Developer: Damac Mry Investment · DAMAC Riverside Views
Damac Riverlink is a residential project by Damac Properties in DAMAC Riverside Views, Dubai, with handover Q1 2029, construction 0.4% complete per the DLD registry, 38 units.
Every figure carries its origin: “DLD registry” is taken from the Dubai Land Department register, “Developer supplied” is stated by the developer, “Our calculation” is computed by us from the first two. Developer prices change without notice — confirm before you commit. Methodology
All Dubai projects handing over in 2029 →
Data from the Dubai Land Department project registry (updated 10.09.2026 09:55).
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: Damac Properties · District: DAMAC Riverside Views
Damac Riverlink is an active residential project by Damac Mry Investment in DAMAC Riverside Views, within Dubai Investments Park 2. The project has 38 units across a recorded total area of 9,014.83 square metres. Construction completion is recorded at 0.00%, with completion scheduled for 31 March 2029.
Damac Riverlink forms part of DAMAC Riverside Views, a waterfront residential community in Dubai Investments Park 2. The wider community is arranged around a central man-made river, with mid-rise apartment buildings placed in a linear formation along the water. Its master plan is divided into eight colour-themed clusters: Teal, Azure, Marine, Indigo, Royal, Capri, Sky and Pacific. Named buildings and phases within the community include Riverside Views Marine 1 to 4, Riverside Views Azure 1 and 2, and Riverside Views Capri 1. The community plan combines residential buildings with shared public, leisure and wellness spaces along the waterfront.
Damac Riverlink is registered as a 38-unit project with a total area of 9,014.83 square metres. Its status is active, and the recorded construction completion ratio is 0.00%. The scheduled construction start date is 13 July 2026, while the recorded completion date is 31 March 2029. These dates position Riverlink as a future-delivery project within the DAMAC Riverside Views community. The project is identified under project number 4349.
DAMAC Riverside Views is planned as a neighbourhood centred on its artificial watercourse. The residential blocks are described as more than 20 mid-rise buildings arranged along the river, with themed clusters forming the wider layout. Dedicated public spaces, communal facilities, food concepts and entertainment features are integrated into the master plan. Waterfront elements include a floating cinema, floating opera stage and floating deck. A Portofino island restaurant is planned to be accessed by boat, while live-cooking stations and outdoor barbecue areas form part of the community dining and gathering provision. An amphitheatre and event lawn are also included for social and cultural occasions.
The DAMAC Riverside Views amenity programme includes a clubhouse, retail area, games zone, climbing wall and Kidz Adventure Land. The community’s leisure offering also covers public-event spaces and waterfront entertainment features. Fitness and wellness facilities include aquatic exercise areas, outdoor calisthenics stations, an outdoor fitness zone, and a spa for massages and holistic treatments. The plan also includes a peace room and therapeutic lakes infused with essential oils. A hydroponic farm and community spaces for cultural events and socialising are part of the proposed mix. These facilities are distributed within the wider Riverside Views master plan rather than described as standalone Riverlink-only amenities.
Damac Riverlink is located in DAMAC Riverside Views, within Dubai Investments Park 2. The community occupies a waterfront plot and is served by local road links in Dubai Investments Park 2. Its internal plan places residential buildings, shared facilities and dining or entertainment spaces around the central river. South View School is identified as the closest school referenced for the community, at 3.5 km from Riverside Views. The nearest noted Dubai Metro access is on the Red Line at station R74, with a recorded straight-line distance of 7,972 metres from the site.
The recorded completion date for Damac Riverlink is 31 March 2029. The project’s scheduled start date is 13 July 2026. It is currently classified as active, with construction completion recorded at 0.00% as of the latest inspection dated 19 January 2026. Buyers considering the project can therefore assess it as an early-stage development with a recorded completion schedule in 2029.
Damac Riverlink is developed by Damac Mry Investment. The developer is responsible for a project located within the larger DAMAC Riverside Views master plan in Dubai Investments Park 2. Riverlink’s 38-unit scale, active project status and 31 March 2029 completion schedule are recorded for this individual development. The surrounding Riverside Views plan provides the waterfront setting, themed clusters and communal amenity framework associated with the location.
Dubai market as a whole: prices, transactions and trends (DLD data) →
We will send floor plans, the payment plan and available units for this project.
Project data comes from the Dubai Land Department (DLD) registry.
Machine-readable mirrors of this page: Markdown · JSON. They carry the same figures as this page, each with its origin labelled.
How to cite:Damac Riverlink — Continental Club Property, from Dubai Land Department registry and developer data, 2026-08-06, https://continentalclub.ae/project/damac-riverlink-damac-riverside-views/