Developer: Amaya Properties · Al Furjan

Amaya Residences

Amaya Residences is a residential project by Amaya Properties in Al Furjan, Dubai, with indicative prices from AED 1 251 000 (estimate from DLD sales; developer price not yet published), handover Q1 2027, construction 6.9% complete per the DLD registry, 78 units.

Price fromAED 1 251 000Our calculationEstimate: median of DLD sales, last 12 months, 1-bedroom units, Al Furjan. Developer price not yet published.
Unit types1–3 BR724–3 356 ft²DLD registry
HandoverQ1 2027Developer supplied
Construction6.9%DLD registry · checked 12.11.2026

· price from DLD deals

Layouts and sizes

TypeUnitsTypical size, sq.ft
1 Bedroom27724–755
2 Bedroom331 255–1 328
3 Bedroom171 557–3 356
Other units13 751

Size range excludes the smallest and largest 5% of units of each type.

All units are freehold. Data from the DLD registry.

Balcony or terrace per the DLD registry: almost every residential unit (100%). Typical size: 1 Bedroom — ~79 sq.ft (7.3 m²); 2 Bedroom — ~181 sq.ft (17 m²); 3 Bedroom — ~251 sq.ft (23 m²). Median of registered units; for villas and townhouses the registry includes terraces and open areas.

Payment plan 50/50 50% before handover · 50% on handover

The purchase price is split into these stages.

110%Down payment
240%During construction
350%On handover

The exact schedule is confirmed in the sale agreement for the selected unit.

Compare with similar projects

A broker will compare this project with 3 similar ones: prices, handover dates and payment plans.

Compare in WhatsApp

Handover date & construction progress

6.93%
  • StatusActive
  • Construction started01.03.2025
  • HandoverQ1 2027
  • Status date12.11.2026
  • Progress between DLD inspections+3.19% (15.05.2026 → 12.11.2026)
  • Escrow bankADIB
  • DLD project number3516

Data from the Dubai Land Department project registry (updated 25.11.2026 05:55).

Inspection history 3
025507510030.01.202512.11.2026
Actual, per inspections

Pace: 0.54% per month. At this rate we do not project a completion date: it falls more than 10 years out.

The pace is calculated from the past year of inspections. It is an estimate, not a developer commitment. For reference: across 1,175 completed projects the median pace is 2.48% per month and the median build takes 40 months.

Construction progress 49
15.05.2026 3.74%
Amaya Residences, Al Furjan construction progress — 15 May 2026, 3.74% complete, photo 1 of 35Amaya Residences, Al Furjan construction progress — 15 May 2026, 3.74% complete, photo 2 of 35Amaya Residences, Al Furjan construction progress — 15 May 2026, 3.74% complete, photo 3 of 35Amaya Residences, Al Furjan construction progress — 15 May 2026, 3.74% complete, photo 4 of 35Amaya Residences, Al Furjan construction progress — 15 May 2026, 3.74% complete, photo 5 of 35Amaya Residences, Al Furjan construction progress — 15 May 2026, 3.74% complete, photo 6 of 35Amaya Residences, Al Furjan construction progress — 15 May 2026, 3.74% complete, photo 7 of 35Amaya Residences, Al Furjan construction progress — 15 May 2026, 3.74% complete, photo 8 of 35Amaya Residences, Al Furjan construction progress — 15 May 2026, 3.74% complete, photo 9 of 35Amaya Residences, Al Furjan construction progress — 15 May 2026, 3.74% complete, photo 10 of 35Amaya Residences, Al Furjan construction progress — 15 May 2026, 3.74% complete, photo 11 of 35Amaya Residences, Al Furjan construction progress — 15 May 2026, 3.74% complete, photo 12 of 35Amaya Residences, Al Furjan construction progress — 15 May 2026, 3.74% complete, photo 13 of 35Amaya Residences, Al Furjan construction progress — 15 May 2026, 3.74% complete, photo 14 of 35Amaya Residences, Al Furjan construction progress — 15 May 2026, 3.74% complete, photo 15 of 35Amaya Residences, Al Furjan construction progress — 15 May 2026, 3.74% complete, photo 16 of 35Amaya Residences, Al Furjan construction progress — 15 May 2026, 3.74% complete, photo 17 of 35Amaya Residences, Al Furjan construction progress — 15 May 2026, 3.74% complete, photo 18 of 35Amaya Residences, Al Furjan construction progress — 15 May 2026, 3.74% complete, photo 19 of 35Amaya Residences, Al Furjan construction progress — 15 May 2026, 3.74% complete, photo 20 of 35Amaya Residences, Al Furjan construction progress — 15 May 2026, 3.74% complete, photo 21 of 35Amaya Residences, Al Furjan construction progress — 15 May 2026, 3.74% complete, photo 22 of 35Amaya Residences, Al Furjan construction progress — 15 May 2026, 3.74% complete, photo 23 of 35Amaya Residences, Al Furjan construction progress — 15 May 2026, 3.74% complete, photo 24 of 35Amaya Residences, Al Furjan construction progress — 15 May 2026, 3.74% complete, photo 25 of 35Amaya Residences, Al Furjan construction progress — 15 May 2026, 3.74% complete, photo 26 of 35Amaya Residences, Al Furjan construction progress — 15 May 2026, 3.74% complete, photo 27 of 35Amaya Residences, Al Furjan construction progress — 15 May 2026, 3.74% complete, photo 28 of 35Amaya Residences, Al Furjan construction progress — 15 May 2026, 3.74% complete, photo 29 of 35Amaya Residences, Al Furjan construction progress — 15 May 2026, 3.74% complete, photo 30 of 35Amaya Residences, Al Furjan construction progress — 15 May 2026, 3.74% complete, photo 31 of 35Amaya Residences, Al Furjan construction progress — 15 May 2026, 3.74% complete, photo 32 of 35Amaya Residences, Al Furjan construction progress — 15 May 2026, 3.74% complete, photo 33 of 35Amaya Residences, Al Furjan construction progress — 15 May 2026, 3.74% complete, photo 34 of 35Amaya Residences, Al Furjan construction progress — 15 May 2026, 3.74% complete, photo 35 of 35
30.01.2025 0.00%
Amaya Residences, Al Furjan construction progress — 30 January 2025, 0.00% complete

13 more photos in the DLD register

Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.

Handover is close: snagging inspection

Planned handover of Amaya Residences: Q1 2027. Before you sign the handover form we check 110 points, send a photo report within 24 hours and file the defect list with the developer. Fixed price from 749 AED.

Snagging inspection: prices and scope

Mortgage for this project

For UAE residents the down payment starts at 20% with terms up to 25 years. Indicative monthly payment for prices from 1 251 000 AED is 5 283 AED.

Calculate mortgage

Estimates only; not a bank approval.

Amenities

  • Concierge desk
  • Cafe and juice bar
  • Seating and waiting area
  • Fitness centre
  • Convenience shop
  • Retail spaces
  • High-speed elevators
  • Swimming pool
  • Sunken pool seating
  • Padel court
  • Cafe lounge
  • Outdoor seating area
  • Outdoor entertainment area
  • Barbecue seating area
  • Car parking
  • Pool deck
  • Kids pool
  • Kids play area
  • Outdoor cinema
  • Jogging track
  • Female showers and lockers
  • Male showers and lockers
  • Outdoor training area
  • Private terrace
  • Branded kitchen appliances

Places nearby

Amaya Residences

Your broker for this project

Olesia Kotova

Olesia Kotova

Broker · Continental Club Property · RERA ORN 31933

Answers questions about Amaya Residences: current availability, payment plan, DLD registration. English and Russian.

Get the presentation and prices

We will send floor plans, the payment plan and available units for this project.

By submitting the form you agree to the processing of your contact details, including for advertising analytics.

Project data comes from the Dubai Land Department (DLD) registry.

Every figure carries its origin: “DLD registry” is taken from the Dubai Land Department register, “Developer supplied” is stated by the developer, “Our calculation” is computed by us from the first two. Developer prices change without notice — confirm before you commit. Methodology

About the project

Amaya Residences is a residential tower in Al Furjan by Amaya Properties, comprising apartments and penthouses alongside ground-floor retail and leisure facilities. The project is active, with a recorded completion ratio of 3.74% and completion scheduled for Q1 2027. It is registered as a single-building development with 78 units.

The project

Amaya Residences is planned as a residential building in Al Furjan, within Jebel Ali First. The building configuration includes a basement, ground floor, two podium levels, 12 typical floors and a roof level. Its residential programme includes one-, two- and three-bedroom apartments as well as penthouses. The project incorporates retail at ground level, while the first floor includes a swimming pool and entertainment area. A 17-storey tower format, high-speed elevators and a double-height, fully air-conditioned lobby form part of the development’s stated design. The registered project comprises one building and 78 units.

Residences and interiors

The available home types at Amaya Residences are one-bedroom apartments, two-bedroom apartments, three-bedroom apartments and penthouses. Interiors are described with living areas, entertainment areas, master bedrooms and master bathrooms. Kitchens are specified with branded appliances. Large windows and spacious balconies are identified as features of the apartments, bringing natural light into the interiors. The project also refers to private terraces. The residence mix is contained within the single tower, which has ground-level retail spaces and a dedicated fitness centre as part of its overall configuration.

Amenity floors and shared spaces

Amenities are arranged across two floors. At the entrance level, facilities include a concierge desk, café and juice bar, seating and waiting area, convenience shop, retail spaces and a fitness centre. The lobby is designed as a double-height atrium with air conditioning. The activity floor includes a swimming pool with sunken seating, pool deck, kids’ pool and kids’ play area. It also includes a padel court, jogging track, outdoor training area, outdoor cinema, café lounge, outdoor seating and an outdoor entertainment area. Barbecue seating is included, together with separate female and male shower and locker facilities.

Parking and building access

Amaya Residences provides B+G+2 podium-level parking, with car parking incorporated into the development. The ground-floor plan includes a main entry and exit, car entry and exit, a parking area and a pedestrian walkway. High-speed elevators connect the building’s levels. At ground level, retail and the fitness centre sit alongside the entrance and lobby spaces. The lobby includes a concierge desk, café and juice bar, convenience shop and seating area. The development also includes an outdoor seating area at the ground-floor level, while the pool, recreation and activity amenities occupy the designated amenity areas.

Al Furjan setting

Amaya Residences is located in Al Furjan, a residential community in Dubai’s Jebel Ali First area. The district is connected by the D591 and E77, also known as Jebel Ali Road. Al Furjan is served by the Dubai Metro Red Line extension, Route 2020. The community’s development pattern includes homes connected by walkways and green areas, alongside apartment buildings and serviced residences. Al Furjan was originally planned with houses and apartments arranged around parks and walkways. The project’s location places it within this established residential district rather than in a standalone development zone.

Nearby destinations

The Arbor School is stated at 3 minutes from Amaya Residences. Festival Plaza Dubai and Sheikh Zayed Road are each listed at 11 minutes, while NMC Specialty Hospital is listed at 13 minutes and Expo City Dubai at 14 minutes. Dubai Marina and the Route 2020 Metro Station are each listed at 15 minutes. Jumeirah Lake Towers is listed at 18 minutes, Al Maktoum International Airport at 26 minutes and Dubai International Airport at 41 minutes. Other nearby destinations include Switch Bowling at 2.4 km, Novo Cinema at Ibn Battuta Mall at 2.6 km and JVT District 1 Park at 3.5 km.

Payment plan and completion

The payment structure is set at 50/50. It requires a 10% down payment on booking, followed by 40% during construction and 50% on handover. Completion is scheduled for Q1 2027, with a recorded completion date of 1 March 2027. Construction began on 1 March 2025. The project’s current status is active, and its recorded completion ratio is 3.74%. The latest recorded inspection date is 15 May 2026. The development is registered under project number 3516.

Amaya Properties

Amaya Properties is the developer of Amaya Residences. The company was founded in 2010. Amaya Residences is one of its residential developments in Al Furjan, with a programme that combines apartments and penthouses, retail space, a fitness centre and shared leisure facilities. The project is registered as a single residential building with 78 units and a scheduled completion date of 1 March 2027. The development’s building format includes basement parking, a ground floor, two podium levels, 12 typical floors and a roof level.

Service charge: what to expect

The building is still under construction, so it has no RERA-approved budget yet — that comes after handover. The figures below are what already-completed buildings in the area pay.

Area median15.13 AEDper sq ft per year · 163 AED/m²
Range in the area2.31 – 20.99AED per sq ft · 70 buildings
A 1,000 sq ft unit≈ 15,130 AEDper year at the median · ≈ $4,120
vs Dubai median▼ -5.6%Dubai 16.02 AED/sq ft

Check the charge for a specific building →

Median across 70 completed buildings in Al Furjan for 2026, from the DLD service charge index (Mollak). This is an area benchmark, not this project’s rate: RERA approves that after handover and it may land either side of the median.

Frequent questions

Who is the developer of Amaya Residences?
Amaya Residences is developed by Amaya Properties, a company founded in 2010.
Where is Amaya Residences located?
Amaya Residences is located in Al Furjan, within Dubai’s Jebel Ali First area.
What types of homes are available at Amaya Residences?
The project includes one-, two- and three-bedroom apartments and penthouses.
How many units are there at Amaya Residences?
The registered project contains 78 units in one building.
What is the payment plan for Amaya Residences?
The payment plan is 50/50: 10% on booking, 40% during construction and 50% on handover.
When is the Amaya Residences handover date?
Amaya Residences handover (completion) is scheduled for Q1 2027 (developer data). The DLD register lists 1 March 2027. Construction progress was 6.93% at the DLD inspection of 12 November 2026. The date and progress on this page are updated from the DLD register. For current availability, prices and resale (assignment) options, send an enquiry on this page.
What is the construction status of Amaya Residences?
The project is active and has a recorded completion ratio of 3.74%.
What amenities does Amaya Residences include?
Facilities include a swimming pool, kids’ pool, padel court, fitness centre, jogging track, outdoor cinema, café lounge, barbecue seating and retail spaces.
What is nearby Amaya Residences?
The Arbor School is listed at 3 minutes, Expo City Dubai at 14 minutes, Dubai Marina at 15 minutes and Al Maktoum International Airport at 26 minutes.
How can I buy an apartment in Amaya Residences?
Submit an enquiry via the form on this page or message us on WhatsApp — a Continental Club Property broker (RERA 31933) will help you choose a unit and send the brochure and payment plan.

PDF shortlist · updated 1 November 2026

Al Furjan: new projects and prices

30 projects · prices from DLD and developers

  1. Azizi Jewel Azizi Jewel Al Furjan · Studio, 1 BR from AED 513,000
  2. Azizi Neila Azizi Neila Al Furjan · Studio, 1 BR from AED 550,000
  3. Azizi Sikander Azizi Sikander Al Furjan · Studio, 1–2 BR from AED 550,000

27 more in the PDF: prices, handover dates, payment plans

The PDF opens instantly. Refreshed monthly from DLD data.

More projects by Amaya Properties

All 2 projects by Amaya Properties →

Nearby projects

For AI agents and researchers

Machine-readable mirrors of this page: Markdown · JSON. They carry the same figures as this page, each with its origin labelled.

How to cite:Amaya Residences — Continental Club Property, from Dubai Land Department registry and developer data, 2026-08-02, https://continentalclub.ae/project/amaya-residences-al-furjan/

Where should we send the shortlist?

The PDF downloads right after you submit. A manager gets in touch only if you ask.