Developer: Damac Properties · DAMAC Riverside Views

Riverside Views Capri 1

Riverside Views Capri 1 is a residential project by Damac Properties in DAMAC Riverside Views, Dubai, with prices from AED 993 000, handover Q1 2029, construction 8.2% complete per the DLD registry, 824 apartments, 804 sold to first buyers per the DLD register (as of 23 Nov 2026).

Price fromAED 993 000Developer supplied
Unit types1 · 2 BR697–1 450 ft²DLD registry
HandoverQ1 2029Developer supplied
Construction8.2%DLD registry · checked 22.09.2026

· DLD data as of 23 Nov

≈20 of 824 apartments still available · DLD, 23 Nov
★ 5.0 on Google · 7 reviews

Layouts and sizes

TypeUnitsTypical size, sq.ft
1 Bedroom754697–1 044
2 Bedroom701 364–1 450

Size range excludes the smallest and largest 5% of units of each type.

All units are freehold. Data from the DLD registry.

Balcony or terrace per the DLD registry: almost every residential unit (100%). Typical size: 1 Bedroom — ~193 sq.ft (18 m²); 2 Bedroom — ~367 sq.ft (34 m²). Median of registered units; for villas and townhouses the registry includes terraces and open areas.

Unit availability · DLD data as of 23 Nov 2026

≈20 of 824 apartments availableestimate

Sold to first buyers 804 (98%)Available ≈20

TypeTotalSoldAvailable
1 bedroom75473420
2 bedrooms70700
Total82480420

Sales data comes from the official Dubai Land Department (DLD) register. Please confirm actual availability with our sales team — leave a request.

Tap an apartment type in the table to add it to your request.

By submitting the form you agree to the processing of your contact details, including for advertising analytics.

“Available” means units without a registered sale; resales are excluded; this is an estimate.

Units left in every Dubai off-plan project →

Compare with similar projects

A broker will compare this project with 3 similar ones: prices, handover dates and payment plans.

Compare in WhatsApp

Handover date & construction progress

8.18%
  • StatusActive
  • Construction started11.08.2025
  • HandoverQ1 2029
  • Status date22.09.2026
  • Progress between DLD inspections+3.43% (12.03.2026 → 22.09.2026)
  • Escrow bankMashreq Bank
  • Scale5 bldg
  • DLD project number3663

Data from the Dubai Land Department project registry (updated 25.11.2026 05:55).

Inspection history 4
025507510022.04.202522.09.2026
Actual, per inspections

Pace: 0.74% per month. At this rate we do not project a completion date: it falls more than 10 years out.

The pace is calculated from the past year of inspections. It is an estimate, not a developer commitment. For reference: across 1,175 completed projects the median pace is 2.48% per month and the median build takes 40 months.

Construction progress 106
22.09.2026 8.18%
Riverside Views Capri 1, DAMAC Riverside Views construction progress — 22 September 2026, 8.18% complete, photo 1 of 36Riverside Views Capri 1, DAMAC Riverside Views construction progress — 22 September 2026, 8.18% complete, photo 2 of 36Riverside Views Capri 1, DAMAC Riverside Views construction progress — 22 September 2026, 8.18% complete, photo 3 of 36Riverside Views Capri 1, DAMAC Riverside Views construction progress — 22 September 2026, 8.18% complete, photo 4 of 36Riverside Views Capri 1, DAMAC Riverside Views construction progress — 22 September 2026, 8.18% complete, photo 5 of 36Riverside Views Capri 1, DAMAC Riverside Views construction progress — 22 September 2026, 8.18% complete, photo 6 of 36Riverside Views Capri 1, DAMAC Riverside Views construction progress — 22 September 2026, 8.18% complete, photo 7 of 36Riverside Views Capri 1, DAMAC Riverside Views construction progress — 22 September 2026, 8.18% complete, photo 8 of 36Riverside Views Capri 1, DAMAC Riverside Views construction progress — 22 September 2026, 8.18% complete, photo 9 of 36Riverside Views Capri 1, DAMAC Riverside Views construction progress — 22 September 2026, 8.18% complete, photo 10 of 36Riverside Views Capri 1, DAMAC Riverside Views construction progress — 22 September 2026, 8.18% complete, photo 11 of 36Riverside Views Capri 1, DAMAC Riverside Views construction progress — 22 September 2026, 8.18% complete, photo 12 of 36Riverside Views Capri 1, DAMAC Riverside Views construction progress — 22 September 2026, 8.18% complete, photo 13 of 36Riverside Views Capri 1, DAMAC Riverside Views construction progress — 22 September 2026, 8.18% complete, photo 14 of 36Riverside Views Capri 1, DAMAC Riverside Views construction progress — 22 September 2026, 8.18% complete, photo 15 of 36Riverside Views Capri 1, DAMAC Riverside Views construction progress — 22 September 2026, 8.18% complete, photo 16 of 36Riverside Views Capri 1, DAMAC Riverside Views construction progress — 22 September 2026, 8.18% complete, photo 17 of 36Riverside Views Capri 1, DAMAC Riverside Views construction progress — 22 September 2026, 8.18% complete, photo 18 of 36Riverside Views Capri 1, DAMAC Riverside Views construction progress — 22 September 2026, 8.18% complete, photo 19 of 36Riverside Views Capri 1, DAMAC Riverside Views construction progress — 22 September 2026, 8.18% complete, photo 20 of 36Riverside Views Capri 1, DAMAC Riverside Views construction progress — 22 September 2026, 8.18% complete, photo 21 of 36Riverside Views Capri 1, DAMAC Riverside Views construction progress — 22 September 2026, 8.18% complete, photo 22 of 36Riverside Views Capri 1, DAMAC Riverside Views construction progress — 22 September 2026, 8.18% complete, photo 23 of 36Riverside Views Capri 1, DAMAC Riverside Views construction progress — 22 September 2026, 8.18% complete, photo 24 of 36Riverside Views Capri 1, DAMAC Riverside Views construction progress — 22 September 2026, 8.18% complete, photo 25 of 36Riverside Views Capri 1, DAMAC Riverside Views construction progress — 22 September 2026, 8.18% complete, photo 26 of 36Riverside Views Capri 1, DAMAC Riverside Views construction progress — 22 September 2026, 8.18% complete, photo 27 of 36Riverside Views Capri 1, DAMAC Riverside Views construction progress — 22 September 2026, 8.18% complete, photo 28 of 36Riverside Views Capri 1, DAMAC Riverside Views construction progress — 22 September 2026, 8.18% complete, photo 29 of 36Riverside Views Capri 1, DAMAC Riverside Views construction progress — 22 September 2026, 8.18% complete, photo 30 of 36Riverside Views Capri 1, DAMAC Riverside Views construction progress — 22 September 2026, 8.18% complete, photo 31 of 36Riverside Views Capri 1, DAMAC Riverside Views construction progress — 22 September 2026, 8.18% complete, photo 32 of 36Riverside Views Capri 1, DAMAC Riverside Views construction progress — 22 September 2026, 8.18% complete, photo 33 of 36Riverside Views Capri 1, DAMAC Riverside Views construction progress — 22 September 2026, 8.18% complete, photo 34 of 36Riverside Views Capri 1, DAMAC Riverside Views construction progress — 22 September 2026, 8.18% complete, photo 35 of 36Riverside Views Capri 1, DAMAC Riverside Views construction progress — 22 September 2026, 8.18% complete, photo 36 of 36

70 more photos in the DLD register

Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.

Registered transactions in Riverside Views Capri 1

Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.

807DLD registrations incl. resales, since 2025
15 572AED per m², median
0%resale, the rest bought from the developer
0%over the past year

The yearly figure compares the last 12 months with the 12 before them: calendar years would not work, the current one is unfinished. The district moved +1% over the same period, so the building matched it.

What buyers actually paid

TypeSize, m²Price, AEDPer m²Deals
1 bedroom761 180 00015 526736
2 bedrooms1271 999 00015 74071

Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.

Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.

Recent transactions

DateTypeSize, m²Price, AED
24.11.20261 BR96.41 425 600
24.11.20261 BR89.01 330 560
10.11.20261 BR95.51 432 320
15.10.20261 BR95.51 497 000
12.10.20261 BR96.91 433 280
09.10.20261 BR64.6945 640
01.10.20261 BR101.41 520 000
11.09.20262 BR131.82 022 000
09.09.20261 BR101.41 589 000
04.09.20261 BR89.21 373 000
30.07.20261 BR89.01 210 880
30.07.20261 BR101.31 535 040
22.07.20261 BR97.01 525 000
16.07.20261 BR101.31 610 000
07.07.20261 BR65.21 018 000
30.06.20261 BR89.21 412 000
29.06.20261 BR66.51 020 480
25.06.20261 BR95.51 507 000
24.06.20261 BR107.51 635 000
11.06.20261 BR65.21 032 000
10.06.20261 BR64.81 023 000
03.06.20261 BR64.91 031 000
18.05.20261 BR64.9972 910
08.05.20262 BR137.62 054 000
06.05.20261 BR64.81 037 000
01.05.20261 BR64.81 002 000
23.04.20261 BR89.21 383 000
23.04.20261 BR64.61 020 000
21.04.20261 BR90.31 425 000
20.04.20261 BR101.31 599 000
16.04.20261 BR95.51 477 080
16.04.20261 BR95.51 482 030
16.04.20261 BR101.41 573 110
16.04.20261 BR96.41 486 660
15.04.20261 BR95.51 476 000
14.04.20261 BR89.91 408 440
14.04.20261 BR96.61 513 710
13.04.20261 BR95.51 481 000
13.04.20261 BR64.6999 000
09.04.20261 BR90.01 424 000
06.04.20261 BR96.41 527 000
06.04.20261 BR96.61 550 000
02.04.20262 BR126.82 105 252
31.03.20261 BR90.41 426 000
31.03.20261 BR95.51 543 000
30.03.20261 BR101.41 611 000
24.03.20261 BR101.31 537 550
18.03.20261 BR89.01 386 000
16.03.20261 BR95.51 517 000
16.03.20261 BR95.51 502 000

Dubai Land Department transaction registry, updated 24.11.2026. Explore Dubai property transactions →

Mortgage for this project

For UAE residents the down payment starts at 20% with terms up to 25 years. Indicative monthly payment for prices from 993 000 AED is 4 193 AED.

Calculate mortgage

Estimates only; not a bank approval.

Amenities

  • Floating opera
  • Opal chess haven
  • Floating cinema
  • Island restaurant
  • Essential oils lake
  • Portofino Restaurant
  • Callisthenics stations
  • Wall climbing
  • Live cooking classes
  • BBQ area
  • Amphitheatre
  • Lawn
  • Kidz Adventure Land
  • Hydroponic farm
  • Games zone
  • Clubhouse
  • Retail
  • Malibu Cove
  • Floating deck
  • Spa
  • Peace room
  • Aquatic fitness spaces

Places nearby

Riverside Views Capri 1

Your broker for this project

Elena Orlova

Elena Orlova

Senior Broker · Continental Club Property · RERA ORN 31933

Answers questions about Riverside Views Capri 1: current availability, payment plan, DLD registration. English and Russian.

Get the presentation and prices

We will send floor plans, the payment plan and available units for this project.

By submitting the form you agree to the processing of your contact details, including for advertising analytics.

Project data comes from the Dubai Land Department (DLD) registry.

Every figure carries its origin: “DLD registry” is taken from the Dubai Land Department register, “Developer supplied” is stated by the developer, “Our calculation” is computed by us from the first two. Developer prices change without notice — confirm before you commit. Methodology

About the project

Riverside Views Capri 1 is a waterfront apartment project by Damac Properties within DAMAC Riverside Views in Dubai Investments Park. The project comprises 824 apartments across five residential buildings and is part of a river-centred community organised into themed clusters. It is active, with construction recorded at 4.75% completion and completion scheduled for Q1 2029.

The project and its setting

Riverside Views Capri 1 forms part of DAMAC Riverside Views, a residential community in Dubai Investments Park built around a man-made river. The wider community places apartment towers on either side of the water and is organised into eight colour-themed clusters: Teal, Azure, Marine, Indigo, Royal, Capri, Sky and Pacific. Capri 1 is one of the named phases within this master-planned setting. The riverfront plan incorporates landscaped and communal spaces alongside residential buildings, with water, greenery and public facilities forming central elements of the community layout. The project is located in Dubai Investment Park Second, Dubai.

Residences and building format

The development contains 824 apartments in five buildings. The building design is G+3P+14, comprising a ground floor, three podium levels and 14 residential floors. The structure is specified as concrete and block construction with internal and external finishes. The Riverside Views apartment offering includes one- and two-bedroom residences. Capri 1 sits within the Capri cluster of DAMAC Riverside Views, where the community’s apartment buildings follow a linear riverfront arrangement. Waterfront views are a stated feature of the apartment towers within the development.

Waterfront amenities and social spaces

The planned amenity programme at DAMAC Riverside Views includes Malibu Cove, a floating deck, a floating cinema and a floating opera venue. Dining and social spaces include the Portofino Restaurant, an island restaurant, live cooking classes, barbecue areas, an amphitheatre, a lawn, a clubhouse and retail. The Portofino Restaurant is designed to be reached by boat. The floating stage is intended for musicals and operas, while the floating cinema and island restaurant add further venues along the water. A hydroponic farm is also included within the community’s facilities.

Fitness, wellness and family facilities

Wellness and recreation facilities planned for the community include aquatic fitness spaces, outdoor callisthenics stations, wall climbing, a spa, a peace room and an essential oils lake. Malibu Cove is planned as a setting for swimming and sunbathing. The fitness spaces combine aquatic exercise areas with outdoor training facilities, while the spa is intended to offer massages and holistic treatments. Family and leisure amenities include Kidz Adventure Land, a games zone, an amphitheatre and lawn, as well as the clubhouse. These facilities are planned within the wider DAMAC Riverside Views community rather than as a standalone residential building amenity list.

Dubai Investments Park location

Riverside Views Capri 1 is in Dubai Investments Park. The community is connected to Emirates Road, Al Qudra Road, Expo Road, Al Yalayis Road, Sheikh Mohammed Bin Zayed Road and Sheikh Zayed Road. Dubai Investments Park is listed at 10 minutes, while Sports City, Motor City and DAMAC Hills are listed at 11 minutes. Expo 2020 Venue is listed at 12 minutes and Al Maktoum International Airport at 15 minutes. Dubai International Airport is listed at 30 minutes, Burj Al Arab at 25 minutes and the Burj area at 28 minutes. Pulse Pond Park is 2.4 km away, and Expo City Dubai is 8.2 km away.

Price, payment plan and completion

Prices for Riverside Views Capri 1 start from AED 993,000. The payment plan is presented as a 75/25 structure and specifies a 20% down payment. The scheduled handover is Q1 2029, with the project completion date recorded as 31 March 2029. The project started on 11 August 2025. Its current status is active, and the recorded completion ratio is 4.75%, based on an inspection dated 12 March 2026. Riverside Views Capri 1 is a new launch.

Damac Properties

Damac Properties is the developer of Riverside Views Capri 1. Founded in 1982, the company is developing the project within the DAMAC Riverside Views community in Dubai Investments Park. The community’s plan brings together residential towers, waterfront facilities, dining venues, wellness spaces and family-focused amenities around the central river. Capri 1 is one of the named phases in the wider development, alongside phases in clusters such as Azure and Marine. The project’s registered development comprises five residential buildings and 824 apartments.

Service charge: what to expect

The building is still under construction, so it has no RERA-approved budget yet — that comes after handover. The figures below are what already-completed buildings in the area pay.

Area median5.92 AEDper sq ft per year · 64 AED/m²
Range in the area5.13 – 19.27AED per sq ft · 21 buildings
A 1,000 sq ft unit≈ 5,920 AEDper year at the median · ≈ $1,612
vs Dubai median▼ -63.0%Dubai 16.02 AED/sq ft

Check the charge for a specific building →

Median across 21 completed buildings in DAMAC Riverside Views for 2026, from the DLD service charge index (Mollak). This is an area benchmark, not this project’s rate: RERA approves that after handover and it may land either side of the median.

Frequent questions

Who is the developer of Riverside Views Capri 1?
Riverside Views Capri 1 is developed by Damac Properties, founded in 1982.
Where is Riverside Views Capri 1 located?
The project is located in Dubai Investment Park Second, within the DAMAC Riverside Views community in Dubai Investments Park.
What is the starting price for Riverside Views Capri 1?
Prices start from AED 993,000.
When is the Riverside Views Capri 1 handover date?
Riverside Views Capri 1 handover (completion) is scheduled for Q1 2029 (developer data). The DLD register lists 31 March 2029. Construction progress was 8.18% at the DLD inspection of 22 September 2026. The date and progress on this page are updated from the DLD register. For current availability, prices and resale (assignment) options, send an enquiry on this page.
What is the Riverside Views Capri 1 payment plan?
The payment plan is presented as 75/25 and includes a 20% down payment.
What apartment types are available at Riverside Views Capri 1?
The Riverside Views apartment offering includes one- and two-bedroom apartments.
How many units are in Riverside Views Capri 1?
The project comprises 824 apartments across five buildings.
What is the construction status of Riverside Views Capri 1?
The project is active and recorded at 4.75% completion. The inspection date is 12 March 2026.
What is near Riverside Views Capri 1?
Dubai Investments Park is listed at 10 minutes, Expo 2020 Venue at 12 minutes and Al Maktoum International Airport at 15 minutes. Pulse Pond Park is 2.4 km away.
How many apartments are left in Riverside Views Capri 1?
According to the Dubai Land Department (DLD) register, as of 23 Nov 2026 ≈20 of 824 apartments in Riverside Views Capri 1 have no registered sale; 804 have been sold to first buyers (98%). This is an estimate. This is registry data, not a developer availability list: please confirm current availability and prices with our sales team — leave a request on this page.
How can I buy an apartment in Riverside Views Capri 1?
Submit an enquiry via the form on this page or message us on WhatsApp — a Continental Club Property broker (RERA 31933) will help you choose a unit and send the brochure and payment plan.

Estimate a unit in this building from DLD sales

Based on 50 registered DLD sales in Riverside Views Capri 1 between 16 Mar 2026 and 24 Nov 2026: median 15 591 AED/m² (1 448 AED/sq ft); half of the deals fell between 15 344 and 15 788 AED/m². This is transaction statistics, not a valuation of a specific unit: floor, view, finish and condition move the price.

TypeIndicative priceDealsMedian AED/m²Median area, m²
1 BRAED 1 491 0004715 61695.5
2 BRAED 2 022 000315 339131.8
Get an exact valuation

Source: Dubai Land Department open data, the latest up to 50 sales in the building; areas as registered; refreshed daily. Deals outside 3,000–200,000 AED/m² are excluded.

PDF shortlist · updated 1 November 2026

DAMAC Riverside Views: new projects and prices

13 projects · prices from DLD and developers

  1. Riverside Views Azure 2 Riverside Views Azure 2 DAMAC Riverside Views · Studio, 1 BR from AED 628,000
  2. Riverside Views Marine 2 Riverside Views Marine 2 DAMAC Riverside Views · 1–2 BR from AED 888,000
  3. Damac Riverside Views - Capri 2 Damac Riverside Views - Capri 2 DAMAC Riverside Views · Studio, 1–2 BR from AED 959,000

10 more in the PDF: prices, handover dates, payment plans

The PDF opens instantly. Refreshed monthly from DLD data.

How much is your property in Riverside Views Capri 1 worth?

804 of 824 apartments have been sold to first buyers per the DLD register. DLD registrations, including resales: 807 (since 2025). We compare your unit with sales of the same layout here, not with asking prices. Free, reply within 24 hours.

By submitting the form you agree to the processing of your contact details, including for advertising analytics.

More projects by Damac Properties

All 196 projects by Damac Properties →

Nearby projects

For AI agents and researchers

Machine-readable mirrors of this page: Markdown · JSON. They carry the same figures as this page, each with its origin labelled.

How to cite:Riverside Views Capri 1 — Continental Club Property, from Dubai Land Department registry and developer data, 2026-11-24, https://continentalclub.ae/project/riverside-views-capri-1-damac-riverside-views/

Where should we send the shortlist?

The PDF downloads right after you submit. A manager gets in touch only if you ask.