Developer: Ellington Properties · Jumeirah Lakes Towers

Uh West By Ellington

Uh West By Ellington is a residential project by Ellington Properties in Jumeirah Lakes Towers, Dubai, with prices from AED 1 500 000, planned handover Q1 2026, construction 83.7% complete per the DLD registry, 381 units, 465 DLD-registered sales since 2023.

Price fromAED 1 500 000Our calculation
Unit typesStudio · 1–3 BR407–1 988 ft²DLD registry
Planned handoverQ1 2026Developer supplied
Construction83.7%DLD registry · checked 27.10.2026

Layouts and sizes

TypeUnitsTypical size, sq.ft
Studio34407–450
1 Bedroom215817–965
2 Bedroom1141 202–1 450
3 Bedroom141 876–1 988
Other units4906–1 690

Size range excludes the smallest and largest 5% of units of each type.

All units are freehold. Data from the DLD registry.

Sales pace · DLD data as of 10 Nov 2026

Source: Dubai Land Department registrations (include off-plan resales). Ask us for current availability.

Payment plan 70/30 70% before handover · 30% on handover

The purchase price is split into these stages.

120%Down payment
250%During construction
330%On handover

The exact schedule is confirmed in the sale agreement for the selected unit.

Compare with similar projects

A broker will compare this project with 3 similar ones: prices, handover dates and payment plans.

Compare in WhatsApp

Mortgage for this project

For UAE residents the down payment starts at 20% with terms up to 25 years. Indicative monthly payment for prices from 1 500 000 AED is 6 334 AED.

Calculate mortgage

Estimates only; not a bank approval.

Handover date & construction progress

83.72%
  • Construction started26.05.2023
  • Planned handover (developer)Q1 2026
  • Status date27.10.2026
  • Progress between DLD inspections+12.43% (11.06.2026 → 27.10.2026)
  • Escrow bankFirst Abu Dhabi Bank
  • DLD project number2684

Data from the Dubai Land Department project registry (updated 13.11.2026 05:55).

DLD advertising permit

DLD advertising permit

Listed by Continental Club Property under a Dubai Land Department (Trakheesi) permit. Scan the QR to verify.

Inspection history 8
025507510031.05.202327.10.2026
Actual, per inspections

Pace: 2.85% per month. At this rate 100% falls on 19.04.2027.

The pace is calculated from the past year of inspections. It is an estimate, not a developer commitment. For reference: across 1,175 completed projects the median pace is 2.48% per month and the median build takes 40 months.

Construction progress 120
27.10.2026 83.72%
Uh West By Ellington, Jumeirah Lakes Towers construction progress — 27 October 2026, 83.72% complete, photo 1 of 12Uh West By Ellington, Jumeirah Lakes Towers construction progress — 27 October 2026, 83.72% complete, photo 2 of 12Uh West By Ellington, Jumeirah Lakes Towers construction progress — 27 October 2026, 83.72% complete, photo 3 of 12Uh West By Ellington, Jumeirah Lakes Towers construction progress — 27 October 2026, 83.72% complete, photo 4 of 12Uh West By Ellington, Jumeirah Lakes Towers construction progress — 27 October 2026, 83.72% complete, photo 5 of 12Uh West By Ellington, Jumeirah Lakes Towers construction progress — 27 October 2026, 83.72% complete, photo 6 of 12Uh West By Ellington, Jumeirah Lakes Towers construction progress — 27 October 2026, 83.72% complete, photo 7 of 12Uh West By Ellington, Jumeirah Lakes Towers construction progress — 27 October 2026, 83.72% complete, photo 8 of 12Uh West By Ellington, Jumeirah Lakes Towers construction progress — 27 October 2026, 83.72% complete, photo 9 of 12Uh West By Ellington, Jumeirah Lakes Towers construction progress — 27 October 2026, 83.72% complete, photo 10 of 12Uh West By Ellington, Jumeirah Lakes Towers construction progress — 27 October 2026, 83.72% complete, photo 11 of 12Uh West By Ellington, Jumeirah Lakes Towers construction progress — 27 October 2026, 83.72% complete, photo 12 of 12
11.06.2026 71.29%
Uh West By Ellington, Jumeirah Lakes Towers construction progress — 11 June 2026, 71.29% complete, photo 1 of 20Uh West By Ellington, Jumeirah Lakes Towers construction progress — 11 June 2026, 71.29% complete, photo 2 of 20Uh West By Ellington, Jumeirah Lakes Towers construction progress — 11 June 2026, 71.29% complete, photo 3 of 20Uh West By Ellington, Jumeirah Lakes Towers construction progress — 11 June 2026, 71.29% complete, photo 4 of 20Uh West By Ellington, Jumeirah Lakes Towers construction progress — 11 June 2026, 71.29% complete, photo 5 of 20Uh West By Ellington, Jumeirah Lakes Towers construction progress — 11 June 2026, 71.29% complete, photo 6 of 20Uh West By Ellington, Jumeirah Lakes Towers construction progress — 11 June 2026, 71.29% complete, photo 7 of 20Uh West By Ellington, Jumeirah Lakes Towers construction progress — 11 June 2026, 71.29% complete, photo 8 of 20Uh West By Ellington, Jumeirah Lakes Towers construction progress — 11 June 2026, 71.29% complete, photo 9 of 20Uh West By Ellington, Jumeirah Lakes Towers construction progress — 11 June 2026, 71.29% complete, photo 10 of 20Uh West By Ellington, Jumeirah Lakes Towers construction progress — 11 June 2026, 71.29% complete, photo 11 of 20Uh West By Ellington, Jumeirah Lakes Towers construction progress — 11 June 2026, 71.29% complete, photo 12 of 20Uh West By Ellington, Jumeirah Lakes Towers construction progress — 11 June 2026, 71.29% complete, photo 13 of 20Uh West By Ellington, Jumeirah Lakes Towers construction progress — 11 June 2026, 71.29% complete, photo 14 of 20Uh West By Ellington, Jumeirah Lakes Towers construction progress — 11 June 2026, 71.29% complete, photo 15 of 20Uh West By Ellington, Jumeirah Lakes Towers construction progress — 11 June 2026, 71.29% complete, photo 16 of 20Uh West By Ellington, Jumeirah Lakes Towers construction progress — 11 June 2026, 71.29% complete, photo 17 of 20Uh West By Ellington, Jumeirah Lakes Towers construction progress — 11 June 2026, 71.29% complete, photo 18 of 20Uh West By Ellington, Jumeirah Lakes Towers construction progress — 11 June 2026, 71.29% complete, photo 19 of 20Uh West By Ellington, Jumeirah Lakes Towers construction progress — 11 June 2026, 71.29% complete, photo 20 of 20
10.02.2026 59.51%
Uh West By Ellington, Jumeirah Lakes Towers construction progress — 10 February 2026, 59.51% complete, photo 1 of 4Uh West By Ellington, Jumeirah Lakes Towers construction progress — 10 February 2026, 59.51% complete, photo 2 of 4Uh West By Ellington, Jumeirah Lakes Towers construction progress — 10 February 2026, 59.51% complete, photo 3 of 4Uh West By Ellington, Jumeirah Lakes Towers construction progress — 10 February 2026, 59.51% complete, photo 4 of 4

84 more photos in the DLD register

Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.

Recent transactions

DateTypeSize, m²Price, AED
08.10.20262 BR133.82 984 828
24.09.20261 BR81.61 603 828
03.09.2026Studio41.7836 400
02.09.20261 BR79.31 425 000
31.08.2026Studio41.7950 000
27.08.20262 BR111.62 422 828
17.08.20262 BR116.52 350 000
03.08.20261 BR77.81 882 828
14.07.20261 BR78.31 280 828
13.07.20262 BR118.12 600 000
25.06.20261 BR88.81 543 828
24.06.20262 BR118.12 450 000
22.06.20262 BR119.13 112 828
08.06.20262 BR116.52 400 828
02.06.20261 BR79.31 500 000
02.06.20261 BR84.81 798 828
25.05.20262 BR119.82 648 828
15.05.20262 BR130.33 006 828
30.03.20261 BR79.31 675 000
30.03.20261 BR78.31 655 000
18.03.20261 BR81.61 603 828
12.03.20261 BR88.81 736 000
09.03.20263 BR174.33 425 000
23.02.20262 BR111.62 527 828
18.02.20261 BR86.11 750 000
10.02.20261 BR81.61 710 000
03.02.20261 BR81.51 650 000
02.02.20261 BR88.82 150 000
13.01.20262 BR116.53 031 828
13.01.20261 BR81.51 405 828
29.12.20252 BR134.73 000 000
19.12.2025105.62 888 828
11.12.20251 BR81.51 685 000
09.12.20252 BR118.12 850 000
08.12.20251 BR40.8795 414
05.12.20252 BR119.62 475 828
03.12.2025157.06 125 828
25.11.20251 BR85.51 650 000
25.11.20252 BR123.92 350 000
25.11.20251 BR85.51 610 000
25.11.2025105.84 398 828
24.11.20251 BR79.42 100 000
24.11.20252 BR119.92 415 000
21.11.20251 BR86.21 600 000
19.11.20252 BR119.12 481 828
10.11.20253 BR174.53 865 000
10.11.20251 BR86.11 675 000
04.11.20251 BR81.62 111 828
03.11.20252 BR130.32 398 799
31.10.20252 BR111.72 500 000

Dubai Land Department transaction registry, updated 13.11.2026. Explore Dubai property transactions →

Registered transactions in Uh West By Ellington

Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.

465deals since 2023
19 030AED per m², median
0%resale, the rest bought from the developer
+3%over the past year

The yearly figure compares the last 12 months with the 12 before them: calendar years would not work, the current one is unfinished. The district moved +7% over the same period, so the building lagged.

What buyers actually paid

TypeSize, m²Price, AEDPer m²Deals
Studio42805 82819 18640
1 bedroom851 529 82817 998273
2 bedrooms1212 450 00020 248133
3 bedrooms1753 399 82819 42815

Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.

How the price per square metre moved

From 2023 to 2025 — +17% on the price per square metre in this building. The district moved +36% over the same period, so the building lagged the market.

17 3062023——
18 9892024——
20 1692025——
20 9512026*——

Top to bottom: purchase price per m², year, annual rent per m², gross yield.

All figures are medians. Years with fewer than eight deals are skipped; rent is shown where there are at least twenty contracts. The yield is gross — service charges are not published in the register.

* 2026 is still in progress and its bar covers part of the year. The growth figure above uses completed years.

Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.

Estimate a unit in this building from DLD sales

Based on 50 registered DLD sales in Uh West By Ellington between 31 Oct 2025 and 8 Oct 2026: median 20 792 AED/m² (1 932 AED/sq ft); half of the deals fell between 19 574 and 22 575 AED/m². This is transaction statistics, not a valuation of a specific unit: floor, view, finish and condition move the price.

TypeIndicative priceDealsMedian AED/m²Median area, m²
1 BRAED 1 603 0002419 65081.6
2 BRAED 2 621 0001922 010119.1
Get an exact valuation

Source: Dubai Land Department open data, the latest up to 50 sales in the building; areas as registered; refreshed daily. Deals outside 3,000–200,000 AED/m² are excluded.

PDF shortlist · updated 1 November 2026

Jumeirah Lakes Towers: new projects and prices

17 projects · prices from DLD and developers

  1. Golf Views Seven City Golf Views Seven City Jumeirah Lakes Towers from AED 459,888
  2. Seven City Jlt Seven City Jlt Jumeirah Lakes Towers · Studio, 1–3 BR from AED 490,000
  3. Upper House Upper House Jumeirah Lakes Towers from AED 800,000

14 more in the PDF: prices, handover dates, payment plans

The PDF opens instantly. Refreshed monthly from DLD data.

How much is your property in Uh West By Ellington worth?

DLD has recorded 465 sales in this building since 2023, 1 of them resales. We compare your unit with sales of the same layout here, not with asking prices. Free, reply within 24 hours.

By submitting the form you agree to the processing of your contact details, including for advertising analytics.

Places nearby

Uh West By Ellington

About the project

Uh West By Ellington is a one-building residential and commercial development in Jumeirah Lakes Towers, within Al Thanyah Fifth. It is being developed by Ellington Properties Development and is listed as active, with a construction completion ratio of 83.72% recorded on 27 October 2026.

Project scale and composition

Uh West By Ellington comprises one building with 381 units and a recorded total area of 36,320.14. The development combines residential and commercial uses within Jumeirah Lakes Towers. Its building configuration includes a basement, ground floor, five parking levels, 31 floors and a roof level. The project began on 26 May 2023. The development is located in Al Thanyah Fifth, the area that includes Jumeirah Lakes Towers, a high-rise district of residential, office, hospitality and retail buildings.

Building design

The building is designed with a concrete structure and blockwork, followed by internal and external finishes. Its vertical arrangement places the basement and ground floor below five parking levels, with 31 further floors and a roof level above. The project’s registered description identifies both residential and commercial components, placing it within the mixed-use character of Jumeirah Lakes Towers. The scheme is a single-building development rather than a multi-building residential complex, with all 381 units contained within its recorded project structure.

Construction status and recorded dates

Uh West By Ellington has active project status. Construction started on 26 May 2023, and the recorded project completion date is 3 March 2026. An inspection dated 27 October 2026 recorded a completion ratio of 83.72%. The project is identified by number 2684. These recorded construction details place the development in an active stage, with progress measured through the stated completion ratio rather than by a sales or marketing status.

Jumeirah Lakes Towers setting

Jumeirah Lakes Towers is a mixed-use waterfront district immediately behind Dubai Marina. The neighbourhood combines residential towers, commercial premises, hotels, retail and landscaped public spaces around three artificial lakes and a central park. It contains 87 tower blocks across 23 clusters, with the 66-storey Almas Tower at the centre of the district. Lakeside promenades and the central park provide walking, jogging and cycling routes. JLT is also home to the Dubai Multi Commodities Centre free zone, which hosts more than 21,000 companies across a range of sectors. The district’s built form is dominated by high-rise apartments, serviced residences and commercial towers, and many buildings combine ground-floor retail with residential or office floors above.

Transport and district connections

Jumeirah Lakes Towers is served by the Dubai Metro Red Line. R36 is the nearest stated station, at a distance of 685 metres on foot from within the district. Pedestrian promenades and local roads connect JLT with Dubai Marina and surrounding areas. Road-distance figures from JLT include 1.4 km to Dubai Marina, 2.1 km to JBR Beach, 3.9 km to Palm Jumeirah, 6.3 km to Mall of the Emirates, 17.7 km to Burj Khalifa and Downtown Dubai, 18.1 km to The Dubai Mall, 20.5 km to Al Maktoum International Airport and 28.7 km to Dubai International Airport. Expo City Dubai is listed at 13.4 km and Business Bay at 16.2 km.

Public realm and neighbourhood facilities

The JLT district has lakeside promenades, a central park, retail and dining uses, alongside residential and commercial towers. District works include lake and lake-wall improvements, water-quality works, landscape enhancements, road connections with Jumeirah Islands and expanded visitor parking. A tree-replacement phase involved the removal and replanting of 60 palm trees, with further planting planned within the broader public-realm programme. Recreational-facility upgrades and new sports infrastructure have also been announced for residents, workers and visitors. These district-level facilities sit alongside the three lakes and central park that shape the public spaces of Jumeirah Lakes Towers.

Frequent questions

Who is the developer of Uh West By Ellington?
Uh West By Ellington is developed by Ellington Properties Development.
When is the Uh West By Ellington handover date?
The planned handover (completion) date of Uh West By Ellington per the developer was Q1 2026. The DLD register lists 3 March 2026. Construction progress was 83.72% at the DLD inspection of 27 October 2026. The date and progress on this page are updated from the DLD register. For current availability, prices and resale (assignment) options, send an enquiry on this page.
Where is Uh West By Ellington located?
The project is located in Jumeirah Lakes Towers, within Al Thanyah Fifth.
How many units are in Uh West By Ellington?
The development comprises 381 units in one building.
What is the construction status of Uh West By Ellington?
The project is active. Its completion ratio was recorded at 83.72% on 27 October 2026.
When did Uh West By Ellington start construction?
The recorded project start date is 26 May 2023. The recorded completion date is 3 March 2026.
How tall is the building configuration?
The project includes a basement, ground floor, five parking levels, 31 floors and a roof level.
What is near Uh West By Ellington in JLT?
JLT has three artificial lakes, a central park, lakeside promenades, retail and dining uses. Dubai Marina is listed 1.4 km from JLT and JBR Beach 2.1 km away by road.
Is Jumeirah Lakes Towers connected to the Metro?
JLT is served by the Dubai Metro Red Line. R36 is stated at 685 metres from within the district.
How can I buy an apartment in Uh West By Ellington?
Submit an enquiry via the form on this page or message us on WhatsApp — a Continental Club Property broker (RERA 31933) will help you choose a unit and send the brochure and payment plan.

More projects by Ellington Properties

All 64 projects by Ellington Properties →

Nearby projects

Get the presentation and prices

We will send floor plans, the payment plan and available units for this project.

By submitting the form you agree to the processing of your contact details, including for advertising analytics.

Project data comes from the Dubai Land Department (DLD) registry.

Every figure carries its origin: “DLD registry” is taken from the Dubai Land Department register, “Developer supplied” is stated by the developer, “Our calculation” is computed by us from the first two. Developer prices change without notice — confirm before you commit. Methodology

For AI agents and researchers

Machine-readable mirrors of this page: Markdown · JSON. They carry the same figures as this page, each with its origin labelled.

How to cite:Uh West By Ellington — Continental Club Property, from Dubai Land Department registry and developer data, 2026-11-13, https://continentalclub.ae/project/uh-west-by-ellington-jumeirah-lakes-towers/

Where should we send the shortlist?

The PDF downloads right after you submit. A manager gets in touch only if you ask.