Gallery

On map

The Pier Residence

The Pier Residence is a residential project by LMD Continental Investments in Maritime City, Dubai, with prices from AED 1 400 000, handover Q2 2027, construction 34.8% complete per the DLD registry, 278 units.

Price fromAED 1 400 000
HandoverQ2 2027
Construction34.8%
Units278

Layouts and sizes

TypeSize, sq.ft
1 Bedroom Type A1701
1 Bedroom Type A2683
1 Bedroom Type A3753
1 Bedroom Type A4724
1 Bedroom Type A5718
1 Bedroom Type A6691
1 Bedroom Type A7728
1 Bedroom Type A8702
1 Bedroom Type A9696
1 Bedroom Type B1618
1 Bedroom Type B2619
1 Bedroom Type C1710
1 Bedroom Type C2696
1 Bedroom Type D1766
1 Bedroom Type D2741
2 Bedroom Type A11 162
2 Bedroom Type A21 174
2 Bedroom Type B11 178
2 Bedroom Type B21 146
2 Bedroom Type B31 199
2 Bedroom Type B41 162
2 Bedroom Type B51 182
2 Bedroom Type B61 122
2 Bedroom Type B71 116
2 Bedroom Type B81 022
2 Bedroom Type B91 142
2 Bedroom Type B101 166
2 Bedroom Type B111 106
2 Bedroom Type B121 021
3 Bedroom Type A11 958
3 Bedroom Type A21 964
3 Bedroom Type A31 965
3 Bedroom Type A42 007

Payment plan 60/40, 2Yrs (P.H.O)

20%40%5%35%
  • Down payment20%
  • During construction40%
  • On handover5%
  • Post-handover35%

Construction progress

34.81%
  • StatusActive
  • Construction started2024-07-01
  • HandoverQ2 2027
  • Status date14.07.2026
  • Escrow bankNational Bank of Fujairah
  • DLD project number3110

Data from the Dubai Land Department project registry (updated 10.08.2026 09:55).

Construction progress 34
14 July 2026 34.81%
The Pier Residence, Maritime City construction progress — 14 July 2026, 34.81% complete, photo 1 of 10The Pier Residence, Maritime City construction progress — 14 July 2026, 34.81% complete, photo 2 of 10The Pier Residence, Maritime City construction progress — 14 July 2026, 34.81% complete, photo 3 of 10The Pier Residence, Maritime City construction progress — 14 July 2026, 34.81% complete, photo 4 of 10The Pier Residence, Maritime City construction progress — 14 July 2026, 34.81% complete, photo 5 of 10The Pier Residence, Maritime City construction progress — 14 July 2026, 34.81% complete, photo 6 of 10The Pier Residence, Maritime City construction progress — 14 July 2026, 34.81% complete, photo 7 of 10The Pier Residence, Maritime City construction progress — 14 July 2026, 34.81% complete, photo 8 of 10The Pier Residence, Maritime City construction progress — 14 July 2026, 34.81% complete, photo 9 of 10The Pier Residence, Maritime City construction progress — 14 July 2026, 34.81% complete, photo 10 of 10

Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.

Recent transactions

DateTypeSize, m²Price, AED
31.07.20261 BR64.61 438 684
16.06.20262 BR106.43 589 527
20.05.20262 BR106.53 583 514
20.04.20262 BR102.02 730 334
18.02.20261 BR64.71 686 473
11.02.20261 BR66.32 035 000
10.02.20262 BR108.83 082 290
10.02.20262 BR106.92 506 230
26.01.20263 BR180.57 000 000
26.01.20261 BR180.32 231 508
09.01.20262 BR108.42 163 075
26.12.20252 BR107.52 627 713
15.12.20251 BR62.71 853 597
11.12.20252 BR109.23 222 681
11.12.20252 BR103.43 195 074
11.12.20252 BR108.23 026 914
11.12.20252 BR107.62 904 436
11.12.20252 BR106.92 896 525
11.12.20252 BR102.82 977 164
11.12.20252 BR102.82 844 981

Dubai Land Department transaction registry, updated 2026-08-10. Explore Dubai property transactions →

Amenities

  • Landscaped Gardens
  • Gymnasium
  • Restaurants
  • Indoor Swimming Pool
  • CCTV Security
  • Barbecue Area
  • Children's Play Area

What is nearby

  • Downtown Dubai12 мин
  • Dubai International Airport20 мин
  • Dubai Marina15 мин
  • EXPO 202025 мин

Places nearby

About the project

The Pier Residence is a one-building residential project by LMD Continental Investments in Dubai Maritime City. It comprises one-, two- and three-bedroom apartments, with commercial space at ground level and residential floors from the first through the 23rd floor. The project is active and recorded 34.81% construction completion on 20 July 2026, with handover scheduled for Q2 2027.

The building and architectural concept

The Pier Residence is planned as a maritime-inspired residential building with a wave-like façade designed by Arkiplan. The building configuration includes a ground-floor commercial podium, four garage floors, a services level, and residential accommodation from the first to the 23rd floor. The development includes pool and gym facilities within its services and amenity areas. The apartments use nautical-inspired design elements, contemporary finishes and floor-to-ceiling windows with full-height thermal glazing. Private balconies form part of the available layouts, while Burj Khalifa views are available. The project is located in Maritime City, a peninsula between Port Rashid and Dubai Dry Docks with residential, commercial and maritime uses.

Apartment types and floor areas

The Pier Residence offers one-, two- and three-bedroom apartment layouts. One-bedroom homes range from 618 to 765.85 square feet, covering 15 layout types. Two-bedroom homes range from 1,020.85 to 1,198.6 square feet across 13 layout types. The three-bedroom range spans 1,957.9 to 2,007.27 square feet and comprises four layout types. Balconies are included in the available apartment plans. The three-bedroom layouts include maid’s rooms and private pools. This mix provides a defined selection of unit sizes, from compact one-bedroom residences to three-bedroom homes with additional household space and private water features.

Interiors and home technology

Apartments are specified with a smart-home system for control of lighting, air conditioning, the video doorbell and curtains through a smartphone. Kitchens include marble or quartz countertops and integrated appliances from Bosch or Siemens, including a refrigerator, coffee machine and washing machine. Bathroom specifications include Villeroy & Boch sanitary ware, Italian-inspired marble and porcelain tiles. Bedroom and living areas use Scandinavian oak-style flooring. Floor-to-ceiling windows are designed to bring natural light into the apartments, while balconies extend the living areas outdoors. The stated interior specification combines integrated kitchen equipment, home controls and detailed bathroom and flooring selections across the residences.

Pool, fitness and resident facilities

The amenity programme includes an infinity pool, a rooftop deck and pool, a fully equipped gym, yoga studio and paddle court. Residents’ lounge areas, an indoor kids’ pool and an indoor children’s play area are also included. Additional listed facilities include BBQ areas, swimming pools, fitness facilities, indoor games, kids’ play areas, jogging and cycling trails, yoga and meditation spaces, parks and leisure areas, retail outlets, restaurants, a marina and yacht club, and direct access to the Green Loop. The development also lists parking, housekeeping and a kids’ nursery among its available features. Pool and gym facilities are incorporated into the building’s services and amenity levels.

Maritime City setting and nearby places

The Pier Residence sits in Dubai Maritime City, a purpose-built peninsula between Port Rashid and Dubai Dry Docks. Maritime City Park is 0.3 km from the project. Queen Elizabeth 2 is 1.2 km away, while Dubai Heritage Village is 1.9 km away and Dubai Museum is 2.7 km away. Port De La Mer Beach is 3.7 km from the development. Vox Cinema at City Centre Shindagh is 1.7 km away, and Vox Cinemas at BurJuman Mall is 3.6 km away. Dubai Creek Golf & Yacht Club is 7.0 km from the project. The location is positioned close to Dubai’s port-side districts and combines residential development with maritime, commercial and industrial activity.

Price, payment plan and handover

Prices for The Pier Residence start from AED 1.4 million. The payment structure requires a 20% down payment on booking, followed by 40% during construction across the first to fifth instalments. A further 5% is due on handover when the project reaches 100% completion, and the remaining 35% is payable within 24 months after handover. The payment plan is presented as a two-year post-handover arrangement. Handover is scheduled for Q2 2027. The project began on 1 July 2024 and has a recorded completion date of 31 December 2026. It was active with a construction completion ratio of 34.81% at the latest recorded update on 20 July 2026.

Registered transactions in The Pier Residence

Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.

266deals since 2019
26 433AED per m², median
1%resale, the rest bought from the developer
+9%over the past year

The yearly figure compares the last 12 months with the 12 before them: calendar years would not work, the current one is unfinished. The district moved 0% over the same period, so the building grew faster.

What buyers actually paid

TypeSize, m²Price, AEDPer m²Deals
1 bedroom651 659 16725 526166
2 bedrooms1082 914 04326 98290

Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.

How the price per square metre moved

From 2024 to 2026 — +2% on the price per square metre in this building. The district moved +29% over the same period, so the building lagged the market.

26 3002024
26 5082025
26 7712026*

Top to bottom: purchase price per m², year, annual rent per m², gross yield.

All figures are medians. Years with fewer than eight deals are skipped; rent is shown where there are at least twenty contracts. The yield is gross — service charges are not published in the register.

* 2026 is still in progress and its bar covers part of the year. The growth figure above uses completed years.

Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.

FAQ

Who is the developer of The Pier Residence?
The Pier Residence is developed by LMD Continental Investments.
Where is The Pier Residence located?
The Pier Residence is located in Dubai Maritime City, between Port Rashid and Dubai Dry Docks.
What is the starting price at The Pier Residence?
Prices start from AED 1.4 million.
What apartment types are available at The Pier Residence?
The project offers one-, two- and three-bedroom apartments. Three-bedroom layouts include maid’s rooms and private pools.
What are the apartment sizes at The Pier Residence?
One-bedroom apartments range from 618 to 765.85 square feet, two-bedroom apartments from 1,020.85 to 1,198.6 square feet, and three-bedroom apartments from 1,957.9 to 2,007.27 square feet.
When is handover for The Pier Residence?
Handover is scheduled for Q2 2027.
What is the payment plan for The Pier Residence?
The plan is 20% on booking, 40% during construction, 5% on handover and 35% within 24 months after handover.
What is the construction status of The Pier Residence?
The project is active, with 34.81% construction completion recorded on 20 July 2026.
What amenities does The Pier Residence have?
Facilities include an infinity pool, rooftop deck and pool, gym, yoga studio, paddle court, residents’ lounges, and indoor children’s facilities.
What is near The Pier Residence?
Maritime City Park is 0.3 km away, Queen Elizabeth 2 is 1.2 km away, and Port De La Mer Beach is 3.7 km away.
How can I buy an apartment in The Pier Residence?
Submit an enquiry via the form on this page or message us on WhatsApp — a Continental Club Property broker (RERA 31933) will help you choose a unit and send the brochure and payment plan.

Nearby projects

Request
Request