 485,000
  2. Ag 9ine Ag 9ine DubaiLand Residence Complex · Studio, 1–2 BR from AED 488,000
  3. Time 3 Time 3 DubaiLand Residence Complex · Studio, 1–3 BR from AED 490,000

27 more in the PDF: prices, handover dates, payment plans

The PDF opens instantly. Refreshed monthly from DLD data.

How much is your property in Wadi Hills worth?

59 of 131 apartments have been sold to first buyers per the DLD register. DLD registrations, including resales: 61 (since 2025). We compare your unit with sales of the same layout here, not with asking prices. Free, reply within 24 hours.

By submitting the form you agree to the processing of your contact details, including for advertising analytics.

Nearby projects

For AI agents and researchers

Machine-readable mirrors of this page: Markdown · JSON. They carry the same figures as this page, each with its origin labelled.

How to cite:Wadi Hills — Continental Club Property, from Dubai Land Department registry and developer data, 2026-10-17, https://continentalclub.ae/project/wadi-hills-by-hre-dubailand-residence-complex/

Where should we send the shortlist?

The PDF downloads right after you submit. A manager gets in touch only if you ask.