by Laya Developers in Studio City
Laya Courtyard is a residential project by Laya Developers in Studio City, Dubai, with handover 26.12.2026, construction 36.9% complete per the DLD registry.
Construction progress
- Handover26.12.2026
- Status date23.03.2026
- DLD project number2871
Data from the Dubai Land Department project registry (updated 08.08.2026 10:48).
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: Laya Developers · District: Studio City
Recent transactions
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 30.07.2026 | 1 BR | 67.2 | 1 045 000 |
| 30.07.2026 | 1 BR | 62.4 | 1 109 300 |
| 29.06.2026 | 1 BR | 63.3 | 1 117 978 |
| 29.06.2026 | 1 BR | 62.2 | 1 153 000 |
| 26.06.2026 | 1 BR | 63.7 | 1 095 611 |
| 26.06.2026 | 1 BR | 63.6 | 1 092 822 |
| 25.06.2026 | 1 BR | 62.4 | 1 110 290 |
| 24.06.2026 | Studio | 20.4 | 351 161 |
| 18.06.2026 | 1 BR | 62.3 | 1 140 000 |
| 15.06.2026 | 1 BR | 70.1 | 1 082 779 |
| 15.06.2026 | 1 BR | 63.6 | 1 020 729 |
| 08.06.2026 | 1 BR | 67.9 | 1 078 033 |
| 05.06.2026 | Studio | 41.4 | 703 239 |
| 04.06.2026 | 1 BR | 66.7 | 1 073 345 |
| 02.06.2026 | 1 BR | 64.5 | 976 730 |
| 25.05.2026 | 1 BR | 64.4 | 1 013 324 |
| 12.05.2026 | Studio | 41.9 | 724 559 |
| 11.05.2026 | 1 BR | 63.6 | 1 025 581 |
| 11.05.2026 | 1 BR | 70.1 | 1 006 750 |
| 05.05.2026 | 1 BR | 63.4 | 1 110 000 |
Dubai Land Department transaction registry, updated 2026-08-07. Explore Dubai property transactions →
About the project
Laya Courtyard is an active residential and commercial development in Dubai Studio City by Laya Developers. The project comprises two buildings and 289 units, with construction reported at 36.92% completion on 23 March 2026. Its scheduled completion date is 26 December 2026.
The project
Laya Courtyard is configured as a basement, ground-floor, five-storey and roof-level residential and commercial building project. The development comprises two buildings, with 289 units in total. Its recorded total area is 17,898.73. The project began on 1 October 2023 and remains active. The residential and commercial configuration places both uses within the same development, while the two-building arrangement defines the project’s overall built form in Studio City.
Construction status and completion
Construction of Laya Courtyard is active. The reported completion ratio was 36.92% following an inspection dated 23 March 2026. The project start date is 1 October 2023, and the scheduled completion date is 26 December 2026. These dates provide a defined construction timeline from commencement through to the stated end date. The project’s active status and completion ratio identify it as an under-construction development rather than a completed residential address.
Studio City setting
Laya Courtyard is located in Dubai Studio City, a district within the DubaiLand area. Studio City was planned as a film and television production centre, with sound stages, studios, production offices, workshops, backlots, sets and water tanks forming part of its production infrastructure. The district also includes residential buildings, hotels, retail, food and beverage outlets, commercial space and warehouse facilities. Studio City was launched in 2005 and forms part of the media and entertainment cluster under TECOM Investments, a subsidiary of Dubai Holding. The residential offering is clustered near the original studio complex, alongside production and administration facilities.
Parks, golf and leisure nearby
Studio City Park 4 is 0.3 km from Laya Courtyard. Studio City Park 3 is 1.3 km away, and Windsor Park Motor City is 1.4 km away. Trump International Golf Club is 2.2 km from the project, while The Els Golf Club is 2.3 km away and Jumeirah Golf Estates Golf Course is 3.8 km away. Dubai Miracle Garden is 3.1 km from Laya Courtyard. Cinepolis at Circle Mall is 4.0 km away, followed by Reel Cinemas at The Springs Souk at 5.6 km. Global Village is 8.2 km from the project, and Vox Cinemas at Mall of the Emirates is 9.9 km away.
Connections across Dubai
The nearest Dubai Metro reference for Studio City is Red Line station R73, located 9,296 m from the core studio area. Mall of the Emirates is 9.9 km from Studio City. Dubai Marina is 12.0 km away, JBR Beach is 12.6 km away, and Palm Jumeirah is 13.7 km away. Expo City Dubai is also 13.7 km from the district. Business Bay is 16.0 km away, while Burj Khalifa and Downtown Dubai are 17.4 km away and The Dubai Mall is 17.5 km away. Al Maktoum International Airport is 18.6 km from Studio City, and Dubai International Airport is 26.1 km away.
Developer
Laya Courtyard is developed by Laya Developers. The project is identified as a 289-unit, two-building development in Studio City, with a residential and commercial building configuration extending from basement level to the roof. Construction commenced on 1 October 2023, and the scheduled completion date is 26 December 2026. As of the 23 March 2026 inspection, the project had reached a reported completion ratio of 36.92%.























