Developer: Dubai Investment Real Estate (L L C · Meydan Horizon
Al Vista is a residential project by Dubai Investments in Meydan Horizon, Dubai, with handover Q4 2027, construction 5.5% complete per the DLD registry, 384 units.
Every figure carries its origin: “DLD registry” is taken from the Dubai Land Department register, “Developer supplied” is stated by the developer, “Our calculation” is computed by us from the first two. Developer prices change without notice — confirm before you commit. Methodology
All Dubai projects handing over in 2027 →
Data from the Dubai Land Department project registry (updated 22.09.2026 09:55).
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: Dubai Investments · District: Meydan Horizon
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 15.09.2026 | 109.3 | 3 476 581 | |
| 27.07.2026 | 172.3 | 5 481 089 | |
| 21.07.2026 | 2 BR | 123.5 | 3 257 936 |
| 12.06.2026 | 111.2 | 3 327 009 | |
| 12.06.2026 | 172.8 | 5 172 150 | |
| 12.06.2026 | 111.2 | 3 536 361 | |
| 11.06.2026 | 109.3 | 3 198 466 | |
| 11.06.2026 | 111.2 | 3 327 009 | |
| 11.06.2026 | 1 BR | 73.3 | 1 735 316 |
| 11.06.2026 | 1 BR | 67.1 | 1 624 590 |
| 11.06.2026 | 667.6 | 16 563 174 | |
| 11.06.2026 | 172.3 | 5 481 089 | |
| 11.06.2026 | 172.3 | 5 481 089 | |
| 11.06.2026 | 109.3 | 3 476 581 | |
| 11.06.2026 | 172.3 | 5 042 605 | |
| 11.06.2026 | 667.6 | 16 563 174 |
Dubai Land Department transaction registry, updated 2026-09-20. Explore Dubai property transactions →
Al Vista is a two-tower development by Dubai Investments in Meydan Horizon, within the Meydan and Bu Kadra sector of Mohammed Bin Rashid City. The scheme combines a residential Tower A with an office Tower B over a shared ground level and four podiums. It is active, with a reported construction completion ratio of 5.50% and a scheduled completion date of 20 October 2027.
Al Vista is planned as two buildings arranged above a common ground floor and four podium levels. Tower A is the residential component, configured as ground floor, 39 floors, a mechanical level and a roof. Tower B is designated for offices and is configured as ground floor, 18 floors and a roof. The development covers a total area of 48,460.34. This mixed-use arrangement places residential and office uses within the same project while retaining separate towers for each use. The project is located in the Bukadra area and is associated with Meydan Horizon, a named community in the broader Mohammed Bin Rashid City framework.
Al Vista has active project status. Construction began on 20 October 2025, and the recorded completion ratio is 5.50%, based on the inspection dated 1 July 2026. The scheduled project completion date is 20 October 2027. Buyers considering the project can therefore assess it as an early-stage development rather than a completed building. The current project configuration comprises the shared podium structure, a 39-floor residential tower with a mechanical level, and an 18-floor office tower. Completion remains scheduled for October 2027.
Al Vista is in Meydan Horizon, a community within Mohammed Bin Rashid City associated with the Meydan and Bu Kadra locality. Meydan Horizon is presented as a planned residential neighbourhood containing several individual developments, rather than a single uniform project. Al Vista’s registered area is Bukadra, placing it within this wider Meydan Horizon setting. The community’s position within Mohammed Bin Rashid City gives the project a location in an established Dubai development zone that includes residential schemes and education providers. North London Collegiate School Dubai is cited at 1.8 km from Meydan Horizon, while Hartland International School is cited at 2.1 km.
Several outdoor and leisure destinations are identified close to Al Vista. Hartland Greens East Park is 1.0 km away, Riviera East Park is 1.2 km away, and Sobha Hartland Estates Park is 1.3 km away. Ras Al Khor Wildlife Sanctuary is 1.2 km from the project. For golf, The Track Meydan Golf is 2.1 km away; Al Badia Golf Club is 5.8 km away, and Dubai Creek Golf & Yacht Club is 7.4 km away. Cinema options listed nearby include the Paramount Screening Room at Damac Towers by Paramount at 3.1 km, Cinema City at Address Dubai Mall at 4.3 km, and Reel Cinemas at Rove Downtown at 5.0 km.
The residential element of Al Vista is concentrated in Tower A, which rises from the common ground and podium structure through 39 floors, followed by a mechanical level and roof. Tower B is allocated to offices and rises through 18 floors above the ground level, with a roof level. The shared ground floor and four podiums form the base of both towers. This distinction between a residential tower and an office tower is part of the registered project description. The development is recorded as having two buildings, with its residential and office components identified separately in the project structure.
Dubai Investments is the developer of Al Vista. The company is associated with the project’s residential and office tower plan in Meydan Horizon. Al Vista is a current development within Dubai Investments’ portfolio, with construction having commenced in October 2025 and completion scheduled for October 2027. The developer name attached to the project is Dubai Investment Real Estate (L L C), while Dubai Investments is the name used for the developer.
Dubai market as a whole: prices, transactions and trends (DLD data) →
We will send floor plans, the payment plan and available units for this project.
Project data comes from the Dubai Land Department (DLD) registry.
Machine-readable mirrors of this page: Markdown · JSON. They carry the same figures as this page, each with its origin labelled.
How to cite:Al Vista — Continental Club Property, from Dubai Land Department registry and developer data, 2026-09-17, https://continentalclub.ae/project/al-vista-meydan-horizon/