Gallery

On map

Cybele By Wadan is a residential project by Wadan Real Estate Development in DubaiLand Residence Complex, Dubai, with handover 30.12.2027, construction 2% complete per the DLD registry.

Construction2%

Payment plan 70/30

70%30%
  • During construction70%
  • On handover30%

Construction progress

2.03%
  • Handover30.12.2027
  • Status date27.07.2026
  • DLD project number4222

Data from the Dubai Land Department project registry (updated 09.08.2026 09:55).

Construction progress 10
27 July 2026 2.03%
Cybele By Wadan, DubaiLand Residence Complex construction progress — 27 July 2026, 2.03% complete, photo 1 of 6Cybele By Wadan, DubaiLand Residence Complex construction progress — 27 July 2026, 2.03% complete, photo 2 of 6Cybele By Wadan, DubaiLand Residence Complex construction progress — 27 July 2026, 2.03% complete, photo 3 of 6Cybele By Wadan, DubaiLand Residence Complex construction progress — 27 July 2026, 2.03% complete, photo 4 of 6Cybele By Wadan, DubaiLand Residence Complex construction progress — 27 July 2026, 2.03% complete, photo 5 of 6Cybele By Wadan, DubaiLand Residence Complex construction progress — 27 July 2026, 2.03% complete, photo 6 of 6

Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.

Recent transactions

DateTypeSize, m²Price, AED
24.07.20261 BR78.81 072 464
23.07.20262 BR109.11 625 814
21.07.20261 BR78.81 019 695
13.07.20262 BR124.11 602 742
29.06.2026Studio39.9501 918
25.06.2026Studio39.8586 335
23.06.20262 BR118.51 628 531
23.06.2026Studio41.6574 464
23.06.2026Studio41.6688 678
11.06.20262 BR118.51 581 098
11.06.2026Studio41.6689 170
09.06.20262 BR126.01 755 687
04.06.2026Studio62.4839 528
03.06.2026Studio41.5708 389
03.06.20261 BR64.5883 111
03.06.2026Studio41.6687 447
03.06.2026Studio39.9673 497
02.06.2026Studio41.6674 098
02.06.20263 BR147.71 941 507
02.06.2026Studio39.9633 610

Dubai Land Department transaction registry, updated 2026-08-08. Explore Dubai property transactions →

Places nearby

🌳 Silicon North Park · 4.0 km

About the project

Cybele By Wadan is a 232-unit development by Wadan Real Estate Development in DubaiLand Residence Complex, Dubai. The project is active, with construction recorded at 2.03% completion following an inspection dated 27 July 2026. Its recorded completion date is 30 December 2027.

Project overview

Cybele By Wadan is registered under project number 4222 and has a total area recorded as 16,225.58. The development contains 232 units. Its recorded start date is 30 December 2025, and the construction status is active. Construction progress stood at 2.03% on the inspection dated 27 July 2026. The project information was updated on 31 July 2026. The site is located in Dubai at latitude 25.09296799 and longitude 55.37430954, within DubaiLand Residence Complex. The recorded completion date for the development is 30 December 2027.

DubaiLand Residence Complex setting

Cybele By Wadan is located in DubaiLand Residence Complex, a residential community within the Wadi Al Safa 5 area of DubaiLand. The community comprises multiple residential buildings and newer construction plots, with landscaped areas, roads and pavements. Its layout includes landscaped roundabouts and junctions, alongside community green areas. DubaiLand Residence Complex is part of the wider DubaiLand cluster and sits north-west of central Dubai. The neighbourhood contains a mix of established residential blocks and newer development sites. Road and streetscape improvements to main junctions within the community are complete or in their final stages. The project’s location places it within a community with local parks, schools and leisure destinations in the surrounding DubaiLand area.

Parks, schools and local recreation

Several green spaces are close to Cybele By Wadan. DLRC North Park is 0.3 km away, DRC Central Community Hub is 0.4 km away, and DRC Mixed Use West Park is 0.7 km away. Across DubaiLand Residence Complex, the outdoor provision includes two mid-sized parks in each half of the community, as well as smaller peripheral parks with sports facilities and children’s play areas. The Aquila School is 0.4 km from the project area, while GEMS FirstPoint School is 0.6 km away. IMG Worlds of Adventure is 5.7 km away and Global Village is 7.3 km away. Ras Al Khor Wildlife Sanctuary is listed at 11.8 km from the project.

Road connections and destinations

DubaiLand Residence Complex is primarily road-oriented. The nearest Green Line metro station, G30, is listed at 14.6 km away and is not within walking distance, making road travel the main mode of connection from the community. The Dubai Mall is 15.4 km away, Business Bay is 15.5 km away, and Burj Khalifa and Downtown Dubai are 15.7 km away. Dubai International Financial Centre is 16.5 km away, while Dubai International Airport is 18.0 km away. Mall of the Emirates is 18.1 km away and Dubai Marina is 24.0 km away. The Track Meydan Golf is 9.9 km away, and Novo Cinema at IMG Worlds of Adventure is 5.7 km away.

Construction status and completion date

Cybele By Wadan is recorded as active. The latest stated inspection date is 27 July 2026, when completion was recorded at 2.03%. The project start date is 30 December 2025. The stated completion date is 30 December 2027. These dates establish the recorded construction timetable for the development. The project record was updated on 31 July 2026, and the development is identified by project number 4222. Buyers considering Cybele By Wadan can use the recorded completion date and construction percentage as the current project-stage reference points.

The developer

Cybele By Wadan is being developed by Wadan Real Estate Development. The company was founded in 2024. Wadan Real Estate Development is the developer name associated with the 232-unit project in DubaiLand Residence Complex.

Registered transactions in Cybele By Wadan

Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.

219deals since 2025
15 440AED per m², median
0%resale, the rest bought from the developer

What buyers actually paid

TypeSize, m²Price, AEDPer m²Deals
Studio42686 57516 347113
1 bedroom681 073 72815 79064
2 bedrooms1221 641 75313 45730
3 bedrooms1491 999 75213 42112

Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.

Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.

FAQ

Who is the developer of Cybele By Wadan?
Cybele By Wadan is developed by Wadan Real Estate Development. The company was founded in 2024.
Where is Cybele By Wadan located?
The project is located in DubaiLand Residence Complex in Dubai, within the Wadi Al Safa 5 area of DubaiLand.
How many units are there at Cybele By Wadan?
Cybele By Wadan has 232 units.
What is the completion date for Cybele By Wadan?
The recorded completion date is 30 December 2027.
What is the construction status of Cybele By Wadan?
The project is active. Completion was recorded at 2.03% on 27 July 2026.
When did construction start at Cybele By Wadan?
The recorded project start date is 30 December 2025.
What is near Cybele By Wadan?
DLRC North Park is 0.3 km away, The Aquila School is 0.4 km away, and IMG Worlds of Adventure is 5.7 km away. Global Village is 7.3 km away.
Is there a metro station close to Cybele By Wadan?
The nearest listed Green Line metro station, G30, is 14.6 km away and is not within walking distance.
How can I buy an apartment in Cybele By Wadan?
Submit an enquiry via the form on this page or message us on WhatsApp — a Continental Club Property broker (RERA 31933) will help you choose a unit and send the brochure and payment plan.

Nearby projects

Request
Request