by Al Madar Properties in Dubai Islands
La Crystal is a residential project by Al Madar Properties in Dubai Islands, Dubai, with handover 30.09.2028.
Floor plans
Payment plan 50/50
- Down payment10%
- During construction40%
- On handover50%
Construction progress
- Handover30.09.2028
- Status date01.10.2025
- DLD project number4059
Data from the Dubai Land Department project registry (updated 09.08.2026 09:55).
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: Al Madar Properties · District: Dubai Islands
Places nearby
About the project
La Crystal is a single residential building by Al Madar Properties in Dubai Islands. The development contains 64 units and is configured as a G+2P+8F+R building. It is active with completion recorded at 0.00%, following an inspection dated 1 October 2025, and has a completion date of 30 September 2028.
The development
La Crystal is planned as one residential building with a ground level, two podium levels, eight floors and a roof level. The project contains 64 units, and its recorded total area is 7,972.16. It is located in Dubai Islands, a five-island waterfront masterplan on Dubai’s northern coastline. Dubai Islands was formerly known as Deira Islands and was rebranded in August 2022. The five islands are Marina Island, Central Island, Shore Island, Golf Island and Elite Island. The wider destination combines residential, hospitality, marina and public-realm components.
Project status and timeline
La Crystal is recorded as active. Its completion ratio is 0.00%, based on an inspection dated 1 October 2025. The project start date is 1 October 2025, and the completion date is 30 September 2028. The development consists of one building and 64 units. These dates place La Crystal within the current development cycle at Dubai Islands, where infrastructure works, residential launches, marina facilities, hotels, resorts and public-realm components form part of the wider masterplan.
Dubai Islands setting
Dubai Islands comprises Marina Island, Central Island, Shore Island, Golf Island and Elite Island. Central Island is the largest island and is designed around Deira Mall and The Night Market. The Night Market is planned to include more than 5,300 shops and 100 quayside cafés and restaurants. Shore Island is planned for sports and resort uses, while Golf Island includes an 18-hole golf course and wellness enclaves. Elite Island is earmarked for waterfront villas. The wider masterplan includes residential areas, hotels, resorts, public beaches, parks and a marina network.
Marina, beaches and resorts
Nakheel Marinas Dubai Islands launched in May 2023. The marina is designed for up to 13 superyachts at one time, with 248 wet berths for vessels up to 47 metres and 40 dry berths for trailers up to 20 metres. Marina facilities include parking, showers, washrooms, a launderette, dock assistance available 24 hours a day, club-car transfers, utilities and waste services. Several beaches at Dubai Islands have Blue Flag accreditation. The wider destination includes 37 hotels and resorts, while RIU and Centara resorts are already open from the earlier phase of the development.
Road and metro connections
Dubai International Airport is 9.6 km from Dubai Islands by road. Downtown Dubai is 13.8 km away, The Dubai Mall is 13.7 km away, Dubai International Financial Centre is 12.1 km away and Business Bay is 15.3 km away. Palm Jumeirah is 28.3 km away, while Dubai Marina is 31.1 km away and JBR Beach is 31.7 km away. The nearest metro access is Green Line station G22, 4.7 km from Dubai Islands. Planned and ongoing road connections include bridge works associated with the Shindagha Corridor Project.
Developer
Al Madar Properties is the developer of La Crystal. The project is assigned number 4059 and is a single-building residential development in Dubai Islands. It has 64 units and a recorded total area of 7,972.16. The development period runs from 1 October 2025 to 30 September 2028. At the inspection dated 1 October 2025, completion was recorded at 0.00% and the project status was active.