by E L P D Developers in Meydan Horizon
Claydon House By Ellington is a residential project by E L P D Developers in Meydan Horizon, Dubai, with handover 31.12.2027, construction 9.7% complete per the DLD registry.
Construction progress
- Handover31.12.2027
- Status date13.04.2026
- DLD project number3098
Data from the Dubai Land Department project registry (updated 08.08.2026 10:48).
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: E L P D Developers · District: Meydan Horizon
Recent transactions
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 17.07.2026 | 1 BR | 73.2 | 1 530 828 |
| 16.07.2026 | 2 BR | 120.3 | 2 782 828 |
| 16.07.2026 | 1 BR | 71.3 | 1 482 828 |
| 16.07.2026 | 1 BR | 71.6 | 1 675 828 |
| 14.07.2026 | 2 BR | 120.3 | 2 797 828 |
| 09.07.2026 | 1 BR | 71.7 | 1 550 000 |
| 07.07.2026 | 129.5 | 17 714 187 | |
| 02.06.2026 | 1 BR | 77.9 | 1 769 828 |
| 04.05.2026 | 1 BR | 78.1 | 1 759 828 |
| 14.04.2026 | 1 BR | 76.6 | 1 617 828 |
| 08.04.2026 | 1 BR | 71.3 | 1 418 828 |
| 04.03.2026 | 1 BR | 75.2 | 1 660 025 |
| 23.02.2026 | 2 BR | 115.3 | 2 540 828 |
| 29.12.2025 | 1 BR | 76.6 | 1 558 828 |
| 24.12.2025 | 2 BR | 114.4 | 2 450 828 |
| 24.12.2025 | 1 BR | 75.4 | 1 651 828 |
| 24.12.2025 | 2 BR | 116.8 | 2 279 828 |
| 24.12.2025 | 2 BR | 129.5 | 2 600 828 |
| 15.12.2025 | 1 BR | 71.7 | 1 544 828 |
| 01.12.2025 | 3 BR | 150.0 | 3 050 000 |
Dubai Land Department transaction registry, updated 2026-08-07. Explore Dubai property transactions →
About the project
Claydon House By Ellington is an active residential project by E L P D Developers in Meydan Horizon, within Mohammed Bin Rashid City’s Meydan and Bu Kadra sector. The development comprises one building with 415 units. Construction began on 15 May 2024, and recorded completion stood at 9.70% on the 13 April 2026 inspection.
The project
Claydon House By Ellington is planned as a single residential building in Meydan Horizon. Its registered configuration comprises a ground floor, five podium levels and 38 further floors. The project has 415 units in total and a recorded project area of 42,098.63. The development is located in Bukadra, within the wider Mohammed Bin Rashid City framework. Meydan Horizon is a named residential community associated with the Meydan and Bu Kadra locality, where several individual residential projects form part of the wider area.
Building scale and development status
The project is active, with one building and 415 units registered for the development. The construction start date is 15 May 2024. On the inspection dated 13 April 2026, the project completion ratio was 9.70%. The scheduled completion date is 31 December 2027. Claydon House By Ellington has a vertical layout of a ground floor, five podium floors and 38 floors above them, creating a building with 44 levels when the ground and podium levels are included.
Meydan Horizon setting
Claydon House By Ellington is situated in Meydan Horizon, a community within Mohammed Bin Rashid City. The location is associated with the Meydan and Bu Kadra sector of Dubai and is treated as a collection of individual residential developments. Meydan Horizon is positioned for road access to central Dubai destinations. Driving times associated with the area are 14 minutes to Dubai Mall, 26 minutes to Palm Jumeirah, 24 minutes to Burj Al Arab and 29 minutes to The Walk at JBR. Dubai International Airport is 23 minutes away by car, while Al Maktoum International Airport is 44 minutes away by car.
Schools and transport access
Two established schools are located close to Meydan Horizon. North London Collegiate School Dubai is 1.8 km from the community, and Hartland International School is 2.1 km away. Road travel is the direct transport connection for the area. The nearest recorded metro reference is a Green Line station with code G30, located 4,491 metres from Meydan Horizon. This station is not within routine walking distance of the community, so reaching the metro requires a drive, taxi or feeder-bus connection.
Completion schedule
Claydon House By Ellington began construction on 15 May 2024 and has a scheduled completion date of 31 December 2027. Its status is active. The recorded construction progress was 9.70% at the inspection conducted on 13 April 2026. The project’s 415-unit count and single-building format provide the registered scale of the development, while the ground-floor, five-podium and 38-floor configuration defines its planned structure. Buyers considering the project can use the scheduled completion date alongside the recorded construction stage when reviewing its delivery timeline.