Developer: Hamara Home Development · Al Furjan
Almaara Residences is a residential project by Hamara Home Development in Al Furjan, Dubai, with prices from AED 1 206 000, planned handover 16.10.2026, construction 65.5% complete per the DLD registry, 56 apartments (+3 non-residential units), 16 sold to first buyers per the DLD register (as of 23 Nov 2026).
· price from DLD deals · DLD data as of 23 Nov
| Type | Units | Typical size, sq.ft |
|---|---|---|
| 1 Bedroom | 21 | 758–918 |
| 2 Bedroom | 28 | 1 124–1 689 |
| 3 Bedroom | 7 | 1 740–2 801 |
| Other units | 3 | 1 102–1 211 |
Size range excludes the smallest and largest 5% of units of each type.
All units are freehold. Data from the DLD registry.
Balcony or terrace per the DLD registry: almost every residential unit (100%). Typical balcony size: 1 Bedroom — ~107 sq.ft (9.9 m²); 2 Bedroom — ~277 sq.ft (26 m²); 3 Bedroom — ~380 sq.ft (35 m²). Median of registered units; for villas and townhouses the registry includes terraces and open areas.
≈40 of 56 apartments available
Sold to first buyers 16 (29%)Available ≈40
| Type | Total | Sold | Available |
|---|---|---|---|
| 1 bedroom | 21 | 4 | 17 |
| 2 bedrooms | 28 | 11 | 17 |
| 3 bedrooms | 7 | 1 | 6 |
| Total | 56 | 16 | 40 |
Sales data comes from the official Dubai Land Department (DLD) register. Please confirm actual availability with our sales team — leave a request.
Tap an apartment type in the table to add it to your request.
“Available” means units without a registered sale; resales are excluded. Non-residential units (3) are not included.
The purchase price is split into these stages.
The exact schedule is confirmed in the sale agreement for the selected unit.
A broker will compare this project with 3 similar ones: prices, handover dates and payment plans.
All Dubai projects handing over in 2026 →
Data from the Dubai Land Department project registry (updated 26.11.2026 05:55).
Pace: 5.03% per month. At this rate 100% falls on 24.01.2027.
The pace is calculated from the past year of inspections. It is an estimate, not a developer commitment. For reference: across 1,175 completed projects the median pace is 2.48% per month and the median build takes 40 months.
84 more photos in the DLD register
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: Hamara Home Development · District: Al Furjan
Planned handover of Almaara Residences: 16.10.2026. Before you sign the handover form we check 110 points, send a photo report within 24 hours and file the defect list with the developer. Fixed price from 749 AED.
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 03.11.2026 | 2 BR | 125.3 | 1 925 000 |
| 16.06.2026 | 2 BR | 125.3 | 2 202 280 |
| 10.06.2026 | 2 BR | 121.2 | 2 129 693 |
| 08.06.2026 | 1 BR | 71.9 | 1 222 461 |
| 08.06.2026 | 1 BR | 71.8 | 1 221 608 |
| 03.06.2026 | 2 BR | 125.3 | 2 202 280 |
| 26.05.2026 | 2 BR | 121.2 | 2 133 388 |
| 22.05.2026 | 2 BR | 115.2 | 1 754 911 |
| 18.05.2026 | 2 BR | 104.4 | 1 701 039 |
| 23.04.2026 | 2 BR | 115.2 | 1 777 235 |
| 06.04.2026 | 3 BR | 302.4 | 3 238 943 |
| 26.03.2026 | 2 BR | 115.2 | 1 784 676 |
| 16.03.2026 | 2 BR | 115.2 | 1 748 710 |
| 11.02.2026 | 2 BR | 121.2 | 1 838 865 |
| 23.01.2026 | 1 BR | 71.8 | 1 206 145 |
| 22.01.2026 | 1 BR | 71.9 | 1 206 987 |
| 23.04.2024 | 2 184.8 | 12 300 000 | |
| 08.09.2015 | 2 184.8 | 7 340 000 |
Dubai Land Department transaction registry, updated 25.11.2026. Explore Dubai property transactions →
For UAE residents the down payment starts at 20% with terms up to 25 years. Indicative monthly payment for prices from 1 206 000 AED is 5 093 AED.
Estimates only; not a bank approval.


Tetiana Karpenko
Senior Broker · Continental Club Property · RERA ORN 31933
Answers questions about Almaara Residences: current availability, payment plan, DLD registration. English and Russian.
We will send floor plans, the payment plan and available units for this project.
Project data comes from the Dubai Land Department (DLD) registry.
Every figure carries its origin: “DLD registry” is taken from the Dubai Land Department register, “Developer supplied” is stated by the developer, “Our calculation” is computed by us from the first two. Developer prices change without notice — confirm before you commit. Methodology
Almaara Residences is an active residential project in Al Furjan by Hamara Home Development. The development comprises one building with 56 apartments (+3 non-residential units), configured as a ground level, two podium levels, seven residential floors and a roof. Construction was recorded at 65.52% complete on 30 June 2026, with completion dated 16 October 2026.
Almaara Residences is planned as a ground, two-podium, seven-storey and roof residential building, with commercial space at ground level. The project has one building and 56 apartments (+3 non-residential units). Its residential configuration includes two parking floors within the podium structure. The development is described as a seven-storey project with apartments arranged on residential levels. Its design information includes functional layouts, light-filled interiors and smart automation integration. The project also includes a reception and lobby area, providing an arrival and shared internal space within the building.
The apartment collection includes one-, two- and three-bedroom homes. Interiors are planned with semi-equipped kitchens and en-suite bathrooms. The project specification also includes smart automation integration, functional layouts and bright, light-filled interiors. Interior design is described through clean lines, neutral colours and premium finishes, with natural light incorporated into open-plan layouts. The homes are presented with separate living-room, kitchen, bedroom, bathroom and corridor areas in the interior layout materials. Almaara Residences contains 56 apartments (+3 non-residential units) in total across its single-building configuration.
Residents have access to a swimming pool with a separate kids’ pool. Together, the swimming pool and kids’ pool cover 85 square metres. The amenity programme also includes a fitness gym, a kids’ play area, a BBQ space and an open-air lounge. The fitness gym is designed as a dedicated workout space, while the children’s play area forms a separate recreation area. The BBQ space and open-air lounge provide outdoor communal areas within the development. A reception and lobby area is also included as part of the building’s shared facilities.
Almaara Residences is located in Al Furjan, within Dubai’s Jebel Ali First area. Al Furjan is a residential community arranged around homes, walkways and green areas, with a mix of low-rise housing, villas, apartment towers and serviced residences. The community runs alongside D591 and has connections to E77, also known as Jebel Ali Road. These routes provide access towards Sheikh Zayed Road. Al Furjan is served by the Dubai Metro Red Line extension, Route 2020. The district’s layout includes more than 30 parks and pedestrian connections within its original master plan.
JVT District 1 Park is 3.0 km from Almaara Residences, while JVT District 2 Park is 3.9 km away and JVT District 3 Park is 4.2 km away. Switch Bowling is 3.9 km away. Novo Cinema at Ibn Battuta Mall is 4.0 km away, and Jumeirah Golf Estates Golf Course is 5.2 km away. Montgomerie Golf Course is 6.0 km from the project. Reel Cinemas at Dubai Marina Mall is 6.3 km away, while Roxy Cinema at The Beach is 6.5 km away. Expo City Dubai and The Walk JBR are each 6.7 km away.
The payment plan is structured as 50% during the purchase and construction period and 50% on handover. A 10% down payment is due on booking, followed by 40% during construction in instalments. The remaining 50% is due on handover. The project started on 30 November 2024. It was recorded as active, with a completion ratio of 65.52% as of the inspection dated 30 June 2026. The stated completion date is 16 October 2026.
Hamara Home Development is the developer of Almaara Residences. The developer presents its residential communities around family living and community spirit, combining convenience and connection. Almaara Residences is its Al Furjan apartment development, with one-, two- and three-bedroom residences, shared leisure facilities, two podium parking levels and commercial space at ground level. The project’s residential design includes smart automation integration, semi-equipped kitchens, en-suite bathrooms and light-filled interiors. Its active construction status and 65.52% completion ratio were recorded for the project on 30 June 2026.
Resale prices in this area: Al Furjan Apartments: Resale Market Report H1 2026 — 318 DLD resale deals, median AED 1,304/sq ft.
Compare with other projects under construction: off-plan property in Dubai — completion data from the DLD register, prices and handover dates.
Dubai market as a whole: prices, transactions and trends (DLD data) →
The building is still under construction, so it has no RERA-approved budget yet — that comes after handover. The figures below are what already-completed buildings in the area pay.
Check the charge for a specific building →
Median across 70 completed buildings in Al Furjan for 2026, from the DLD service charge index (Mollak). This is an area benchmark, not this project’s rate: RERA approves that after handover and it may land either side of the median.
Based on 18 registered DLD sales in Almaara Residences between 8 Sep 2015 and 3 Nov 2026: median 15 893 AED/m² (1 477 AED/sq ft); half of the deals fell between 15 191 and 17 007 AED/m². This is transaction statistics, not a valuation of a specific unit: floor, view, finish and condition move the price.
| Type | Indicative price | Deals | Median AED/m² | Median area, m² |
|---|---|---|---|---|
| 1 BR | AED 1 215 000 | 4 | 16 899 | 71.9 |
| 2 BR | AED 1 877 000 | 11 | 15 489 | 121.2 |
Source: Dubai Land Department open data, the latest up to 50 sales in the building; areas as registered; refreshed daily. Deals outside 3,000–200,000 AED/m² are excluded.
PDF shortlist · updated 1 November 2026
Al Furjan: new projects and prices
30 projects · prices from DLD and developers
Azizi Jewel Al Furjan · Studio, 1 BR
from AED 513,000
Azizi Neila Al Furjan · Studio, 1 BR
from AED 550,000
Azizi Sikander Al Furjan · Studio, 1–2 BR
from AED 550,000
27 more in the PDF: prices, handover dates, payment plans
The PDF opens instantly. Refreshed monthly from DLD data.
Machine-readable mirrors of this page: Markdown · JSON. They carry the same figures as this page, each with its origin labelled.
How to cite:Almaara Residences — Continental Club Property, from Dubai Land Department registry and developer data, 2026-11-04, https://continentalclub.ae/project/almaara-residences-al-furjan/