by Wasl properties in Ashwood Estates
Ashwood Estates is a residential project by Wasl properties in Ashwood Estates, Dubai, with handover 18.09.2028, construction 0.1% complete per the DLD registry.
Construction progress
- Handover18.09.2028
- Status date01.06.2026
- DLD project number4029
Data from the Dubai Land Department project registry (updated 07.08.2026 09:55).
About the project
Ashwood Estates is an active development of 187 detached villas by Jge Real Estate in the Jumeirah Golf Estates extension, within the Golf Course North parcel of The Next Chapter. The project is recorded in Me’Aisem First and is 5% complete, with completion scheduled for 18 September 2028.
A villa community within The Next Chapter
Ashwood Estates forms a gated residential enclave within the Jumeirah Golf Estates extension. The site sits in the Golf Course North parcel of The Next Chapter, a wider masterplan planned around an 18-hole golf course, country club, golf clubhouse, leisure facilities and a town centre. The development comprises G+1+R villas, with detached homes designed for family occupancy. The recorded total project area is 145,944.24 square metres, and the development has 187 units. Homes are arranged around private outdoor areas and are oriented towards open fairway views.
Villa layouts and private outdoor space
The detached villas have multiple en-suite bedrooms, built-in wardrobes and separate guest accommodation with dressing facilities. Ground floors are arranged around open-plan family living and dining areas, while service spaces are separated from the principal living areas. Each home includes a double-height entrance hall and provision for an internal lift connecting floors. Private open-to-sky courtyards incorporate water features and outdoor seating, alongside private swimming pools, barbecue zones, balconies and gated gardens. The villas also include separate maid and driver rooms with bathrooms, dedicated service entrances, and covered garages for up to three vehicles.
Interiors, kitchens and building systems
The external material palette combines stone cladding, laminated-glass balustrades, double-glazed aluminium windows, wood-look cladding and ceiling panels. Interior joinery uses veneer, with Calacatta and travertine feature stone. Floors are specified in light-beige marble or porcelain, while wet areas use terrazzo-look porcelain. Bathrooms include walk-in showers, free-standing baths, double basins and full-height tiling. Kitchens are fully fitted and include show-kitchen layouts, walk-in pantries, kitchen stores and separate laundries. Building systems include VRF ducted cooling, individual electricity, water and LPG meters, integrated home automation and provision for electric-vehicle charging.
Golf, sport and community facilities
The wider community infrastructure includes an 18-hole golf course, driving range, country club and golf clubhouse. Residents are also served by an equestrian centre with trails, a tennis stadium, and cycling and jogging tracks. A town centre forms part of the masterplan, alongside an international school and a hospital. Within the villas, private pools, courtyards, gardens and barbecue areas provide dedicated outdoor amenities. Concierge and valet parking services are included alongside the covered private garages. The community’s facilities combine golf, equestrian, tennis, cycling and jogging provision within the Jumeirah Golf Estates extension.
Setting and nearby destinations
Ashwood Estates is located within the Jumeirah Golf Estates extension in Dubai, in the Golf Course North parcel of The Next Chapter. The development is recorded in Me’Aisem First. Dubai Metro Red Line station R73 is 1,516 metres from the subcommunity. Dubai Marina is 7.6 kilometres away, JBR Beach is 7.9 kilometres away, Palm Jumeirah is 10.9 kilometres away and Mall of the Emirates is 11.1 kilometres away. Al Maktoum International Airport is 13.9 kilometres away. Nibras International School is 2.4 kilometres away, while Bright Riders School Dubai is 2.5 kilometres away.
Construction progress and scheduled completion
Ashwood Estates started on 20 August 2025 and has an active project status. Construction completion stands at 5%, based on the inspection dated 1 June 2026. The scheduled completion date is 18 September 2028. The project contains 187 units across a total recorded area of 145,944.24 square metres. Its residential form is G+1+R villas, with detached homes supported by private garages, service accommodation and internal-lift provision. The community is being delivered as part of The Next Chapter at Jumeirah Golf Estates.
The developer
Jge Real Estate is the developer of Ashwood Estates. The company is delivering the 187-unit villa project in the Jumeirah Golf Estates extension. The project commenced on 20 August 2025, carries active status and has a scheduled completion date of 18 September 2028. Ashwood Estates is positioned within the Golf Course North parcel of The Next Chapter, where the masterplan includes golf, clubhouse, town-centre, education and healthcare infrastructure.