Developer: Wadi Hills City Real Estate Development · DubaiLand Residence Complex
Wadi Hills is a residential project by Wadi Hills City Real Estate Development in DubaiLand Residence Complex, Dubai, with prices from AED 682 000, handover Q1 2028, construction 7.7% complete per the DLD registry, 131 apartments, 59 sold to first buyers per the DLD register (as of 19 Nov 2026).
| Type | Bedrooms | Size, sq.ft |
|---|---|---|
| Studio | studio | 372–418 |
| One-bedroom apartments | 1 | 667–734 |
| Two-bedroom apartments | 2 | 1 093 |
| Three-bedroom apartments | 3 | 1 423–1 477 |
Balcony or terrace per the DLD registry: almost every residential unit (100%). Typical size: Studio — ~67 sq.ft (6.2 m²); 1 Bedroom — ~105 sq.ft (9.8 m²); 3 Bedroom — ~394 sq.ft (37 m²). Median of registered units; for villas and townhouses the registry includes terraces and open areas.
≈72 of 131 apartments available
Sold to first buyers 59 (45%)Available ≈72
| Type | Total | Sold | Available |
|---|---|---|---|
| Studios | 48 | 22 | 26 |
| 1 bedroom | 59 | 17 | 42 |
| 2 bedrooms | 1 | 0 | 1 |
| 3 bedrooms | 23 | 20 | 3 |
| Total | 131 | 59 | 72 |
Sales data comes from the official Dubai Land Department (DLD) register. Please confirm actual availability with our sales team — leave a request.
Tap an apartment type in the table to add it to your request.
“Available” means units without a registered sale; resales are excluded.
A broker will compare this project with 3 similar ones: prices, handover dates and payment plans.
All Dubai projects handing over in 2028 →
Data from the Dubai Land Department project registry (updated 20.11.2026 05:55).
Pace: 0.66% per month. At this rate we do not project a completion date: it falls more than 10 years out.
The pace is calculated from the past year of inspections. It is an estimate, not a developer commitment. For reference: across 1,175 completed projects the median pace is 2.48% per month and the median build takes 40 months.
44 more photos in the DLD register
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: Wadi Hills City Real Estate Development · District: DubaiLand Residence Complex
Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.
| Type | Size, m² | Price, AED | Per m² | Deals |
|---|---|---|---|---|
| Studio | 36 | 726 000 | 20 167 | 22 |
| 1 bedroom | 66 | 1 064 280 | 16 125 | 17 |
| 3 bedrooms | 137 | 1 595 000 | 11 642 | 20 |
Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.
Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 25.06.2026 | 1 BR | 65.7 | 1 064 280 |
| 25.06.2026 | 3 BR | 137.3 | 1 558 200 |
| 25.06.2026 | 3 BR | 137.3 | 1 644 000 |
| 24.06.2026 | 3 BR | 132.2 | 1 572 000 |
| 23.06.2026 | 3 BR | 137.3 | 1 715 000 |
| 23.06.2026 | 3 BR | 137.3 | 1 764 000 |
| 23.06.2026 | Studio | 37.1 | 734 000 |
| 23.06.2026 | Studio | 37.1 | 732 000 |
| 23.06.2026 | 3 BR | 137.3 | 1 636 000 |
| 23.06.2026 | 3 BR | 137.5 | 1 552 000 |
| 23.06.2026 | 3 BR | 137.3 | 1 588 580 |
| 23.06.2026 | 3 BR | 137.3 | 1 612 000 |
| 23.06.2026 | 3 BR | 137.3 | 1 605 000 |
| 22.06.2026 | 3 BR | 132.2 | 1 595 000 |
| 22.06.2026 | 3 BR | 132.2 | 1 543 410 |
| 22.06.2026 | 3 BR | 137.3 | 1 596 000 |
| 18.05.2026 | 3 BR | 132.2 | 1 553 000 |
| 28.04.2026 | 3 BR | 132.2 | 1 564 000 |
| 23.04.2026 | 3 BR | 132.2 | 1 604 000 |
| 10.04.2026 | 3 BR | 132.2 | 1 548 000 |
| 30.03.2026 | 3 BR | 132.2 | 1 611 000 |
| 30.03.2026 | 3 BR | 132.2 | 1 580 000 |
| 30.03.2026 | 3 BR | 132.2 | 1 588 000 |
| 17.03.2026 | Studio | 36.2 | 716 000 |
| 17.03.2026 | 1 BR | 61.8 | 1 074 000 |
| 16.03.2026 | Studio | 39.0 | 763 420 |
| 09.03.2026 | 1 BR | 65.9 | 1 127 000 |
| 25.02.2026 | 1 BR | 65.9 | 1 089 000 |
| 25.02.2026 | 1 BR | 65.9 | 1 096 000 |
| 25.02.2026 | 1 BR | 68.3 | 975 100 |
| 25.02.2026 | Studio | 34.3 | 682 000 |
| 25.02.2026 | Studio | 34.3 | 664 440 |
| 05.02.2026 | 1 BR | 61.8 | 1 032 000 |
| 29.01.2026 | Studio | 39.0 | 776 000 |
| 29.01.2026 | 1 BR | 68.3 | 1 031 000 |
| 29.01.2026 | 1 BR | 68.3 | 1 005 000 |
| 29.01.2026 | Studio | 39.0 | 770 000 |
| 29.01.2026 | Studio | 36.2 | 712 000 |
| 29.01.2026 | 1 BR | 63.4 | 1 090 000 |
| 29.01.2026 | Studio | 34.3 | 685 000 |
| 29.01.2026 | Studio | 37.3 | 744 000 |
| 29.01.2026 | 1 BR | 61.8 | 1 036 000 |
| 29.01.2026 | Studio | 34.3 | 676 000 |
| 29.01.2026 | 1 BR | 68.3 | 1 016 260 |
| 20.01.2026 | 1 BR | 68.3 | 987 000 |
| 05.01.2026 | Studio | 36.2 | 726 000 |
| 23.12.2025 | 1 BR | 65.9 | 1 102 000 |
| 22.12.2025 | Studio | 37.3 | 745 000 |
| 22.12.2025 | Studio | 34.3 | 687 000 |
| 22.12.2025 | 1 BR | 65.9 | 1 109 790 |
Dubai Land Department transaction registry, updated 20.11.2026. Explore Dubai property transactions →
For UAE residents the down payment starts at 20% with terms up to 25 years. Indicative monthly payment for prices from 682 000 AED is 2 880 AED.
Estimates only; not a bank approval.

Vladimir Malin
Senior Broker · Continental Club Property · RERA ORN 31933
Answers questions about Wadi Hills: current availability, payment plan, DLD registration. English and Russian.
We will send floor plans, the payment plan and available units for this project.
Project data comes from the Dubai Land Department (DLD) registry.
Every figure carries its origin: “DLD registry” is taken from the Dubai Land Department register, “Developer supplied” is stated by the developer, “Our calculation” is computed by us from the first two. Developer prices change without notice — confirm before you commit. Methodology
Wadi Hills is an active residential development by Wadi Hills City Real Estate Development in DubaiLand Residence Complex, within Wadi Al Safa 5. The project comprises one residential building configured as basement, ground floor and 11 upper floors. Its recorded completion stood at 7.72% on 14 September 2026, with completion scheduled for 31 January 2028.
Wadi Hills is planned as a single residential building with a basement, ground floor and 11 upper floors. The project is identified by project number 4100 and has a reported total area of 8,818.88. It is located in DubaiLand Residence Complex, which is a residential community within the Wadi Al Safa 5 area. The development’s planned start date is 1 November 2025 and its scheduled completion date is 31 January 2028. The wider community contains multiple residential buildings as well as newer construction plots, placing the project within an established and expanding residential setting in the wider DubaiLand cluster.
DubaiLand Residence Complex is a planned residential development in DubaiLand, administered within Wadi Al Safa 5. It lies north-west of central Dubai at coordinates 25.091311, 55.378277. The community combines mid-rise residential projects with landscaped areas, road improvements and pavements. Community green areas and landscaped roundabouts form part of the district’s public realm. Wadi Hills is therefore positioned in a residential neighbourhood rather than in a standalone development zone. The district also includes a mix of existing apartment buildings and plots under development, with road connections serving the wider DubaiLand area.
DubaiLand Residence Complex includes two mid-sized parks in each half of the community, together with smaller parks on its periphery. These park areas include sports facilities and children’s play areas. Landscaped roundabouts and junctions contribute further green coverage across the district. The community’s public spaces are distributed through its central and peripheral areas, alongside its residential buildings and road network. These facilities form part of the wider DubaiLand Residence Complex setting for Wadi Hills. The project’s location also places it within a community where landscaping, local parks and organised streets are established features of the neighbourhood.
Global Village is 7.6 km from DubaiLand Residence Complex. The Dubai Mall is 15.4 km away, while Business Bay is 15.5 km away. Burj Khalifa and Downtown Dubai are 15.7 km from the community, and Dubai International Financial Centre is 16.5 km away. Dubai International Airport is 18.0 km away, with Mall of the Emirates at 18.1 km. Dubai Marina is 24.0 km from the district. These distances place Wadi Hills within the DubaiLand area while maintaining road connections to major retail, business, leisure and airport destinations across Dubai.
The Aquila School is 0.4 km from DubaiLand Residence Complex, and GEMS FirstPoint School is 0.6 km away. Road travel is the main transport option for the community. The nearest Green Line metro station, G30, is 14.6 km away and is not within walking distance. Within the community, on-street parking has been fully allocated, with a charge of AED 3 per hour where applicable. Main junction and streetscape improvements in the district are complete or in their final stages. The road layout, local schools and community facilities form part of the immediate setting around Wadi Hills.
Wadi Hills is recorded as active. Its construction completion ratio was 7.72% at the inspection dated 14 September 2026. The project schedule begins on 1 November 2025 and sets completion for 31 January 2028. The status and completion ratio were retained in the update dated 12 June 2026. The development has 131 apartments. Its project number is 4100, which is also used for its development record. These dates and progress figures provide the current recorded construction position and the scheduled completion point for the project.
HRE presents Wadi Hills as a residential building in Wadi Al Safa 5, within Dubailand Residence Complex, with studios and one- to three-bedroom apartments from about 369 to 1,436 sq ft. Residents get a rooftop pool, a gym and wellness area, a concierge lobby and smart-home entry. At launch, the developer listed prices from about AED 659,000. According to HRE, Arabian Ranches and Nad Al Sheba are about 7 minutes away by car, Meydan about 12 minutes, Downtown Dubai about 15 minutes and Dubai International Airport about 18 minutes. The developer gives Q1 2028 for handover. For current prices and the payment plan, contact a Continental Club Property broker (RERA 31933).
Compare with other projects under construction: new off-plan launches in Dubai — completion data from the DLD register, prices and handover dates.
Dubai market as a whole: prices, transactions and trends (DLD data) →
The building is still under construction, so it has no RERA-approved budget yet — that comes after handover. The figures below are what already-completed buildings in the area pay.
Check the charge for a specific building →
Median across 28 completed buildings in DubaiLand Residence Complex for 2026, from the DLD service charge index (Mollak). This is an area benchmark, not this project’s rate: RERA approves that after handover and it may land either side of the median.
Based on 50 registered DLD sales in Wadi Hills between 22 Dec 2025 and 25 Jun 2026: median 15 646 AED/m² (1 454 AED/sq ft); half of the deals fell between 11 957 and 19 655 AED/m². This is transaction statistics, not a valuation of a specific unit: floor, view, finish and condition move the price.
| Type | Indicative price | Deals | Median AED/m² | Median area, m² |
|---|---|---|---|---|
| Studio | AED 717 000 | 15 | 19 800 | 36.2 |
| 1 BR | AED 1 097 000 | 15 | 16 644 | 65.9 |
| 3 BR | AED 1 597 000 | 20 | 11 859 | 134.7 |
Source: Dubai Land Department open data, the latest up to 50 sales in the building; areas as registered; refreshed daily. Deals outside 3,000–200,000 AED/m² are excluded.
PDF shortlist · updated 1 November 2026
DubaiLand Residence Complex: new projects and prices
30 projects · prices from DLD and developers
Ag 7even DubaiLand Residence Complex · Studio, 1–2 BR
from AED 485,000
Ag 9ine DubaiLand Residence Complex · Studio, 1–2 BR
from AED 488,000
Time 3 DubaiLand Residence Complex · Studio, 1–3 BR
from AED 490,000
27 more in the PDF: prices, handover dates, payment plans
The PDF opens instantly. Refreshed monthly from DLD data.
59 of 131 apartments have been sold to first buyers per the DLD register. DLD registrations, including resales: 61 (since 2025). We compare your unit with sales of the same layout here, not with asking prices. Free, reply within 24 hours.
Machine-readable mirrors of this page: Markdown · JSON. They carry the same figures as this page, each with its origin labelled.
How to cite:Wadi Hills — Continental Club Property, from Dubai Land Department registry and developer data, 2026-10-17, https://continentalclub.ae/project/wadi-hills-by-hre-dubailand-residence-complex/