Marea is a residential project by Sharafi Development in Dubai Islands, Dubai, with handover 20.06.2027, construction 5.3% complete per the DLD registry.
Payment plan 40/30
- Down payment5%
- During construction35%
- On handover30%
Construction progress
- Handover20.06.2027
- Status date10.06.2026
- DLD project number3879
Data from the Dubai Land Department project registry (updated 12.08.2026 09:55).
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: Sharafi Development · District: Dubai Islands
Recent transactions
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 20.07.2026 | 2 BR | 121.2 | 3 470 233 |
| 07.01.2026 | 2 BR | 115.7 | 3 352 877 |
| 16.12.2025 | 2 BR | 138.1 | 3 312 939 |
Dubai Land Department transaction registry, updated 2026-08-11. Explore Dubai property transactions →
Places nearby
About the project
Marea is a 68-unit residential building by Sharafi Real Estate Development in Dubai Islands. The project is active, with a recorded completion ratio of 5.33% following an inspection dated 10 June 2026. Its planned completion date is 20 June 2027.
The project and building configuration
Marea is planned as a residential building with a G+2P+12+Roof configuration. The development includes a swimming pool and gym on the first floor. It has 68 total units across the building. Construction started on 20 July 2025, and the project remains active. The recorded completion ratio is 5.33%, with the latest stated inspection taking place on 10 June 2026. The planned completion date is 20 June 2027. Marea is located within Dubai Islands, the five-island waterfront masterplan on Dubai’s northern coastline.
Residential scale
The project has 68 units in total, placing all residences within one G+2P+12+Roof residential building. The building combines its residential floors with two parking levels and a roof level in the stated configuration. The swimming pool and gym are positioned on the first floor. Marea’s planned construction period runs from 20 July 2025 to 20 June 2027. Its active status and 5.33% completion ratio reflect the recorded construction position following the June 2026 inspection.
Pool and gym
Marea includes a swimming pool and gym on the first floor of the building. These facilities form part of the residential building configuration, which is listed as G+2P+12+Roof. The project contains 68 units and is planned as a single residential building in Dubai Islands. Construction began on 20 July 2025, and the stated completion date is 20 June 2027. The latest recorded completion ratio is 5.33%.
Dubai Islands setting
Dubai Islands is a waterfront masterplan made up of Marina Island, Central Island, Shore Island, Golf Island and Elite Island. The wider plan combines residential, hospitality, marina and public-realm components across 17 square kilometres. Central Island is designed around Deira Mall and The Night Market, which is planned to include more than 5,300 shops and 100 quayside cafés and restaurants. The masterplan includes 37 hotels and resorts. The RIU and Centara resorts are already open from the earlier Deira Islands phase. Dubai Islands also provides for public beaches, parks, waterfront villas, apartments and a marina network.
Road and Metro connections
Dubai International Airport is 9.6 km from Dubai Islands by road. Downtown Dubai is 13.8 km away by road, while The Dubai Mall is 13.7 km away and DIFC is 12.1 km away. Business Bay is 15.3 km away, Palm Jumeirah is 28.3 km away, and Dubai Marina is 31.1 km away by road. The nearest Metro access is Green Line station G22, 4.7 km from Dubai Islands. Road connections include planned and ongoing bridge works, including a 1,425-metre, eight-lane bridge to Bur Dubai and a 1.4 km bridge under the Shindagha Corridor Project.
Marina, beaches and public realm
Nakheel Marinas Dubai Islands launched in May 2023. The marina has capacity for 13 superyachts at one time, 248 wet berths for vessels up to 47 metres, and 40 dry berths for trailers up to 20 metres. Its facilities include parking, showers, washrooms, a launderette, dock assistance, club-car transfers, utilities and waste services. The wider Dubai Islands plan includes Blue Flag-designated beaches, public beaches and two square kilometres of parks and open areas. Shore Island is planned for sports and resort uses, while Golf Island includes an 18-hole golf course and wellness enclaves. Elite Island is earmarked for waterfront villas.
Developer and programme
Sharafi Real Estate Development is the developer of Marea. The project programme began on 20 July 2025 and has a planned completion date of 20 June 2027. Marea is currently active, with a completion ratio of 5.33% recorded after the inspection dated 10 June 2026. The development consists of 68 units within a G+2P+12+Roof residential building. Its first-floor facilities include a swimming pool and gym, and its location is Dubai Islands.