Developer: Ellington Properties · Business Bay

One River Point

One River Point is a residential project by Ellington Properties in Business Bay, Dubai, with prices from AED 1 482 828, handover Q2 2027, construction 35.4% complete per the DLD registry, 295 apartments (+3 non-residential units), 271 sold to first buyers per the DLD register (as of 13 Nov 2026).

Price fromAED 1 482 828Developer suppliedDeveloper figure, possibly a launch price. DLD sales over 12 months (to 30.10.2026) mostly start from about AED 2 564 000.
Unit typesStudio · 1–4 BR · Penthouses487–5 847 ft²Developer supplied
HandoverQ2 2027Developer supplied
Construction35.4%DLD registry · checked 21.07.2026

Layouts and sizes

TypeSize, sq.ft
Studio487
1 Bedroom958–1 199
2 Bedroom1 447–1 795
2 Bedroom + S
3 Bedroom2 397–3 968
4 Bedroom Duplex4 971–5 576
3 Bedroom Penthouse3 502–3 734
4 Bedroom Penthouse5 847

Balcony or terrace per the DLD registry: almost every residential unit (100%). Typical size: Studio — ~86 sq.ft (8.0 m²); 1 Bedroom — ~93 sq.ft (8.6 m²); 2 Bedroom — ~153 sq.ft (14 m²); 3 Bedroom — ~122 sq.ft (11 m²). Median of registered units; for villas and townhouses the registry includes terraces and open areas.

Unit availability · DLD data as of 13 Nov 2026

≈24 of 295 apartments available

Sold to first buyers 271 (92%)Available ≈24

TypeTotalSoldAvailable
Studios19163
1 bedroom94877
2 bedrooms14613511
3 bedrooms33312
4+ bedrooms321
Total29527124

Sales data comes from the official Dubai Land Department (DLD) register. Please confirm actual availability with our sales team — leave a request.

Tap an apartment type in the table to add it to your request.

By submitting the form you agree to the processing of your contact details, including for advertising analytics.

“Available” means units without a registered sale; resales are excluded. Non-residential units (3) are not included.

Sales pace · DLD data as of 10 Nov 2026

Source: Dubai Land Department registrations (include off-plan resales). Ask us for current availability.

Payment plan 70/30 70% before handover · 30% on handover

The purchase price is split into these stages.

120%Down payment
250%During construction
330%On handover

The exact schedule is confirmed in the sale agreement for the selected unit.

Compare with similar projects

Price, handover, payment plan and DLD deals side by side with the 3 closest projects — one table, no sign-up.

Compare with 3 closest Ask a broker on WhatsApp

Handover date & construction progress

35.43%
  • StatusActive
  • Construction started24.10.2023
  • HandoverQ2 2027
  • Status date21.07.2026
  • Progress between DLD inspections+6.64% (27.03.2026 → 21.07.2026)
  • Escrow bankEmirates NBD
  • DLD project number2929

Data from the Dubai Land Department project registry (updated 16.11.2026 05:55).

DLD advertising permit

DLD advertising permit

Listed by Continental Club Property under a Dubai Land Department (Trakheesi) permit. Scan the QR to verify.

Inspection history 4
025507510012.01.202421.07.2026
Actual, per inspections

Pace: 1.74% per month. At this rate 100% falls on 22.08.2029.

The pace is calculated from the past year of inspections. It is an estimate, not a developer commitment. For reference: across 1,175 completed projects the median pace is 2.48% per month and the median build takes 40 months.

Construction progress 120
21.07.2026 35.43%
One River Point, Business Bay construction progress — 21 July 2026, 35.43% complete, photo 1 of 30One River Point, Business Bay construction progress — 21 July 2026, 35.43% complete, photo 2 of 30One River Point, Business Bay construction progress — 21 July 2026, 35.43% complete, photo 3 of 30One River Point, Business Bay construction progress — 21 July 2026, 35.43% complete, photo 4 of 30One River Point, Business Bay construction progress — 21 July 2026, 35.43% complete, photo 5 of 30One River Point, Business Bay construction progress — 21 July 2026, 35.43% complete, photo 6 of 30One River Point, Business Bay construction progress — 21 July 2026, 35.43% complete, photo 7 of 30One River Point, Business Bay construction progress — 21 July 2026, 35.43% complete, photo 8 of 30One River Point, Business Bay construction progress — 21 July 2026, 35.43% complete, photo 9 of 30One River Point, Business Bay construction progress — 21 July 2026, 35.43% complete, photo 10 of 30One River Point, Business Bay construction progress — 21 July 2026, 35.43% complete, photo 11 of 30One River Point, Business Bay construction progress — 21 July 2026, 35.43% complete, photo 12 of 30One River Point, Business Bay construction progress — 21 July 2026, 35.43% complete, photo 13 of 30One River Point, Business Bay construction progress — 21 July 2026, 35.43% complete, photo 14 of 30One River Point, Business Bay construction progress — 21 July 2026, 35.43% complete, photo 15 of 30One River Point, Business Bay construction progress — 21 July 2026, 35.43% complete, photo 16 of 30One River Point, Business Bay construction progress — 21 July 2026, 35.43% complete, photo 17 of 30One River Point, Business Bay construction progress — 21 July 2026, 35.43% complete, photo 18 of 30One River Point, Business Bay construction progress — 21 July 2026, 35.43% complete, photo 19 of 30One River Point, Business Bay construction progress — 21 July 2026, 35.43% complete, photo 20 of 30One River Point, Business Bay construction progress — 21 July 2026, 35.43% complete, photo 21 of 30One River Point, Business Bay construction progress — 21 July 2026, 35.43% complete, photo 22 of 30One River Point, Business Bay construction progress — 21 July 2026, 35.43% complete, photo 23 of 30One River Point, Business Bay construction progress — 21 July 2026, 35.43% complete, photo 24 of 30One River Point, Business Bay construction progress — 21 July 2026, 35.43% complete, photo 25 of 30One River Point, Business Bay construction progress — 21 July 2026, 35.43% complete, photo 26 of 30One River Point, Business Bay construction progress — 21 July 2026, 35.43% complete, photo 27 of 30One River Point, Business Bay construction progress — 21 July 2026, 35.43% complete, photo 28 of 30One River Point, Business Bay construction progress — 21 July 2026, 35.43% complete, photo 29 of 30One River Point, Business Bay construction progress — 21 July 2026, 35.43% complete, photo 30 of 30
27.03.2026 28.79%
One River Point, Business Bay construction progress — 27 March 2026, 28.79% complete, photo 1 of 6One River Point, Business Bay construction progress — 27 March 2026, 28.79% complete, photo 2 of 6One River Point, Business Bay construction progress — 27 March 2026, 28.79% complete, photo 3 of 6One River Point, Business Bay construction progress — 27 March 2026, 28.79% complete, photo 4 of 6One River Point, Business Bay construction progress — 27 March 2026, 28.79% complete, photo 5 of 6One River Point, Business Bay construction progress — 27 March 2026, 28.79% complete, photo 6 of 6

84 more photos in the DLD register

Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.

Registered transactions in One River Point

Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.

292DLD registrations incl. resales, since 2024
28 454AED per m², median
0%resale, the rest bought from the developer
-2%over the past year

The yearly figure compares the last 12 months with the 12 before them: calendar years would not work, the current one is unfinished. The district moved +3% over the same period, so the building lagged.

What buyers actually paid

TypeSize, m²Price, AEDPer m²Deals
Studio451 471 82832 70718
1 bedroom972 797 82828 84495
2 bedrooms1564 280 82827 441141
3 bedrooms2216 641 82830 05432

Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.

How the price per square metre moved

From 2024 to 2026 — 0% on the price per square metre in this building. The district moved -4% over the same period, so the building tracked the market.

28 4232024——
28 7072025——
28 4392026*——

Top to bottom: purchase price per m², year, annual rent per m², gross yield.

All figures are medians. Years with fewer than eight deals are skipped; rent is shown where there are at least twenty contracts. The yield is gross — service charges are not published in the register.

* 2026 is still in progress and its bar covers part of the year. The growth figure above uses completed years.

Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.

Recent transactions

DateTypeSize, m²Price, AED
02.11.20262 BR165.05 164 828
02.11.20262 BR137.33 658 828
30.10.20261 BR97.13 049 828
16.10.20261 BR88.92 300 000
15.10.20263 BR221.06 600 000
28.09.20261 BR97.12 837 828
17.09.20262 BR156.34 650 828
16.09.20262 BR156.64 536 828
04.09.20261 BR97.13 222 828
25.08.20262 BR165.05 516 828
25.08.20262 BR165.44 694 828
18.08.20262 BR134.43 515 828
12.08.20262 BR134.83 831 828
03.08.2026Studio45.31 565 828
31.07.20262 BR165.44 342 828
31.07.20261 BR88.92 162 500
27.07.20262 BR137.33 606 828
21.07.20261 BR111.22 901 828
16.07.20262 BR165.44 492 828
16.07.20263 BR221.07 552 828
16.07.20262 BR164.75 025 828
14.07.2026Studio45.31 385 828
09.07.20261 BR88.93 005 828
09.07.20262 BR137.33 197 828
29.06.20262 BR134.83 780 828
18.06.20262 BR165.05 211 828
17.06.20261 BR97.52 563 828
11.06.20262 BR137.33 800 828
10.06.20262 BR156.35 069 828
03.06.20262 BR134.43 105 828
18.05.20261 BR88.93 257 828
08.05.2026Studio45.31 519 828
04.05.20262 BR156.34 953 828
30.04.20262 BR156.34 822 828
30.04.20262 BR156.35 169 828
30.04.2026Studio45.31 590 828
27.04.20262 BR156.34 798 828
24.04.20262 BR165.44 765 828
20.04.20262 BR156.34 847 828
15.04.20261 BR98.82 803 828
14.04.20261 BR88.93 005 828
10.04.20262 BR165.44 930 828
07.04.20262 BR137.33 553 828
01.04.20261 BR88.92 785 828
31.03.20262 BR134.83 819 828
31.03.20262 BR134.83 489 828
31.03.2026Studio45.31 372 828
31.03.20262 BR137.33 534 828
31.03.20262 BR164.74 420 828
31.03.20261 BR97.13 175 828

Dubai Land Department transaction registry, updated 16.11.2026. Explore Dubai property transactions →

Mortgage for this project

For UAE residents the down payment starts at 20% with terms up to 25 years. Indicative monthly payment for prices from 1 482 828 AED is 6 262 AED.

Calculate mortgage

Estimates only; not a bank approval.

Amenities

  • Infinity-edge pool (adults)
  • Duplex private terraces
  • Clubhouse
  • F&B
  • Family pool deck
  • Public plaza
  • Infinity-edge pool (family)
  • Fitness club/multi-sport hall
  • Kids play area
  • Immersive room
  • Fitness studio
  • Yoga studio
  • Concierge service

What is nearby

  • Burj Khalifa7 мин
  • Business Bay5 мин
  • City Walk Mall10 мин
  • Dubai International Airport20 мин
  • Dubai Mall7 мин
  • Dubai Water Canal Boardwalk1 мин
  • Dubai Waterfall2 мин
  • Mall of the Emirates13 мин

Places nearby

One River Point

Your broker for this project

Vladimir Malin

Vladimir Malin

Senior Broker · Continental Club Property · RERA ORN 31933

Answers questions about One River Point: current availability, payment plan, DLD registration. English and Russian.

Get the presentation and prices

We will send floor plans, the payment plan and available units for this project.

By submitting the form you agree to the processing of your contact details, including for advertising analytics.

Project data comes from the Dubai Land Department (DLD) registry.

Every figure carries its origin: “DLD registry” is taken from the Dubai Land Department register, “Developer supplied” is stated by the developer, “Our calculation” is computed by us from the first two. Developer prices change without notice — confirm before you commit. Methodology

About the project

One River Point is a 295-apartment residential tower in Business Bay, overlooking Dubai Canal and with views towards Burj Khalifa. It is being developed by Ellington Properties in collaboration with Dutco. The project is active and recorded at 35.43% completion, with handover scheduled for Q2 2027.

A canal-front residential tower

One River Point comprises three basement levels, a ground floor, five podium levels, 37 residential floors, a roof and an upper roof level. The building contains 37 residential floors and five podiums, with seven passenger elevators and one service elevator. Its design is defined by sleek lines and floor-to-ceiling glass panels, while the building overlooks Dubai Canal and has views of Burj Khalifa. The project is offered on a freehold ownership basis. A total of 295 apartments (+3 non-residential units) are recorded for the development, creating a residential collection that ranges from studios to larger duplex and penthouse homes.

Residence types and sizes

The available residence collection includes studios, one-, two- and three-bedroom apartments, two-bedroom apartments with S, four-bedroom duplexes, and three- and four-bedroom penthouses. Studios start from 487 sq ft. One-bedroom apartments range from 958 to 1,199 sq ft, while two-bedroom apartments range from 1,447 to 1,795 sq ft. Three-bedroom apartments range from 2,397 to 3,968 sq ft. Four-bedroom duplexes range from 4,971 to 5,576 sq ft, and include private terraces. Three-bedroom penthouses range from 3,502 to 3,734 sq ft. Four-bedroom penthouses start from 5,847 sq ft. Some layouts may include a laundry room, powder room and maid’s room.

Amenities and shared spaces

The amenity programme includes separate infinity-edge pools for adults and families, along with a family pool deck. Residents have access to a clubhouse, fitness club and multi-sport hall, fitness studio, yoga studio and an immersive room. The project also includes a children’s play area, public plaza and food and beverage provision. Concierge service is included among the building services. Cabanas, a lounge and co-working space are also part of the amenity offering. The combination of pool, fitness, social and work-focused spaces is arranged within the project’s shared areas, while duplex residences have private terraces.

Parking and building access

Studios and one- and two-bedroom residences are allocated one car parking space each. Three- and four-bedroom residences are allocated two car parking spaces each. Vertical access across the tower is provided by seven passenger elevators and one service elevator. The building configuration includes three basement levels and five podium levels below the 37 residential floors. These levels form part of a single-building development in Business Bay. The project’s shared facilities include a public plaza, clubhouse, pool areas, fitness facilities and concierge service, complementing the residential floors and podium structure.

Business Bay location

One River Point is located in Business Bay on Dubai Canal. Dubai Water Canal Boardwalk is 1 minute away, while Dubai Waterfall is 2 minutes away. Burj Khalifa and Dubai Mall are 7 minutes away, and the Museum of the Future is 8 minutes away. Mall of the Emirates is 5 minutes away and Burj Al Arab is 10 minutes away. Business Bay Metro Station is 13 minutes away. Dubai International Financial Centre is 17 minutes away, Dubai Design District is 19 minutes away, and Al Maktoum International Airport is 20 minutes away. Palm Jumeirah is 15 minutes away.

Price, payment plan and handover

Prices at One River Point start from AED 1,482,828. The payment plan is structured as 20% on booking, 50% during construction and 30% on handover, creating a 70/30 split between construction-stage and handover payments. Handover is scheduled for Q2 2027. The recorded project completion date is 9 June 2027. Construction started on 24 October 2023. The project is active, with a recorded completion ratio of 35.43%. This status and completion figure apply to the project as a whole, which is planned as one building with 295 apartments (+3 non-residential units).

Ellington Properties

One River Point is developed by Ellington Properties in collaboration with Dutco. Ellington Properties has operated in Dubai since 2014 and has developed projects in locations including Downtown Dubai, Palm Jumeirah and JVC. The partnership for One River Point combines Ellington Properties’ resident-first approach with Dutco’s construction experience. At One River Point, the development centres on a canal-front tower in Business Bay, with a residential offering spanning studios, apartments, duplexes and penthouses. The building’s amenities include pools, fitness facilities, a yoga studio, clubhouse, children’s play area, public plaza and concierge service.

Service charge: what to expect

The building is still under construction, so it has no RERA-approved budget yet — that comes after handover. The figures below are what already-completed buildings in the area pay.

Area median19.98 AEDper sq ft per year · 215 AED/m²
Range in the area4.94 – 53.95AED per sq ft · 85 buildings
A 1,000 sq ft unit≈ 19,980 AEDper year at the median · ≈ $5,440
vs Dubai median▲ +24.7%Dubai 16.02 AED/sq ft

Check the charge for a specific building →

Median across 85 completed buildings in Business Bay for 2026, from the DLD service charge index (Mollak). This is an area benchmark, not this project’s rate: RERA approves that after handover and it may land either side of the median.

Frequent questions

Who is the developer of One River Point?
One River Point is developed by Ellington Properties in collaboration with Dutco.
Where is One River Point located?
One River Point is in Business Bay, overlooking Dubai Canal.
What is the starting price at One River Point?
Prices start from AED 1,482,828.
When is the One River Point handover date?
One River Point handover (completion) is scheduled for Q2 2027 (developer data). The DLD register lists 9 June 2027. Construction progress was 35.43% at the DLD inspection of 21 July 2026. The date and progress on this page are updated from the DLD register. For current availability, prices and resale (assignment) options, send an enquiry on this page.
What is the payment plan for One River Point?
The payment plan requires 20% on booking, 50% during construction and 30% on handover.
What types of homes are available at One River Point?
The project offers studios, one- to three-bedroom apartments, two-bedroom apartments with S, four-bedroom duplexes, and three- and four-bedroom penthouses.
What amenities does One River Point offer?
Amenities include adult and family infinity-edge pools, a clubhouse, fitness facilities, yoga studio, immersive room, children’s play area, public plaza and concierge service.
What is the construction status of One River Point?
The project is active and recorded at 35.43% completion.
What is nearby One River Point?
Dubai Water Canal Boardwalk is 1 minute away, Dubai Waterfall is 2 minutes away, and Burj Khalifa and Dubai Mall are 7 minutes away.
How many apartments are left in One River Point?
According to the Dubai Land Department (DLD) register, as of 13 Nov 2026 ≈24 of 295 apartments in One River Point have no registered sale; 271 have been sold to first buyers (92%). This is registry data, not a developer availability list: please confirm current availability and prices with our sales team — leave a request on this page.
How can I buy an apartment in One River Point?
Submit an enquiry via the form on this page or message us on WhatsApp — a Continental Club Property broker (RERA 31933) will help you choose a unit and send the brochure and payment plan.

Estimate a unit in this building from DLD sales

Based on 50 registered DLD sales in One River Point between 31 Mar 2026 and 2 Nov 2026: median 29 786 AED/m² (2 767 AED/sq ft); half of the deals fell between 26 696 and 31 670 AED/m². This is transaction statistics, not a valuation of a specific unit: floor, view, finish and condition move the price.

TypeIndicative priceDealsMedian AED/m²Median area, m²
StudioAED 1 520 000533 55045.3
1 BRAED 3 043 0001331 34097.1
2 BRAED 4 441 0003028 411156.3
Get an exact valuation

Source: Dubai Land Department open data, the latest up to 50 sales in the building; areas as registered; refreshed daily. Deals outside 3,000–200,000 AED/m² are excluded.

PDF shortlist · updated 1 November 2026

Business Bay: new projects and prices

30 projects · prices from DLD and developers

  1. Chic Tower by de Grisogono Chic Tower by de Grisogono Business Bay · Studio, 1–4 BR from AED 823,000
  2. Binghatti Skyrise Binghatti Skyrise Business Bay · Studio, 1–3 BR from AED 975,000
  3. Binghatti Skyhall Binghatti Skyhall Business Bay · Studio, 1 BR from AED 985,000

27 more in the PDF: prices, handover dates, payment plans

The PDF opens instantly. Refreshed monthly from DLD data.

How much is your property in One River Point worth?

271 of 295 apartments have been sold to first buyers per the DLD register. DLD registrations, including resales: 292 (since 2024). We compare your unit with sales of the same layout here, not with asking prices. Free, reply within 24 hours.

By submitting the form you agree to the processing of your contact details, including for advertising analytics.

More projects by Ellington Properties

All 64 projects by Ellington Properties →

Nearby projects

For AI agents and researchers

Machine-readable mirrors of this page: Markdown · JSON. They carry the same figures as this page, each with its origin labelled.

How to cite:One River Point — Continental Club Property, from Dubai Land Department registry and developer data, 2026-11-13, https://continentalclub.ae/project/one-river-point-business-bay/

Where should we send the shortlist?

The PDF downloads right after you submit. A manager gets in touch only if you ask.