by Meydan Group in District One West (Phase 1)
Mohammed Bin Rashid Al Maktoum City District One West – Phase 1 is a residential project by Meydan Group in District One West (Phase 1), Dubai, with construction 82.5% complete per the DLD registry.
Construction progress
- Status date25.06.2026
- DLD project number2696
Data from the Dubai Land Department project registry (updated 06.08.2026 09:55).
Recent transactions
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 04.08.2026 | 630.0 | 12 500 000 | |
| 03.08.2026 | 783.3 | 15 000 000 | |
| 28.07.2026 | 767.4 | 2 653 000 | |
| 20.07.2026 | 855.6 | 16 000 000 | |
| 20.07.2026 | 980.0 | 10 000 000 | |
| 08.07.2026 | 976.3 | 22 500 000 | |
| 26.06.2026 | 999.6 | 33 085 005 | |
| 25.06.2026 | 1 069.4 | 4 200 000 | |
| 22.06.2026 | 858.0 | 3 224 800 | |
| 19.06.2026 | 1 555.5 | 34 000 000 | |
| 09.06.2026 | 807.7 | 3 575 000 | |
| 04.05.2026 | 1 812.2 | 70 300 000 | |
| 30.04.2026 | 980.0 | 29 910 000 | |
| 22.04.2026 | 858.0 | 18 400 000 | |
| 31.03.2026 | 630.0 | 9 500 000 | |
| 26.03.2026 | 775.0 | 13 600 000 | |
| 26.03.2026 | 775.2 | 13 800 000 | |
| 26.03.2026 | 630.0 | 9 700 000 | |
| 24.03.2026 | 828.1 | 17 500 000 | |
| 13.03.2026 | 630.0 | 8 500 000 |
Dubai Land Department transaction registry, updated 2026-08-06. Explore Dubai property transactions →
About the project
Mohammed Bin Rashid Al Maktoum City District One West – Phase 1 is a gated villa community in Mohammed Bin Rashid City, within the Ghadeer Al Tair area. Meydan Group is the developer. The project is active, with construction recorded at 82.51% completion at the inspection dated 25 June 2026.
A gated villa community centred on the lagoon
District One West – Phase 1 is planned around a Signature Crystal Lagoon, which forms the central feature of the gated community. The development is configured as a villa-only residential phase, with homes arranged in several bedroom and storey configurations. Its setting in Mohammed Bin Rashid City places it within one of Dubai’s large master-planned urban districts. The registered project started on 1 December 2023 and has a recorded total area of 397,734.40. The scheme is identified as Mohammed Bin Rashid Al Maktoum City District One West – Phase 1 under project number 2696.
Villa configurations
The phase comprises 467 villas. There are 139 four-bedroom villas arranged over ground and first floors, and 235 five-bedroom villas arranged over ground and first floors. A further nine five-bedroom villas extend across ground floor plus two upper levels. The larger home formats include 56 six-bedroom villas configured over ground floor plus two upper levels, alongside 28 seven-bedroom villas configured with a basement, ground floor and two upper levels. These five bedroom-and-storey formats establish a range from four-bedroom villas to seven-bedroom homes within the same phase.
Crystal Lagoon and residential setting
The Signature Crystal Lagoon is the development’s defining shared feature and sits at the centre of the community. District One West – Phase 1 is a gated development, giving the phase a clearly defined residential boundary. The villa mix includes larger six- and seven-bedroom formats as well as four- and five-bedroom homes, allowing purchasers to focus on the configuration that fits their household requirements. The development’s residential programme is made up of villas rather than apartment buildings, and the official project description identifies no buildings within the phase.
Mohammed Bin Rashid City location
District One West – Phase 1 is located in Mohammed Bin Rashid City, with Ghadeer Al Tair identified as its area. Published driving times from the phase place Dubai Mall at 14 minutes, Burj Al Arab at 20 minutes, Dubai International Airport at 21 minutes, Palm Jumeirah at 22 minutes, The Walk JBR at 26 minutes and Al Maktoum International Airport at 41 minutes. Red Line station R26 is listed at a distance of 4,829 metres. Nearby education references include Bilingual French International School at 2.1 kilometres and Springdales School at 2.3 kilometres.
Construction status
District One West – Phase 1 has active project status. Construction began on 1 December 2023. The completion ratio is recorded as 82.51% following the inspection dated 25 June 2026. The project has 468 total units recorded in the project data, while the villa composition specifies 467 villas across the listed four-, five-, six- and seven-bedroom configurations. Project number 2696 is used for both the project record and the Dubai Land Department project reference.
Project scale and home mix
The phase is designed as a low-density residential enclave within Mohammed Bin Rashid City, with a recorded total area of 397,734.40. Its accommodation programme is weighted towards five-bedroom villas, which account for 244 homes when the two five-bedroom formats are combined. Four-bedroom villas account for 139 homes, while the six-bedroom and seven-bedroom formats add 84 larger residences. The range of vertical layouts runs from ground-plus-one homes to residences with a basement, ground floor and two upper levels. This provides a defined choice of bedroom counts and internal storey arrangements within a single gated community.
Developer
Meydan Group is the developer of District One West – Phase 1 and is identified as the master developer for the project. The development is registered under Meydan Group (L.L.C). Meydan Group is responsible for the project’s villa community in Mohammed Bin Rashid City, including the phase centred on the Signature Crystal Lagoon. The project began in December 2023 and remains active, with the latest recorded construction completion ratio at 82.51%.