by Wasl properties in Al Furjan
South Garden C is a residential project by Wasl properties in Al Furjan, Dubai, with handover 31.12.2027, construction 8% complete per the DLD registry.
Construction progress
- Handover31.12.2027
- Status date24.02.2026
- DLD project number3141
Data from the Dubai Land Department project registry (updated 07.08.2026 09:55).
Places nearby
About the project
South Garden C is a residential and commercial building in Al Furjan, within Dubai’s Jebel Ali First area. Jag Development is developing the 258-unit project as one building configured with a basement, ground floor, two podium levels and 12 floors. It is active, with a recorded completion ratio of 7.97% at the inspection dated 24 February 2026.
The project and building configuration
South Garden C is planned as a single residential and commercial building with 258 units. Its stated configuration comprises a basement level, ground floor, two podium levels and 12 floors above. The building is designed with a concrete structure and blockwork, followed by internal and external finishes. This establishes a mid-rise format rather than a multi-building scheme, with all units contained within one development. The project is located in Al Furjan, a residential community in the Jebel Ali First sector of Dubai. South Garden C carries project number 3141 and has an active project status.
Construction status and programme
The project is active. Its recorded completion ratio is 7.97%, based on an inspection dated 24 February 2026. The project start date is 1 January 2025, and the recorded completion date is 31 December 2027. These dates place South Garden C within an ongoing development programme in Al Furjan. The development comprises one building and 258 units, with the residential and commercial uses incorporated in the same building. The recorded status, construction progress and completion date provide the current project position for buyers assessing its development stage.
Al Furjan setting
South Garden C sits in Al Furjan, a residential community in Dubai’s Jebel Ali First area. Al Furjan was originally planned as a collection of houses and apartments arranged around parks and walkways. Its original masterplan included terraced housing and villas, while later development added apartment towers and serviced residences. The first phase of the community contained 819 houses with gardens and terraces. Landscaping within the masterplan includes more than 30 parks and pedestrian connections. The district now combines low-rise terraced homes, detached villa clusters, apartments and serviced residences, giving it a varied residential built form.
Road and metro connections
Al Furjan runs alongside the D591 and has direct connections to E77, also known as Jebel Ali Road. These routes connect onward to Sheikh Zayed Road, Dubai’s principal arterial highway. The D591 also serves Discovery Gardens. The community is served by the Dubai Metro Red Line extension, Route 2020, which connects directly with the wider Red Line network and the Expo alignment. This transport network places the district within a road and metro-connected part of Jebel Ali First, alongside established residential areas and newer apartment developments.
Development activity in the district
Al Furjan includes 38 projects, with a further 68 projects in its immediate vicinity. The district’s earlier residential pattern centred on terraced villas and detached villa clusters, and subsequent schemes have expanded its apartment and serviced-apartment supply. Active and planned development in and around the area includes projects by Azizi Developments, Deyaar, Nabni Developments and Al Jaziri Developments. South Garden C forms part of this continuing development activity while retaining a distinct one-building format of 258 units. Its residential and commercial configuration adds another mixed-use building to the community’s growing range of apartment-led developments.
Developer
Jag Development is the developer of South Garden C. The project is being delivered in Al Furjan as a 258-unit residential and commercial building. Its development programme begins from the recorded project start date of 1 January 2025 and has a recorded completion date of 31 December 2027. The project’s one-building arrangement includes a basement, ground floor, two podium levels and 12 floors. Jag Development is presented as the developer name for South Garden C, while the project remains active with construction progress recorded at 7.97% at the latest stated inspection.

