Developer: Imtiaz Developments · DubaiLand Residence Complex

Cove Living by Imtiaz

Cove Living by Imtiaz is a residential project by Imtiaz Developments in DubaiLand Residence Complex, Dubai, with prices from AED 580 000, handover Q2 2027, construction 63.4% complete per the DLD registry, 744 units, 790 DLD-registered sales since 2013.

Price fromAED 580 000Developer supplied
Unit typesStudio · 1 · 2 BR401–1 361 ft²DLD registry
HandoverQ2 2027Developer supplied
Construction63.4%DLD registry · checked 17.11.2026

Layouts and sizes

TypeUnitsTypical size, sq.ft
Studio508401–594
1 Bedroom170807–1 009
2 Bedroom601 298–1 361
Other units61 428–2 466

Size range excludes the smallest and largest 5% of units of each type.

All units are freehold. Data from the DLD registry.

Balcony or terrace per the DLD registry: almost every residential unit (100%). Typical size: Studio — ~94 sq.ft (8.7 m²); 1 Bedroom — ~136 sq.ft (13 m²); 2 Bedroom — ~392 sq.ft (36 m²). Median of registered units; for villas and townhouses the registry includes terraces and open areas.

Payment plan 70/30 70% before handover · 30% on handover

The purchase price is split into these stages.

120%Down payment
250%During construction
330%On handover

The exact schedule is confirmed in the sale agreement for the selected unit.

Compare with similar projects

A broker will compare this project with 3 similar ones: prices, handover dates and payment plans.

Compare in WhatsApp

Handover date & construction progress

63.39%
  • StatusActive
  • Construction started15.04.2024
  • HandoverQ2 2027
  • Status date17.11.2026
  • Progress between DLD inspections+16.18% (11.08.2026 → 17.11.2026)
  • Escrow bankFirst Abu Dhabi Bank
  • DLD project number2973

Data from the Dubai Land Department project registry (updated 22.11.2026 05:55).

Inspection history 10
025507510004.04.202417.11.2026
Actual, per inspections

Pace: 4.09% per month. At this rate 100% falls on 16.08.2027.

The pace is calculated from the past year of inspections. It is an estimate, not a developer commitment. For reference: across 1,175 completed projects the median pace is 2.48% per month and the median build takes 40 months.

Construction progress 120
11.08.2026 47.21%
Cove Living by Imtiaz, DubaiLand Residence Complex construction progress — 11 August 2026, 47.21% complete, photo 1 of 24Cove Living by Imtiaz, DubaiLand Residence Complex construction progress — 11 August 2026, 47.21% complete, photo 2 of 24Cove Living by Imtiaz, DubaiLand Residence Complex construction progress — 11 August 2026, 47.21% complete, photo 3 of 24Cove Living by Imtiaz, DubaiLand Residence Complex construction progress — 11 August 2026, 47.21% complete, photo 4 of 24Cove Living by Imtiaz, DubaiLand Residence Complex construction progress — 11 August 2026, 47.21% complete, photo 5 of 24Cove Living by Imtiaz, DubaiLand Residence Complex construction progress — 11 August 2026, 47.21% complete, photo 6 of 24Cove Living by Imtiaz, DubaiLand Residence Complex construction progress — 11 August 2026, 47.21% complete, photo 7 of 24Cove Living by Imtiaz, DubaiLand Residence Complex construction progress — 11 August 2026, 47.21% complete, photo 8 of 24Cove Living by Imtiaz, DubaiLand Residence Complex construction progress — 11 August 2026, 47.21% complete, photo 9 of 24Cove Living by Imtiaz, DubaiLand Residence Complex construction progress — 11 August 2026, 47.21% complete, photo 10 of 24Cove Living by Imtiaz, DubaiLand Residence Complex construction progress — 11 August 2026, 47.21% complete, photo 11 of 24Cove Living by Imtiaz, DubaiLand Residence Complex construction progress — 11 August 2026, 47.21% complete, photo 12 of 24Cove Living by Imtiaz, DubaiLand Residence Complex construction progress — 11 August 2026, 47.21% complete, photo 13 of 24Cove Living by Imtiaz, DubaiLand Residence Complex construction progress — 11 August 2026, 47.21% complete, photo 14 of 24Cove Living by Imtiaz, DubaiLand Residence Complex construction progress — 11 August 2026, 47.21% complete, photo 15 of 24Cove Living by Imtiaz, DubaiLand Residence Complex construction progress — 11 August 2026, 47.21% complete, photo 16 of 24Cove Living by Imtiaz, DubaiLand Residence Complex construction progress — 11 August 2026, 47.21% complete, photo 17 of 24Cove Living by Imtiaz, DubaiLand Residence Complex construction progress — 11 August 2026, 47.21% complete, photo 18 of 24Cove Living by Imtiaz, DubaiLand Residence Complex construction progress — 11 August 2026, 47.21% complete, photo 19 of 24Cove Living by Imtiaz, DubaiLand Residence Complex construction progress — 11 August 2026, 47.21% complete, photo 20 of 24Cove Living by Imtiaz, DubaiLand Residence Complex construction progress — 11 August 2026, 47.21% complete, photo 21 of 24Cove Living by Imtiaz, DubaiLand Residence Complex construction progress — 11 August 2026, 47.21% complete, photo 22 of 24Cove Living by Imtiaz, DubaiLand Residence Complex construction progress — 11 August 2026, 47.21% complete, photo 23 of 24Cove Living by Imtiaz, DubaiLand Residence Complex construction progress — 11 August 2026, 47.21% complete, photo 24 of 24
27.04.2026 29.49%
Cove Living by Imtiaz, DubaiLand Residence Complex construction progress — 27 April 2026, 29.49% complete, photo 1 of 12Cove Living by Imtiaz, DubaiLand Residence Complex construction progress — 27 April 2026, 29.49% complete, photo 2 of 12Cove Living by Imtiaz, DubaiLand Residence Complex construction progress — 27 April 2026, 29.49% complete, photo 3 of 12Cove Living by Imtiaz, DubaiLand Residence Complex construction progress — 27 April 2026, 29.49% complete, photo 4 of 12Cove Living by Imtiaz, DubaiLand Residence Complex construction progress — 27 April 2026, 29.49% complete, photo 5 of 12Cove Living by Imtiaz, DubaiLand Residence Complex construction progress — 27 April 2026, 29.49% complete, photo 6 of 12Cove Living by Imtiaz, DubaiLand Residence Complex construction progress — 27 April 2026, 29.49% complete, photo 7 of 12Cove Living by Imtiaz, DubaiLand Residence Complex construction progress — 27 April 2026, 29.49% complete, photo 8 of 12Cove Living by Imtiaz, DubaiLand Residence Complex construction progress — 27 April 2026, 29.49% complete, photo 9 of 12Cove Living by Imtiaz, DubaiLand Residence Complex construction progress — 27 April 2026, 29.49% complete, photo 10 of 12Cove Living by Imtiaz, DubaiLand Residence Complex construction progress — 27 April 2026, 29.49% complete, photo 11 of 12Cove Living by Imtiaz, DubaiLand Residence Complex construction progress — 27 April 2026, 29.49% complete, photo 12 of 12

84 more photos in the DLD register

Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.

Registered transactions in Cove Living by Imtiaz

Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.

790deals since 2013
13 820AED per m², median
0%resale, the rest bought from the developer
-17%over the past year

The yearly figure compares the last 12 months with the 12 before them: calendar years would not work, the current one is unfinished. The district moved 0% over the same period, so the building lagged.

What buyers actually paid

TypeSize, m²Price, AEDPer m²Deals
Studio43632 64614 713529
1 bedroom75906 99812 093188
2 bedrooms1241 347 78610 86964

Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.

How the price per square metre moved

From 2024 to 2026 — -4% on the price per square metre in this building. The district moved +21% over the same period, so the building lagged the market.

13 7062024——
15 9312025——
13 2152026*——

Top to bottom: purchase price per m², year, annual rent per m², gross yield.

All figures are medians. Years with fewer than eight deals are skipped; rent is shown where there are at least twenty contracts. The yield is gross — service charges are not published in the register.

* 2026 is still in progress and its bar covers part of the year. The growth figure above uses completed years.

Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.

Recent transactions

DateTypeSize, m²Price, AED
27.10.2026Studio49.9625 000
12.10.20261 BR75.21 000 000
08.10.20261 BR75.2922 000
08.10.2026Studio39.0600 000
06.10.2026Studio55.2730 000
21.09.20261 BR75.0950 000
17.09.20261 BR93.61 010 221
08.09.2026Studio41.8607 939
07.09.2026Studio39.2618 013
24.08.20261 BR92.91 101 647
21.08.2026Studio51.6613 739
07.08.2026Studio39.2585 000
30.07.20261 BR75.0880 000
23.07.20261 BR75.4960 000
20.07.2026Studio41.8677 336
15.07.2026Studio44.1584 359
15.07.2026Studio51.6655 875
19.06.2026Studio38.9653 999
10.06.20261 BR75.0825 000
20.05.2026Studio37.3576 926
13.05.2026Studio43.0701 654
11.05.2026Studio43.3607 720
11.05.2026Studio35.5660 000
14.04.20262 BR123.61 309 749
08.04.20262 BR126.51 459 647
01.04.20262 BR123.61 400 000
16.02.2026Studio42.9557 233
06.02.2026Studio36.1627 061
02.02.2026Studio48.2698 300
21.01.2026Studio44.2699 745
19.01.20261 BR75.4923 565
06.01.20261 BR75.0940 000
26.11.2025Studio44.2704 307
23.10.2025Studio48.4816 136
20.10.2025Studio44.2671 000
08.10.2025Studio50.5701 387
29.09.20251 BR75.1702 308
16.09.20251 BR75.1961 353
15.09.2025Studio43.4765 804
12.09.2025Studio42.9668 464
12.09.2025Studio39.4672 110
18.08.20251 BR75.1920 000
28.07.20251 BR92.7915 000
15.07.2025Studio38.7600 000
10.07.2025Studio46.1715 591
09.07.2025Studio43.4726 152
16.06.2025Studio42.9788 808
16.06.2025Studio42.9704 744
04.06.2025Studio43.4813 701
02.06.20251 BR75.01 000 000

Dubai Land Department transaction registry, updated 21.11.2026. Explore Dubai property transactions →

Mortgage for this project

For UAE residents the down payment starts at 20% with terms up to 25 years. Indicative monthly payment for prices from 580 000 AED is 2 449 AED.

Calculate mortgage

Estimates only; not a bank approval.

Amenities

  • Padel court
  • Running track
  • Kids pool
  • Kids play area
  • Sitting area
  • BBQ area
  • Family pool
  • Pool bar
  • Paradise pool
  • Mini golf
  • Indoor gym
  • Outdoor gym
  • Club room
  • Sauna and steam
  • Yoga pool
  • Sun beds
  • Infinity pool
  • Serene cabanas
  • Open cinema
  • Electric vehicle recharge station
  • Visitors parking
  • Park access
  • Purified drinking water
  • Rooftop pool
  • Private pool
  • Business center
  • Sky garden
Cove Living by Imtiaz

Your broker for this project

Vladimir Malin

Vladimir Malin

Senior Broker · Continental Club Property · RERA ORN 31933

Answers questions about Cove Living by Imtiaz: current availability, payment plan, DLD registration. English and Russian.

Get the presentation and prices

We will send floor plans, the payment plan and available units for this project.

By submitting the form you agree to the processing of your contact details, including for advertising analytics.

Project data comes from the Dubai Land Department (DLD) registry.

Every figure carries its origin: “DLD registry” is taken from the Dubai Land Department register, “Developer supplied” is stated by the developer, “Our calculation” is computed by us from the first two. Developer prices change without notice — confirm before you commit. Methodology

About the project

Cove Living by Imtiaz is a residential development by Imtiaz Developments in DubaiLand Residence Complex, within Wadi Al Safa 5. The project comprises one commercial and residential building with 744 units and is under construction. Construction completion is recorded at 63.39%, with handover planned for Q2 2027.

The project and building

Cove Living by Imtiaz is planned as a single commercial and residential building with two basement levels, a ground floor, three podium levels, a mechanical floor and 30 residential floors above. The building is designed with a concrete structure, blockwork, and internal and external finishes. The project is positioned as a vertical community, with facilities arranged across different levels from the ground floor to the rooftop. Its interiors are presented with timeless materials and finished apartments, while the residential offering includes studio, one-bedroom and two-bedroom layouts. The development contains 744 units in total and has a recorded start date of 15 April 2024.

Apartment collection

The apartment collection includes designer studio apartments, executive studio apartments, one-bedroom apartments and two-bedroom apartments. Cove Living by Imtiaz is presented as offering fully furnished apartments. The interiors are described through soft hues, premium flooring, ambient lighting and rose-gold accents, with large windows included in the residential design. The project’s focus on furnished homes extends across the studio and apartment categories rather than being limited to a single layout. Buyers can choose between two studio categories as well as one- and two-bedroom homes within the 744-unit building.

Pools, fitness and outdoor facilities

The amenity programme includes a rooftop pool, infinity pool, family pool, kids’ pool, Paradise pool and yoga pool. Poolside facilities include a pool bar, sun beds and serene cabanas. Paradise Island is named as an amenity setting within the development, alongside a padel court, running track, mini golf, sitting area, children’s play area and BBQ area. Fitness facilities comprise an indoor gym, outdoor gym, sauna and steam facilities. The project also includes a club room, business center, sky garden and open cinema. Direct park access is included, alongside park access within the amenity offering.

Everyday services and building features

Cove Living by Imtiaz includes an electric vehicle recharge station, visitors’ parking and purified drinking water. The amenity list also includes a private pool, while the wider pool offering spans family, children’s, rooftop, infinity and Paradise pools. The building’s social and work-oriented spaces include a club room and business center, with the open cinema and BBQ area providing further communal settings. Security, retail outlets, restaurants, dining outlets, a supermarket and a health care centre are also included in the listed facilities. The project combines these shared amenities with furnished apartment interiors and direct access to a park.

DubaiLand Residence Complex location

Cove Living by Imtiaz is located in DubaiLand Residence Complex, a residential community within Wadi Al Safa 5. Dubai Outlet Mall, Academic City and Silicon Oasis are each listed at five minutes from the project. Global Village, IMG Worlds, Hamdan Sports Complex, Desert Palm Polo Club, Dubai Safari Park and Meydan Racecourse are listed at 10 minutes. Sheikh Zayed Road is listed at 15 minutes, along with Arabian Ranches 1 and 2. Dubai International Airport, Downtown Dubai, Dubai Mall, Burj Khalifa, Dubai Frame, Dubai Creek and Mall of the Emirates are listed at 20 minutes. Dubai Marina, Palm Jumeirah, Ibn Battuta Mall, Expo City Dubai and Dubai Parks and Resorts are listed at 25 minutes.

Payment plan and handover

The published payment structure for Cove Living by Imtiaz is 70/30. Buyers make a 20% first payment, followed by 50% during construction and 30% on handover. Handover is planned for Q2 2027. The project’s recorded completion date is 15 April 2027, which falls within the stated handover quarter. Homes at Cove Living by Imtiaz have a starting price of AED 580,000. Construction is active, and the recorded completion ratio is 63.39%.

Imtiaz Developments

Cove Living by Imtiaz is developed by Imtiaz Developments, a company founded in 1993. The developer is responsible for the 744-unit project in DubaiLand Residence Complex. The development brings together furnished studio, one-bedroom and two-bedroom apartments with facilities that include pools, fitness spaces, a business center, a sky garden, direct park access and an electric vehicle recharge station. The scheduled Q2 2027 handover and 70/30 payment structure form part of the project’s purchase terms.

Service charge: what to expect

The building is still under construction, so it has no RERA-approved budget yet — that comes after handover. The figures below are what already-completed buildings in the area pay.

Area median13.86 AEDper sq ft per year · 149 AED/m²
Range in the area4.51 – 19.01AED per sq ft · 28 buildings
A 1,000 sq ft unit≈ 13,860 AEDper year at the median · ≈ $3,774
vs Dubai median▼ -13.5%Dubai 16.02 AED/sq ft

Check the charge for a specific building →

Median across 28 completed buildings in DubaiLand Residence Complex for 2026, from the DLD service charge index (Mollak). This is an area benchmark, not this project’s rate: RERA approves that after handover and it may land either side of the median.

Frequent questions

Who is the developer of Cove Living by Imtiaz?
Cove Living by Imtiaz is developed by Imtiaz Developments, founded in 1993.
Where is Cove Living by Imtiaz located?
The project is in DubaiLand Residence Complex, within Wadi Al Safa 5.
What is the starting price at Cove Living by Imtiaz?
The starting price is AED 580,000.
When is the Cove Living by Imtiaz handover date?
Cove Living by Imtiaz handover (completion) is scheduled for Q2 2027 (developer data). The DLD register lists 15 April 2027. Construction progress was 63.39% at the DLD inspection of 17 November 2026. The date and progress on this page are updated from the DLD register. For current availability, prices and resale (assignment) options, send an enquiry on this page.
What is the Cove Living by Imtiaz payment plan?
The payment plan is 70/30: 20% as the first payment, 50% during construction and 30% on handover.
What is the construction status of Cove Living by Imtiaz?
The project is under construction and active. Its recorded completion ratio is 63.39%.
How many units are in Cove Living by Imtiaz?
Cove Living by Imtiaz has 744 units in one commercial and residential building.
What apartment types are available at Cove Living by Imtiaz?
The collection includes designer studios, executive studios, one-bedroom apartments and two-bedroom apartments.
What is nearby Cove Living by Imtiaz?
Dubai Outlet Mall, Academic City and Silicon Oasis are listed at five minutes. Global Village and IMG Worlds are listed at 10 minutes.
How can I buy an apartment in Cove Living by Imtiaz?
Submit an enquiry via the form on this page or message us on WhatsApp — a Continental Club Property broker (RERA 31933) will help you choose a unit and send the brochure and payment plan.

Estimate a unit in this building from DLD sales

Based on 50 registered DLD sales in Cove Living by Imtiaz between 2 Jun 2025 and 27 Oct 2026: median 13 956 AED/m² (1 297 AED/sq ft); half of the deals fell between 12 326 and 15 923 AED/m². This is transaction statistics, not a valuation of a specific unit: floor, view, finish and condition move the price.

TypeIndicative priceDealsMedian AED/m²Median area, m²
StudioAED 670 0003215 54443.1
1 BRAED 921 0001512 25775.1
2 BRAED 1 401 000311 331123.6
Get an exact valuation

Source: Dubai Land Department open data, the latest up to 50 sales in the building; areas as registered; refreshed daily. Deals outside 3,000–200,000 AED/m² are excluded.

PDF shortlist · updated 1 November 2026

DubaiLand Residence Complex: new projects and prices

30 projects · prices from DLD and developers

  1. Ag 7even Ag 7even DubaiLand Residence Complex · Studio, 1–2 BR from AED 485,000
  2. Ag 9ine Ag 9ine DubaiLand Residence Complex · Studio, 1–2 BR from AED 488,000
  3. Time 3 Time 3 DubaiLand Residence Complex · Studio, 1–3 BR from AED 490,000

27 more in the PDF: prices, handover dates, payment plans

The PDF opens instantly. Refreshed monthly from DLD data.

How much is your property in Cove Living by Imtiaz worth?

DLD has recorded 790 sales in this building since 2013, 3 of them resales. We compare your unit with sales of the same layout here, not with asking prices. Free, reply within 24 hours.

By submitting the form you agree to the processing of your contact details, including for advertising analytics.

More projects by Imtiaz Developments

All 44 projects by Imtiaz Developments →

Nearby projects

For AI agents and researchers

Machine-readable mirrors of this page: Markdown · JSON. They carry the same figures as this page, each with its origin labelled.

How to cite:Cove Living by Imtiaz — Continental Club Property, from Dubai Land Department registry and developer data, 2026-10-28, https://continentalclub.ae/project/cove-living-by-imtiaz-dubailand-residence-complex/

Where should we send the shortlist?

The PDF downloads right after you submit. A manager gets in touch only if you ask.