Developer: Enzo Prime Development · Dubai Islands
Maravea Residences is a residential project by Enzo Prime Development in Dubai Islands, Dubai, with prices from AED 2 004 000, handover Q2 2028, construction 0% complete per the DLD registry, 63 units.
| Type | Units | Typical size, sq.ft |
|---|---|---|
| 1 Bedroom | 22 | 793–920 |
| 2 Bedroom | 34 | 1 211–1 532 |
| 3 Bedroom | 7 | 2 029–3 914 |
Size range excludes the smallest and largest 5% of units of each type.
All units are freehold. Data from the DLD registry.
A broker will compare this project with 3 similar ones: prices, handover dates and payment plans.
For UAE residents the down payment starts at 20% with terms up to 25 years. Indicative monthly payment for prices from 2 004 000 AED is 8 462 AED.
Estimates only; not a bank approval.
All Dubai projects handing over in 2028 →
Data from the Dubai Land Department project registry (updated 12.11.2026 05:55).
The register shows the same percentage as at the inspection on 18.11.2025.
The pace is calculated from the past year of inspections. It is an estimate, not a developer commitment. For reference: across 1,175 completed projects the median pace is 2.48% per month and the median build takes 40 months.
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: Enzo Prime Development · District: Dubai Islands
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 19.08.2026 | 2 BR | 139.5 | 3 290 000 |
| 18.08.2026 | 1 BR | 75.9 | 2 070 000 |
| 18.08.2026 | 1 BR | 76.8 | 2 070 600 |
| 14.07.2026 | 1 BR | 75.9 | 2 004 000 |
| 13.07.2026 | 1 BR | 87.8 | 2 207 000 |
Dubai Land Department transaction registry, updated 11.11.2026. Explore Dubai property transactions →
Based on 5 registered DLD sales in Maravea Residences between 13 Jul 2026 and 19 Aug 2026: median 26 396 AED/m² (2 452 AED/sq ft); half of the deals fell between 25 128 and 26 950 AED/m². This is transaction statistics, not a valuation of a specific unit: floor, view, finish and condition move the price.
| Type | Indicative price | Deals | Median AED/m² | Median area, m² |
|---|---|---|---|---|
| 1 BR | AED 2 038 000 | 4 | 26 673 | 76.4 |
Source: Dubai Land Department open data, the latest up to 50 sales in the building; areas as registered; refreshed daily. Deals outside 3,000–200,000 AED/m² are excluded.
PDF shortlist · updated 1 November 2026
Dubai Islands: new projects and prices
30 projects · prices from DLD and developers
Azizi Wasel Dubai Islands · Studio, 1–3 BR
from AED 1,040,000
DO Hotels & Residences Dubai Islands
from AED 1,050,000
Ellington Cove 2 Dubai Islands
from AED 1,250,000
27 more in the PDF: prices, handover dates, payment plans
The PDF opens instantly. Refreshed monthly from DLD data.

Olesia Kotova
Broker · Continental Club Property · RERA ORN 31933
Answers questions about Maravea Residences: current availability, payment plan, DLD registration. English and Russian.

Maravea Residences is a waterfront apartment development on Dubai Islands by Enzo Prime Development. The project contains 63 apartments and is planned with one-, two- and three-bedroom homes. It is active, with a reported completion ratio of 3% and a completion date of 30 April 2028.
Maravea Residences is a boutique residential project comprising 63 apartments on Dubai Islands. The homes are presented as one-, two- and three-bedroom apartments, set beside tranquil waters with open-water views. The architectural approach combines contemporary and classic design, while the residences are planned with oversized windows and light-filled interiors. Interiors follow a modern, minimalist direction, and the apartments are semi-furnished. Each kitchen is described as modern and fitted with appliances, including a dishwasher in every home. The development’s design includes three levels of resident amenities, placing leisure, work and wellness facilities within the building.
The residence collection includes one-, two- and three-bedroom apartments. The layouts are presented with generous floorplans, natural light and views towards open water. Semi-furnished interiors bring together modern finishes and functional details, while the kitchen specification includes appliances and a dishwasher in every apartment. The homes are designed with a minimalist interior style and contemporary finishes. Maravea Residences is planned as an intimate apartment community rather than a large-scale residential scheme, with all 63 homes forming part of the same waterfront development on Dubai Islands.
Maravea Residences is planned with three levels of lifestyle amenities. The leisure offering includes an infinity pool, jacuzzi, sky lounge and private cinema. Dedicated facilities for work include co-working spaces. Wellness areas comprise indoor and outdoor gyms, along with spaces for yoga and meditation. Families are included in the amenity plan through dedicated children’s pools and play zones. These facilities form part of the residential development and are intended exclusively for its community. The mix of pool, lounge, cinema, workspaces and fitness areas gives the building a defined set of social, recreational and wellness-oriented spaces.
Maravea Residences is located on Dubai Islands, a five-island waterfront destination on Dubai’s northern coastline. Dubai Islands Beach is 1.6 km from the project. Dubai Heritage Village and Dubai Museum are each 3.1 km away, while Queen Elizabeth 2 is 4.0 km away. Maritime City Park is 4.3 km away and Oud Metha Park is 5.0 km away. Dubai Creek Golf & Yacht Club is 5.9 km from Maravea Residences. The location information also places Dubai International Airport 15 minutes away, with Burj Khalifa, Dubai Mall and DIFC each listed at 20, 20 and 15 minutes respectively. Burj Al Arab is listed at 25 minutes and Dubai Island Beach at 3 minutes.
The project is active. Construction began on 15 November 2025, and the reported completion ratio is 3%. The latest inspection date is 8 July 2026. Completion is scheduled for 30 April 2028. The development has a total area of 7,852.26 and contains 63 units. These project details establish Maravea Residences as a current off-plan development on Dubai Islands, with construction activity underway and a stated completion date in 2028.
The payment plan allocates 40% during construction through instalments. A further 20% is due on handover at 100% completion. The remaining 40% is scheduled post-handover within 24 months. This creates a structure in which 60% is allocated before or at handover, followed by a post-handover balance. The stated handover-linked payment is tied to completion of the project, which is scheduled for 30 April 2028.
Maravea Residences is being developed by Enzo Prime Development. The developer is delivering a 63-unit apartment project on Dubai Islands, with one-, two- and three-bedroom residences. The project’s residential specification includes semi-furnished homes, kitchens with appliances and a dishwasher in every unit, alongside three levels of amenities. The stated development programme began on 15 November 2025 and has a scheduled completion date of 30 April 2028.
Dubai market as a whole: prices, transactions and trends (DLD data) →
We will send floor plans, the payment plan and available units for this project.
Project data comes from the Dubai Land Department (DLD) registry.
Every figure carries its origin: “DLD registry” is taken from the Dubai Land Department register, “Developer supplied” is stated by the developer, “Our calculation” is computed by us from the first two. Developer prices change without notice — confirm before you commit. Methodology
Machine-readable mirrors of this page: Markdown · JSON. They carry the same figures as this page, each with its origin labelled.
How to cite:Maravea Residences — Continental Club Property, from Dubai Land Department registry and developer data, 2026-10-01, https://continentalclub.ae/project/maravea-residences-dubai-islands/