by Meydan Group in District One West (Phase 2)
Mohammed Bin Rashid Al Maktoum City -District One West – Phase 2 is a residential project by Meydan Group in District One West (Phase 2), Dubai, with handover 19.11.2027, construction 40.9% complete per the DLD registry.
Construction progress
- Handover19.11.2027
- Status date14.07.2026
- DLD project number3200
Data from the Dubai Land Department project registry (updated 06.08.2026 09:55).
Recent transactions
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 29.07.2026 | 812.7 | 24 400 000 | |
| 21.07.2026 | 655.8 | 13 500 000 | |
| 05.06.2026 | 812.7 | 23 712 832 | |
| 20.05.2026 | 596.8 | 5 460 320 | |
| 11.05.2026 | 600.0 | 13 000 000 | |
| 13.04.2026 | 630.0 | 14 200 000 | |
| 09.04.2026 | 668.9 | 13 900 000 | |
| 09.04.2026 | 630.0 | 13 900 000 | |
| 01.04.2026 | 600.0 | 13 070 800 | |
| 01.04.2026 | 613.8 | 13 120 800 | |
| 19.02.2026 | 600.0 | 14 550 000 | |
| 10.02.2026 | 630.0 | 14 000 000 | |
| 03.02.2026 | 655.8 | 14 100 000 | |
| 09.01.2026 | 630.0 | 13 550 000 | |
| 08.01.2026 | 615.0 | 14 350 000 | |
| 25.12.2025 | 600.0 | 13 140 800 | |
| 18.12.2025 | 784.0 | 23 250 000 | |
| 28.11.2025 | 812.9 | 24 000 000 | |
| 19.11.2025 | 613.8 | 13 600 000 | |
| 05.11.2025 | 613.8 | 13 700 000 |
Dubai Land Department transaction registry, updated 2026-08-06. Explore Dubai property transactions →
About the project
District One West Phase 2 is a gated villa community in Mohammed Bin Rashid City, Dubai, developed by Meydan Group. The project comprises 229 villas arranged around a Signature Crystal Lagoon, landscaped parks and community facilities. It is active, with 40.91% completion recorded at the inspection dated 14 July 2026 and scheduled completion on 19 November 2027.
A gated villa community in Mohammed Bin Rashid City
District One West Phase 2 forms part of the wider District One masterplan in Mohammed Bin Rashid City. The community is planned as a low-rise residential setting centred on the Signature Crystal Lagoon, with villas also facing parks and landscaped open spaces. Its 229 villas follow one of 10 prototypes, creating a defined collection of house designs within the phase. The layout combines private homes with landscaped corridors, community gardens, play areas and open-air activity spaces. A clubhouse and retail facilities are included within the community provision. The project start date is 20 November 2024, and the development is scheduled to complete on 19 November 2027.
Architecture and living spaces
The villas use a contemporary architectural language defined by bold geometry, clean lines and large openings. Exterior treatments combine white plaster with warm wood textures, while the four-bedroom typologies include architectural overhangs. Homes are designed with substantial internal volumes, high ceilings and floor-to-ceiling glazing that connects living areas to gardens, terraces and lagoon-facing or park-facing outlooks. Principal rooms feature polished marble flooring and neutral colour schemes. Private outdoor terraces form part of the residential design, alongside expansive windows and garage space. The homes are arranged to give residents a relationship with both private outdoor areas and the wider landscaped setting of the community.
Villa configurations
District One West Phase 2 comprises three villa types with four, five and six bedrooms. The 229 homes are distributed across 10 prototypes, with the collection designed as private luxury houses rather than apartment buildings. Four-bedroom homes are identified by their architectural overhangs, while all villa configurations are described with generous indoor volumes, extensive glazing and outdoor terraces. The community’s setting gives villas either Crystal Lagoon views or outlooks across parks and landscaped open spaces. High ceilings, marble flooring in principal rooms and large-format windows are part of the interior description for the phase.
Lagoon, parks and community amenities
The Signature Crystal Lagoon is the central feature of District One West Phase 2. Around it, the community includes landscaped parks, community gardens and outdoor leisure spaces. Residents have access to a clubhouse and retail facilities, alongside outdoor gym facilities, sport courts and children’s play areas. These amenities are organised within landscaped corridors between villa clusters, creating communal areas alongside the private homes. The sporting and recreational provision is focused on open-air activity, with spaces for fitness, play and community use. The phase also includes gardens and parks that sit alongside the lagoon-oriented residential layout.
Connections and nearby destinations
District One West Phase 2 is located in Mohammed Bin Rashid City, with Downtown Dubai and Dubai Mall each listed at 5.3 km, Business Bay at 4.2 km and DIFC at 6.9 km. Mall of the Emirates is listed at 8.5 km, while Global Village is 9.3 km away. Dubai International Airport is listed at 14.5 km, Palm Jumeirah at 14.6 km, Dubai Marina at 15.8 km and JBR Beach at 16.6 km. The nearest recorded Dubai Metro access is on the Red Line at 4,957 metres. Bilingual French International School is listed at 2.1 km and Springdales School at 2.3 km from the phase.
Construction progress and scheduled completion
The project is active and has a recorded completion ratio of 40.91%. Its construction started on 20 November 2024. The inspection associated with the recorded progress was dated 14 July 2026, and the project record was updated on 17 July 2026. Scheduled completion is 19 November 2027. The phase contains 229 villas, matching the community’s planned residential count. The construction programme covers the delivery of the villa community, its Crystal Lagoon-centred landscape and the associated community amenities, including the clubhouse and retail facilities.
Meydan Group
Meydan Group is the developer of District One West Phase 2. The company is delivering the phase within the District One masterplan in Mohammed Bin Rashid City. This project is planned as a 229-villa gated community, with four-, five- and six-bedroom configurations across 10 prototypes. Its community design combines private villas with the Signature Crystal Lagoon, landscaped parks, community gardens, outdoor fitness facilities, sport courts, children’s play areas, a clubhouse and retail provision. The scheduled completion date for the phase is 19 November 2027.


