by Lincoln Star Real Estate Development in Dubai South Residential District
Lincoln Star Residence is a residential project by Lincoln Star Real Estate Development in Dubai South Residential District, Dubai, with handover 30.09.2026, construction 47.2% complete per the DLD registry.
Construction progress
- Handover30.09.2026
- Status date26.02.2026
- DLD project number3102
Data from the Dubai Land Department project registry (updated 06.08.2026 09:55).
Recent transactions
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 20.07.2026 | Studio | 38.5 | 525 000 |
| 29.06.2026 | 1 BR | 75.0 | 1 000 246 |
| 18.05.2026 | Studio | 38.5 | 550 000 |
| 14.05.2026 | 1 BR | 78.7 | 847 120 |
| 13.04.2026 | 1 BR | 78.0 | 1 050 000 |
| 11.02.2026 | Studio | 38.5 | 540 122 |
| 14.01.2026 | 2 BR | 124.6 | 1 475 672 |
| 07.01.2026 | 2 BR | 114.6 | 1 048 339 |
| 05.01.2026 | 2 BR | 114.6 | 1 048 339 |
| 05.01.2026 | 2 BR | 114.6 | 1 054 106 |
| 11.12.2025 | 1 BR | 78.0 | 998 982 |
| 26.11.2025 | 1 BR | 78.7 | 1 090 028 |
| 20.11.2025 | 2 BR | 114.6 | 1 295 007 |
| 19.11.2025 | 2 BR | 114.6 | 1 233 330 |
| 11.11.2025 | 2 BR | 114.0 | 1 226 870 |
| 06.11.2025 | 2 BR | 114.0 | 1 226 870 |
| 05.11.2025 | 2 BR | 124.6 | 1 442 310 |
| 17.10.2025 | 2 BR | 124.6 | 1 341 500 |
| 13.10.2025 | 2 BR | 114.0 | 1 048 590 |
| 13.10.2025 | Studio | 38.5 | 414 840 |
Dubai Land Department transaction registry, updated 2026-08-06. Explore Dubai property transactions →
About the project
Lincoln Star Residence is a single-building residential project in Dubai South Residential District. Lincoln Star Real Estate Development is developing the G+4+R building, which contains 48 residences. The project is active, with a 47.21% completion ratio recorded on 26 February 2026 and scheduled project completion on 30 September 2026.
The building and project configuration
Lincoln Star Residence comprises one building configured as ground level, four upper floors and a roof level. The development has 48 residences in total. Its registered area is Madinat Al Mataar, within Dubai South Residential District. The project began on 1 October 2024 and has a scheduled completion date of 30 September 2026. Lincoln Star Residence is an active development, with the latest recorded completion ratio at 47.21% following an inspection dated 26 February 2026. The building’s residential programme combines studios, one-bedroom and two-bedroom apartments with two three-bedroom townhouse residences.
Residence types
The 48 residences are divided across four home types. There are six studio apartments, 18 one-bedroom apartments and 22 two-bedroom apartments, making apartments the principal component of the building. The remaining two residences are three-bedroom townhouses. This creates a defined mix of compact studio accommodation, one- and two-bedroom apartments, and a limited number of larger three-bedroom townhouse homes. The stated unit count is 48 across the single G+4+R building. Lincoln Star Residence is located in Dubai South Residential District, a residential area within the wider Dubai South masterplan.
Residents’ facilities
The facilities at Lincoln Star Residence include a gymnasium, swimming pool and jacuzzi. The development also includes a children’s play area and a multi-purpose event area. These facilities form the stated shared amenity provision for the 48-residence building. The gymnasium provides a dedicated fitness facility within the project, while the swimming pool and jacuzzi are listed alongside the children’s play area and the multi-purpose event area. Lincoln Star Residence is a single-building development, so these facilities serve the residences within its G+4+R configuration.
Dubai South Residential District
Lincoln Star Residence is situated in Dubai South Residential District, the residential component of the wider Dubai South masterplan. The district is positioned in relation to Al Maktoum International Airport and Dubai South’s economic, logistics and aviation precincts. It is planned as a housing neighbourhood with residential blocks, open spaces and local infrastructure. The project’s registered area is Madinat Al Mataar. Dubai South Residential District contains residential developments at different stages, including completed and active projects. Lincoln Star Residence adds a 48-residence building to this residential setting, with studios, one-bedroom apartments, two-bedroom apartments and three-bedroom townhouses.
Nearby parks and destinations
Pulse Community Park 2 is 0.2 km from Lincoln Star Residence. Pulse Community Park 1 and Pulse Beachfront Park are each 0.5 km away. Expo City Dubai is 7.7 km from the project. The nearby golf destinations listed for the area include Jumeirah Golf Estates Golf Course at 9.4 km, Trump International Golf Club at 10.0 km and The Els Golf Club at 10.9 km. These distances place three parks within 0.5 km of the residence, while Expo City Dubai and the listed golf courses are further from the building.
Construction progress and scheduled completion
Lincoln Star Residence has active status. Its project start date is 1 October 2024, and its scheduled completion date is 30 September 2026. The completion ratio was 47.21% at the inspection conducted on 26 February 2026. The project is identified under project number 3102. Construction progress is recorded for the full development rather than individual residence types. The programme covers the single G+4+R building and its 48 residences, including six studios, 18 one-bedroom apartments, 22 two-bedroom apartments and two three-bedroom townhouses.
The developer
Lincoln Star Real Estate Development is the developer of Lincoln Star Residence. The company is developing the project in Dubai South Residential District. The development is configured as one G+4+R building with 48 residences and shared facilities comprising a gymnasium, swimming pool, jacuzzi, children’s play area and multi-purpose event area. The residence mix includes six studios, 18 one-bedroom apartments, 22 two-bedroom apartments and two three-bedroom townhouses. The project commenced on 1 October 2024 and is scheduled for completion on 30 September 2026.