Dubai, Dubai Islands, Marea Residences

Marea is a residential project by Sharafi Development in Dubai Islands, Dubai, with handover 20.06.2027, construction 5.3% complete per the DLD registry.

Construction5.3%

Payment plan 40/30

5%35%30%
  • Down payment5%
  • During construction35%
  • On handover30%

Construction progress

5.33%
  • Handover20.06.2027
  • Status date10.06.2026
  • DLD project number3879

Data from the Dubai Land Department project registry (updated 12.08.2026 09:55).

Construction progress 23
10 June 2026 5.33%
Marea, Dubai Islands construction progress — 10 June 2026, 5.33% complete, photo 1 of 6Marea, Dubai Islands construction progress — 10 June 2026, 5.33% complete, photo 2 of 6Marea, Dubai Islands construction progress — 10 June 2026, 5.33% complete, photo 3 of 6Marea, Dubai Islands construction progress — 10 June 2026, 5.33% complete, photo 4 of 6Marea, Dubai Islands construction progress — 10 June 2026, 5.33% complete, photo 5 of 6Marea, Dubai Islands construction progress — 10 June 2026, 5.33% complete, photo 6 of 6

Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.

Recent transactions

DateTypeSize, m²Price, AED
20.07.20262 BR121.23 470 233
07.01.20262 BR115.73 352 877
16.12.20252 BR138.13 312 939

Dubai Land Department transaction registry, updated 2026-08-11. Explore Dubai property transactions →

Places nearby

About the project

Marea is a 68-unit residential building by Sharafi Real Estate Development in Dubai Islands. The project is active, with a recorded completion ratio of 5.33% following an inspection dated 10 June 2026. Its planned completion date is 20 June 2027.

The project and building configuration

Marea is planned as a residential building with a G+2P+12+Roof configuration. The development includes a swimming pool and gym on the first floor. It has 68 total units across the building. Construction started on 20 July 2025, and the project remains active. The recorded completion ratio is 5.33%, with the latest stated inspection taking place on 10 June 2026. The planned completion date is 20 June 2027. Marea is located within Dubai Islands, the five-island waterfront masterplan on Dubai’s northern coastline.

Residential scale

The project has 68 units in total, placing all residences within one G+2P+12+Roof residential building. The building combines its residential floors with two parking levels and a roof level in the stated configuration. The swimming pool and gym are positioned on the first floor. Marea’s planned construction period runs from 20 July 2025 to 20 June 2027. Its active status and 5.33% completion ratio reflect the recorded construction position following the June 2026 inspection.

Pool and gym

Marea includes a swimming pool and gym on the first floor of the building. These facilities form part of the residential building configuration, which is listed as G+2P+12+Roof. The project contains 68 units and is planned as a single residential building in Dubai Islands. Construction began on 20 July 2025, and the stated completion date is 20 June 2027. The latest recorded completion ratio is 5.33%.

Dubai Islands setting

Dubai Islands is a waterfront masterplan made up of Marina Island, Central Island, Shore Island, Golf Island and Elite Island. The wider plan combines residential, hospitality, marina and public-realm components across 17 square kilometres. Central Island is designed around Deira Mall and The Night Market, which is planned to include more than 5,300 shops and 100 quayside cafés and restaurants. The masterplan includes 37 hotels and resorts. The RIU and Centara resorts are already open from the earlier Deira Islands phase. Dubai Islands also provides for public beaches, parks, waterfront villas, apartments and a marina network.

Road and Metro connections

Dubai International Airport is 9.6 km from Dubai Islands by road. Downtown Dubai is 13.8 km away by road, while The Dubai Mall is 13.7 km away and DIFC is 12.1 km away. Business Bay is 15.3 km away, Palm Jumeirah is 28.3 km away, and Dubai Marina is 31.1 km away by road. The nearest Metro access is Green Line station G22, 4.7 km from Dubai Islands. Road connections include planned and ongoing bridge works, including a 1,425-metre, eight-lane bridge to Bur Dubai and a 1.4 km bridge under the Shindagha Corridor Project.

Marina, beaches and public realm

Nakheel Marinas Dubai Islands launched in May 2023. The marina has capacity for 13 superyachts at one time, 248 wet berths for vessels up to 47 metres, and 40 dry berths for trailers up to 20 metres. Its facilities include parking, showers, washrooms, a launderette, dock assistance, club-car transfers, utilities and waste services. The wider Dubai Islands plan includes Blue Flag-designated beaches, public beaches and two square kilometres of parks and open areas. Shore Island is planned for sports and resort uses, while Golf Island includes an 18-hole golf course and wellness enclaves. Elite Island is earmarked for waterfront villas.

Developer and programme

Sharafi Real Estate Development is the developer of Marea. The project programme began on 20 July 2025 and has a planned completion date of 20 June 2027. Marea is currently active, with a completion ratio of 5.33% recorded after the inspection dated 10 June 2026. The development consists of 68 units within a G+2P+12+Roof residential building. Its first-floor facilities include a swimming pool and gym, and its location is Dubai Islands.

FAQ

Who is the developer of Marea?
Marea is developed by Sharafi Real Estate Development.
Where is Marea located?
Marea is located in Dubai Islands on Dubai’s northern coastline.
What is the current completion status of Marea?
Marea is active and has a recorded completion ratio of 5.33%. The stated inspection date is 10 June 2026.
When is Marea planned for completion?
The planned completion date is 20 June 2027.
How many units does Marea have?
Marea has 68 total units.
What is the building configuration at Marea?
Marea is configured as a G+2P+12+Roof residential building.
What amenities does Marea include?
The building includes a swimming pool and gym on the first floor.
What is near Marea at Dubai Islands?
Dubai Islands includes a marina, public beaches, parks, hotels and resorts. Dubai International Airport is 9.6 km away by road, and Downtown Dubai is 13.8 km away by road.
How can I buy an apartment in Marea?
Submit an enquiry via the form on this page or message us on WhatsApp — a Continental Club Property broker (RERA 31933) will help you choose a unit and send the brochure and payment plan.

Nearby projects

Request
Request